Date: 5/23/06
CONCURRENCY MANAGEMENT ANALYSIS
CITY OF MIAMI PLANNING DEPARTMENT
IMPACT OF PROPOSED AMENDMENT TO LAND USE MAP
WITHIN A TRANSPORTATION CORRIDOR
AMENDMENT INFORMATION
CONCURRENCY ANALYSIS
•
Applicant: A. Vicky Garcia -Toledo on behalf of Katia Traikos, Inc
Address: 399 NE 82nd Terrace
Boundary Streets: North: n/a East: n/a
South: NE 82nd Terrace West: NE 4th Avenue
Proposed Change: From: Single Family Residential
To: Medium Density Multifamily Residential
Existing Designation, Maximum Land Use Intensity
Residential 2.59 acres @ 9 DU/acre 23 DU's
Peak Hour Person -Trip Generation, Residential 33
Other sq.ft. @ FAR 0 sq.ft.
Peak Hour Person -Trip Generation, Other
Proposed Designation, Maximum Land Use Intensity
Residential 2.59 acres @ 65 DU/acre 168 DU's
Peak Hour Person -Trip Generation, Residential 137
Other sq.ft. @ FAR 0 sq.ft.
Peak Hour Person -Trip Generation, Other 0
Net Increment With Proposed Change:
Population 373
Dwelling Units 145
Peak Hour Person -Trips 104
Planning District Little Haiti
County Wastewater Collection Zone 308
Drainage Subcatchment Basin C4
Solid Waste Collection Route 2
Transportation Corridor Name NE 2nd Avenue
RECREATION AND OPEN SPACE
Population Increment, Residents 373
Space Requirement, acres 0.48
Excess Capacity Before Change 182.80
Excess Capacity After Change 182.32
Concurrency Checkoff OK
POTABLE WATER TRANSMISSION
Population Increment, Residents 373
Transmission Requirement, gpd 83,497
Excess Capacity Before Change >2% above demand
Excess Capacity After Change >2% above demand
Concurrency Checkoff OK
SANITARY SEWER TRANSMISSION
Population Increment, Residents 373
Transmission Requirement, gpd 68,959
Excess Capacity Before Change See Note 1.
Excess Capacity After Change See Note 1.
Concurrency Checkoff WASA Permit Required
STORM SEWER CAPACITY
Exfiltration System Before Change On -site
Exfiltration System After Change On -site
Concurrency Checkoff OK
SOLID WASTE COLLECTION
Population Increment, Residents 373
Solid Waste Generation, tons/year 477
Excess Capacity Before Change 800
Excess Capacity After Change 323
Concurrency Checkoff OK
RELEVANT MCNP GOALS, OBJECTIVES, AND POLICIES
Land Use Policy 1.1.1
CIE Policy 1.2.3
TRAFFIC CIRCULATION
Population Increment, Residents 373
Peak -Hour Person -Trip Generation 104
LOS Before Change B
LOS After Change B
Concurrency Checkoff OK
NOTES
1. Permit for sanitary sewer connection must be issued by
Metro -Dade Water and Sewer Authority Department (WASA).
Excess capacity, if any, is currently not known
rM 1 IN f13/1 t/9r1
ASSUMPTIONS AND COMMENTS
Population increment is assumed to be all new residents. Peak -period trip
generation is based on ITE Trip Generation, 5th Edition at 1.4 ppv average
occupancy for private passenger vehicles. Transportation Corridor capacities and
LOS are from Table PT-2(R1), Transportation Corridors report.
Potable water and wastewater transmission capacities are in accordance with
Metro -Dade County stated capacities and are assumed correct. Service
connections to water and sewer mains are assumed to be of adequate size; if not,
new connections are to be installed at owners expense.
Recreation/Open Space acreage requirements are assumed with proposed
change made.