Loading...
HomeMy WebLinkAboutExhibit 2ATTACHMENT A Clean Vessel Act Grant Program Scope of Work PURPOSE The purpose of the grant is to establish or restore pumpout facilities that are operational and accessible to the general boating public for the useful life of the facilities. The purpose of these conditions is to ensure compliance with 50 CFR Part 85, Subpart D - Conditions on Use/Acceptance of Funds, for the Agreement period, including the five (5) year period extending beyond the date of equipment installation or construction completion. These conditions cover pumpout facilities and equipment purchased with Clean Vessel Act Grant funds. This is a cost reimbursement Agreement with matching requirement based on the amount actually paid by the Department to the Grantee. The Department agrees to pay the Grantee, on a cost reimbursement basis, a grant award in an amount not to exceed $85,127.00 and the Grantee agrees to undertake the project as described and submitted by the Grantee in the Grant Application, CVA 07-480, and provide a minimum 25% non-federal matching funds. The project is located at Dinner Key Marina, 3400 Pan American Drive, Miami, Florida 33133. CONDITIONS Reimbursement for Project installation 1. The Grantee shall obtain all required permits and approvals prior to commencement of the project. A grant award is not an indication of permitability of a project. A Permit Certification _-.--- -_Former--s ,ppfied-by-the--Depat#r ent; shall -be -:sent to-an-d-be urr file-wIth-the-Departmnt before invoices will be processed for payment. 2. Match documentation shall be provided .in accordance with instructions and on forms available from the Department. Any credit for the match by the Grantee shall be based on forms completed and documented to the satisfaction of the Department. 3. Grantee invoices will be processed by the Department in an expeditious manner upon presentation of all required documents as outlined in Paragraphs 5.B. through S.E. of this Agreement. The Department shall have fifteen (15) days to review and approve all invoices and reports. Upon review and approval of each invoice and report, the Department will process the invoice for payment. 4. The final invoice shall be accompanied by a completed and signed project completion form to be provided by the Department, an operational plan as described in Condition 1 of the Operations section of this Attachment, a description of the operational log required under Condition 8 of the Operations section of this Attachment, and photographs of the completed project. Operations 1. The pumpout facility or dump stations will conduct its operations under an operational plan of the Grantee that specifies hours of operation, maintenance principles, methods in determining volume of material pumped including the use of flow meters as may be necessary, information/educational materials on pumpout operation and assurances that the pumpout facility or dump station will be used solely for the collection of boat sewage. This plan will be submitted with the certification of project construction completion. 2. Each pumpout facility or dump station funded under this project shall be open and available to the recreational boating public. Each pumpout facility or dump station shall be operated, DEP 55-240 (12/05) DEP Agreement No. LE638, Attachment A, Page 1 of 3 maintained, and continue to be reasonably accessible to all recreational vessels for the full five year period as described and set forth in Paragraph 4 of this Agreement. 3. The Grantee will provide marine sanitation and pumpout information for boat owners and training for pumpout operators. These services may be provided through such methods as information materials, on site instruction or audio-visual methods by the marina owner/operator, equipment vendors, harbormaster or local government personnel. 4. The location of each pumpout facility or dump station will be continually identified through informational markers using the international pumpout logo on a sign of at least three feet by four feet in size. All informational markers located on the waters of the state shall be with prior approval of the Department as required by permitting procedures established by Florida Statutes and the Florida Administrative Code. 5. Informational placards stating fees, hours of operations, instructions, and operator name and telephone number shall be posted in a clearly visible location on the station housing. The placard shall have posted emergency phone numbers for reporting service problems and shall include the following statement: Funded in part by the U. S. Fish and Wildlife Service, Clean Vessel Act Program and the Florida Inland Navigation District's Cooperative Assistance Program through the Florida Department of Environmental Protection, Division of Law Enforcement. 6. Pumpout facilities will be designed and operated in accordance with state and local health regulations. 7. Pumpout or dump station services will be provided free of charge or for a fee not to exceed $5 per vessel. Fees greater than $5 require prior written approval by the Department of an itemized operational cost justification. Fee accounting will be provided with the annual log described below. If fees are collected, such proceeds shall be retained, accounted for, and used by the operator exclusively to defray operation and maintenance costs of the pumpout equipment and associated materials. 8. The pumpout operator shall maintain an operational log to be submitted to the Department the first day of each calendar quarter beginning with the quarter during which completion of construction or installation of equipment occurred. The log shall document use of the equipment by number of pumpout services events, gallons pumped, fees charged, and maintenance, labor, or other operational costs incurred. Volume of sewage handled must be determined as described in the approved operational plan. Costs may be estimated unless greater than $5 fees are charged. Collections of higher fees require detailed accounting of operational costs through a method included in and approved with the operational plan. REMAINDER OF PAGE INTENTIONALLY LEFT BLANK DEP 55-240 (12/05) DEP Agreement No. LE638, Attachment A, Page 2 of 3