Loading...
HomeMy WebLinkAboutScope of WorkExhibit A Scope of Work AGENCY: City of Miami CIP Project: #331413 STATE JOB NUMBER: FM2512621-5$-01 PROJECT TITLE: Jose Maria Park River Walk/Grcerway Extension (formerly in the TIP as Ft. Dallas Park River Walk) DESCRIPTION OF PROPOSED WORK: The overall project has 4 distinct segments. This description pertains to the part of the project taking place on the property to the south of the Jose Marti Park pool, on property leased by the City from FDOT, where FDOT is installing a new seawall. At this site, the city will construct a river walk With pavers and a tactile surface adjacent to the bulkhead. This river walk will connect to the existing walk at the waters edge within the park proper, and, on the opposite end, will link to an on -road, southern leg of the Miami River Greenway system. The project also involves construction of additional site improvements including irrigation, landscaping, lighting, and the installation of benches and fencing (see Figure A). A second segment (see Figure B) is located adjacent to this parcel at the junction on SW 4c' Street and SW arc Avenue at the River. Here, the City will define the park entry and roadway by installing new lighting, sidewalk with pavers, curb and gutter, lighting, landscaping and fencing. The last segments flow north and south from the park, and consist of new sidewalk, curb and gutter, landscaping and lighting following existing rights of way (see Figure C). The southern path funs along SW 3rd Avenue to 6t`` Street, then east to approximately 2' Avenue. The northern route runs along SW 4tr Street from the existing northernmost park path to South River Drive, then South River Drive to approximately NW '7G' Avenue. The route is subject to change (reductionfexpenasion) based on project funding as design progresses.