Loading...
HomeMy WebLinkAboutCC School Impact Review Analysis'REVISED' SCHOOL IMPACT REVIEW ANALYSIS June 19, 2006 FOR iNFOR1` ATINAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL AGREEMENT ENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE THE SCHOOLS THAT WOULD SERVE THE PROPOSED DEVELOPMENT ARE UNDER THE 115% THRESHOLD CAPACITY. APPLICATION: REQUEST: ACRES: LOCATION: MSAI MULTIPLIER: NUMBER OF UNITS: ESTIMATED STUDENT POPULATION: ELEMENTARY: MIDDLE: SENIOR HIGH: Katia Taikos, Inc. (Continued from the June 7, 2006 PAB Meeting) Change Land Use from "Single -Family Residential" (9 DU/acre) to "Medium Density Multifamily Residential" (65 DU/acre) +2.59 net acres Approximately 399 NE 82 Terrace, Miami 4.1/ .51 Single -Family Detached and .23 Multifamily 145 additional units Existing Zoning Proposed Zoning 23 168 27 additional students 12 39 12 7 8 SCHOOLS SERVING AREA OF APPLICATION ELEMENTARY: MIDDLE: SENIOR HIGH: Phyllis R. Miller Elementary — 840 NE 87 Street Horace Mann Middle — 8950 NW 2 Avenue Miami Edison Senior High — 6161 NW 5 Ct. All schools are located in Regional Centers IV. *Based on Census 2000 information provided by Miami -Dade County Department of Planning and Zoning. The following population and facility capacity data are as reported by the Office of Information Technology, as of October 2005: STUDENT POPULATION FISH DESIGN CAPACITY PERMANENT % UTILIZATION FISH DESIGN CAPACITY PERMANENT NUMBER OF PORTABLE STUDENT STATIONS % UTILIZATION FISH DESIGN CAPACITY PERMANENT AND RELCOATABLE CUMULATIVE STUDENTS" Phyllis R. Miner Elementary 762 703 108% 0 1 08% 774 774 * 110% 11O% Horace Alarm Middle 1,013 1,399 72% 0 72% 1,030 1,020 73% 73% Miami Edison Senior High 1,240 1,696 73% 166 67% 1,342 1,248 74% 67/Q *Student population increase as a result of the proposed development **Estimated # of students (cumulative) based on zoning/land use log (2001- present) and assuming all approved developments are built; also assumes none of the prior cumulative students are figured in current population. Notes: 1) Figures above reflect the impact of the class size amendment. 2) Pursuant to the Interlocal Agreement, none of the schools meet the review threshold. PLANNED RELIEF SCHOOLS IN THE AREA (Information included in proposed 5-Year Capital Plan, 2005-2009, dated April 2005) Projects in Planning, Design or Construction School Status N/A Proposed Relief Schools School N/A Projected Occupancy Date School Funding Year OPERATING COSTS: Accounting to Financial Affairs, the average cost for K-12 grade students amounts to $6,549 per student. The total annual operating cost for additional students residing in this development, if approved, would total $176,823. CAPITAL COSTS: Based on the State's June 2006 student station cost factors*, capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY MIDDLE SENIOR HIGH 12 7 8 Total Potential Capital Cost x 18,057 = $216,684 x 19,500 = $136,500 x 25,328 = $202,624 $555,808 *Based on Information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per student station does not include land cost.