Scope of Work
AGENCY: City of Miami
CIP Project: #331413
STATE JOB NUMBER: FM2512621-5$-01
PROJECT TITLE: Jose Maria Park River Walk/Grcerway Extension (formerly in the TIP as
Ft. Dallas Park River Walk)
DESCRIPTION OF PROPOSED WORK:
The overall project has 4 distinct segments. This description pertains to the part of the
project taking place on the property to the south of the Jose Marti Park pool, on
property leased by the City from FDOT, where FDOT is installing a new seawall. At this
site, the city will construct a river walk With pavers and a tactile surface adjacent to the
bulkhead. This river walk will connect to the existing walk at the waters edge within the
park proper, and, on the opposite end, will link to an on -road, southern leg of the Miami
River Greenway system. The project also involves construction of additional site
improvements including irrigation, landscaping, lighting, and the installation of benches
and fencing (see Figure A).
A second segment (see Figure B) is located adjacent to this parcel at the junction on SW
4c' Street and SW arc Avenue at the River. Here, the City will define the park entry and
roadway by installing new lighting, sidewalk with pavers, curb and gutter, lighting,
landscaping and fencing. The last segments flow north and south from the park, and
consist of new sidewalk, curb and gutter, landscaping and lighting following existing
rights of way (see Figure C). The southern path funs along SW 3rd Avenue to 6t`` Street,
then east to approximately 2' Avenue. The northern route runs along SW 4tr Street
from the existing northernmost park path to South River Drive, then South River Drive
to approximately NW '7G' Avenue. The route is subject to change (reductionfexpenasion)
based on project funding as design progresses.