Loading...
HomeMy WebLinkAboutExhibit 2\il\IL)(r NCB CONSTRUCTION CO. BY FAX TO 305-416-1097 29 January 2007 Mr. James Brittain Construction Project Manager Office of the City Manager 444 SW 2 Ave., 8 FI Miami, FL 33130 Re: City of Miami Orange Bowl Storm Water Pump Station Upgrades B-50653' NCI Job Number 0401 Subject: COR 6 Misc. Adds File: 3.76.000268 Dear Mr. Brittain: Attached Is the estimate for the addition of structural reinforcing at the roof in order to support the remote radiator. Please remember that we are now working with heavy steel members in an enclosed area, and strictly by hand since we can not use mechanical equipment inside the limited space of the pump station. In addition there has been almost a threefold increase in complexity, lineal feet, and diameter of pipe to be used for generator cooling and exhaust, That has greatly impacted the diameter -inches of weld, and insulation. We have also considered that the wood roof will not support the additional weight of the generator exhaust system and have priced a structural frame resting on the floor. The electrical scope of work has also increased. Further materials prices have virtually tripled across the board in the last year. We have given adequate credit, of course, for the original bid estimate scope. The price increase is $80,000.00 Sincerely, Allen J ompson P.E. !30 sw x SRI:RI', SI:ITK 20i! • MIAMI. I1I.011113A • 13031! PHONE: 305.834.41166 • VAX: 3415.11S4 •7066