Loading...
HomeMy WebLinkAboutExhibit 1BID NO. XX-XX-XXX NOTICE TO PRE -QUALIFY CONTRACTORS TO CREATE A POOL OF CONTRACTORS FOR FUTURE CONSTRUCTION AND CONSTRUCTION RELATED WORK TITLE: MISCELLANEOUS CONSTRUCTION CONTRACT Due Date: , 2007. Due Time: 10:00 A.M. — --- ..__.._- .ayour-Manuel A,rDlaz-- - — _- _- Commissioner Angel Gonzalez, District 1 Commissioner Mark David Sarnoff, District 2 Commissioner Joe M. Sanchez, District 3 Commissioner Tomas P. Regalado, District 4 Commissioner Michelle Spence -Jones, District 5 City Manager, Pedro G. Hernandez, P.E. Issued By: City of Miami Department of Capital Improvements and Transportation 444 SW 2nd Avenue, 8th Floor Miami, FL 33130 y-7,./(13 Section 1 - Instructions for Submission 1. intention of City 2. Examination of Contract Documents and Site 3. Contents of Solicitation and Respondent's Responsibilities 4. Pre -Qualification Interpretations 5. Submitting Responses 6. Printed Form for Pre -Qualification 7. Preparation of Submittals 8. Pre -Submittal Conference 9. Method for Selecting Pre -Qualified Firms 10. Environmental Regulations 11. Postponement of Date for Presenting and Opening of Responses 12. Addenda 13. Pre -Qualification Review 14. Solicitation Protest 15. Local, Small, and Disadvantaged Firm Participation 16. Minority /Women Procurement Program 17. First Source Hiring Agreements 18. Local and Minority/Woman Participation Reporting 19. Cone of Silence: 20. Public Entity Crime 21. Fraud and Misrepresentation 22. Collusion 23. Contractor in Arrears of Default 24. Cancellation of Solicitation Section 2 - General Terms and Conditions 1. Definitions 2. Contract Term 3. Liquidated Damages 4. Qualifications 5. Time is of the Essence 6. Notices 7. Priority Of Provisions 8. Indemnification 9. Insurance 10, General Requirements 11. Method of Performing the Work 12. Work Staging and Phasing 13. Site Investigation and Representation 14. Contractor to Check Plans, Specifications and Data 15. Contractor's Responsibility for Damages and Accidents 16. Accidents 17. Safety Precautions 18. Occupational Health and Safety: 19. Environmental Regulations 20. Labor and Materials 21, Rules, Regulations, and Licenses 22. Consultant Services 23. Project Management 24. Superintendence and Supervision 25. Authority of the Project Manager 26. Inspection of Work- 27. Taxes 28. Separate Contracts 292. Lands of Work 30. Coordination of Work- ----- 31. Mounting Heights 32. Differing Site Conditions 33. Existing Utilities 34. Contractor's Responsibility for Utility Properties and Service 35. Interfering Structures 36. Field Relocation 37. Contractor's Use of Work Site 38. Warranty of Materials and Equipment 39. Material and Equipment Shipment, Handling, Storage and Protection 40. Manufacturer's Instructions 41. Manufacturer's Warranty 42. Submittals 43. Shop Drawings 44. Product ❑ata 45. Samples 46. Record Set 47. Supplemental Drawings and Instructions 48. Contractor Furnished Drawings 49. City Furnished Drawings 50. Interpretation of Drawings and Documents 51. Product Tests 52. Field Directives 53. Changes in the Work or Contract Documents 54. Continuing the Work 55. Change Orders 56. Change Order Procedure 57. No Oral Changes 58. Value of Change Order Work 59. Extra Work Directive 60. Field Layout of the Work and Record Drawings for Drainage Projects -.-6-t. -Survey-Work for Drainage Projects) 62. As -Built Drawings 63. Worker's Identification 64. Removal of Unsatisfactory Personnel 65. Substantial Completion, Punch List, & Final Completion 66. Acceptance and Final Payment 67. Asbestos Abatement Requirements 68. Asbestos Permits and Notifications 69. NDPES Requirements 70. Force Majeure 71. Extension of Time 72. Notification and Claim for Change of RPP Time or RPP Price 73. Extension of Time not Cumulative 74. Contractor's Damages for Delay 75. Excusable Delay, Non-Compensable 76. Defective Work 77. Acceptance of Defective or Non -Conforming Work 78. Uncovering Finished Work 79.. Correction of Work 80. Maintenance of Traffic and Public Streets 81. Location and Damage to Existing Facilities, Equipment or Utilities 82, Stop Work Order 83. Hurricane Preparedness 84. Use of Completed Portions 85. Cleaning Up; City's Right to Clean Up 86. Removal of Equipment 87. Set -offs, Withholdings, and Deductions 88. Materiality and Waiver of Breach 89. Termination for Convenience of a RPP or the Contract 90 Event of Default 91. Notice of Default -Opportunity to Cure 92. Termination for Default 93. Remedies in the Event of Termination for Default 94. Termination for Convenience 95. Resolution of Disputes 96. Mediation -Waiver of Jury Trial 97. City May Avail itself of All Remedies 98. Permits, Licenses and impact Fees 99. Compliance with Applicable Laws 100. Independent Contractor 101. Nondiscrimination, Equal Employment Opportunity, and Americans with Disabilities Act 102. Evaluation 103. Commodities manufactured, grown, or produced in the City of Miami, Miami - Dade County and the State of Florida 104. Royalties and Patents 105. Continuation of the Work 106. Review of Records 107. Amendments 108. No interest 109. Payments Related to Guaranteed Obligations 110. Third Party Beneficiaries 111. Consent of City Required for Subletting or Assignment 112. Successors and Assigns 113. Agreement Limiting Time in Which to Bring Action Against the City 114. Defense of Claims 115. Contingency Clause 116. Mutual Obligations 117. Contract Extension 118. Non -Exclusivity 119. Nature of the Agreement 120 Contract Documents Contains all Terms 121. Applicable Law and Venue of Litigation 122. Severability 123. Survival 124. Entire Agreement Section 3 - Supplemental Terms and Conditions 1. License Qualifications of Contractors 2. Subcontracts 3. issuance of Work Under this Contract 4. Awarding Work Assignments 5. Removal from Rotation List 6. Procedures for Obtaining RPP 7. Printed Form of Bid: 8. =-B-grid-B-ased'on Percentage of RPP Price 9. Pre-RPP Conference/Site Visit 10. Request for Clarification/information of an RPP 11. RPP Opening Process 12. Pricing 13. Performance and Payment Bond 14. Qualification of Surety 15. Responsibility of the Contractor 16. City Damages in Case of Delay 17. Notice of Award 18. Contingency Allowance 19. Pre -Construction Meeting 20. Notice to Proceed 21. Schedule of Values 22. Project Schedules 23. Progress Payments 24. Acceptance and Final Payment 25. Release of Liens/Subcontractor's Statement of Satisfaction 26. Hours of Operation 27. Progress Meetings 28. Warranty of Construction 29. Request for Information 30. Substitutions 31. Project Site Facilities 32. Project Laboratory Testing Services 33. City Permits 34. Security 35. Construction Signage 36. Attachments