Loading...
HomeMy WebLinkAboutExhibitFLORIDA FISII AND WILDLIFE CONSERVATION COMMISSION FLORIDA BOATING IMPROVEMENT PROGRAM GRANT APPLICATION FOR BOAT ACCESS FACILITIES Fiscal Year 2007-2008 FOR OFFICE USE ONLY Grant Application Number Date Received: Fill in all sections that apply - Leave all other sections blank I - APPLICANT INFORMATION a. Organization Name: City of Miami, Public Facilities Department e. Project Manager Name: Stephen Bogner Project Manager Title: Marinas Manager b. Federal Employer Id. No.: c. Applicant Name: Robert Ruanor Applicant Title: Director of Grants Administration f. Mailing Address: 3400 Pan American Dr. City: Zip Code: Miami 33133 d. Applicant Address: 444 SW 2nd Ave City: Zip Code: Miami 33130 g. Telephone: Fax: Suncom: 305.579.6950 305.579.6952 Email: sbogner@miamigov.com h. District Numbers: State House: State Senate: County Commission: II - PROJECT SUMMARY a. Project Title: b. Type of Application: ►/ New (never considered before) ❑ Reconsideration ❑ Phased Continuation —Phase No.: c. Type of Project: TIER -I TIER -II ❑ A — Boat Ramp ❑ A — Boat Ramp ❑ B — Marina Facility (Piers/Docks) ❑ C — Other Mooring Facility /1 B — Lift, Hoist, Marine Railway ❑ C — Other Public Launching Facility d. Project Cost: Total Cost: $ 201,767 Amount Requested: $ 100,883 e. Project Summary: The Stadium Marina owned by the City of Miami, is a busy recreational boating ramp and dry dock for 213 existing dry dock slips with a proposed 87 slips added by the end of 2007. In addition, the City of Miami routinely services boats owned by the Coast Guard, Fish and Wildlife Commission, and individuals putting their boats in for the day. This requires two fully functional lifts. Currently, the City of Miami's equipment is five and nine years old respectively. The nine year old vehicle is entering the end of its usefulness particularly when the expansion of the dry docks occurs in 2008. To meet the needs of the boaters using this equipment daily, the City of Miami is requesting funding to purchase a full free lift to replace the nine year old equipment currently used at the Statdium Marina. FWC/FBIP-B (02/07) 1 III — PROJECT LOCATION a. County: Miami -Dade County b. Water body: Biscayne Bay and c. Latitude: Longitude: 25.39.1 N 80.09.1 W d. Facility Street Address or Location: 3501 RICKENBACKER CAUSEWAY MIAMI, FL. 33149 IV — PROJECT DESCRIPTION a. List Primary Need for Project: ❑ Safety ❑ High Demand by Users ►1 Age -end of Useful Life ❑ Recommended by FWC Staff ❑ Environmental Needs of the Area ❑ Lack of In-house Capability ❑ Other: b. Need Statement: The Marine Stadium Marina, located on Virginia Key in Biscayne Bay and adjacent to the Atlantic Intracoastal Waterway, is one of Miami-Dade's largest full -service dry storage facilities. The marina currently has a 300 berth capacity, which is slated to increase to 500 berths in 2008. The marina can service vessels up to 45 ft., and provides storage and hauling services for vessels from the Miami Police Department Marine Patrol Division, Key Biscayne Marine Patrol, and Florida Fish & Wildlife Conservation Commission, along with the facility's service and repair tenant. The marina has been permitted for the addition of an additional 75 dry storage rack spaces, which will be constructed within the next several months and will provide much -needed berths for a significant number of boaters. Daily, the two boatlifts move five vessels daily, for a total of over 18,000 moves apiece for a grand total of 36,000 moves completed annually. The two forklift trucks completing the dry dock lifts are Wiggins Lift Trucks which are five and nine years old. These machines operate seven days a week at an average of 10 hours per day each. Due to exposure to the detrimental effects of salt, water, hurricanes and of course operational wear from the high volume of lifts completed daily, the oldest of the two trucks is in need of replacement. Without replacement, this forklift will soon become unrepairable, forcing the marina to rely on one forklift. This clearly will be inadequate to service the volume of recreational boaters, particularly with the expansion of the dry dock storage. Already, breakdowns and repairs to the older machine have reduced the number of customer vessels able to be accommodated and thus recreational opportunities to the boating public. The City of Miami is requesting grant funding to assist in the purchase of a replacement fork lift truck for the facility. c. Project Tasks: Month One: 1. Secure bids for competitive pricing of the unit described Month Two: 2. Purchase unit and complete any additional training necessary. Month Three: 3. Dispose of outdated equipment. FWC/FBIP-B (02/07) 2 d. Project Benefits: The proposed project will have dramatic impact on the capacity of the Stadium Marina in serving recreational boaters. Many boaters use the marina because of its affordable prices and convenience of location both in terms of reaching the marina and in the different bodies of water immediately adjacent to it. The City of Miami is dedicated to expanding the recreational opportunities for boaters in South Florida and has begun expansion of the dry dock storage to accommodate demand. Without two fully operational forklifts, the access for recreational boaters will be severely reduced. Secondly, the current forklifts were produced prior to the implementation of environmental standards industrywide. The proposed forklift, due to improved technology and fuel processing, should have a reduced impact on the environment through clearner emissions and leakages. V — PROJECT ELEMENTS Engineering / Planning Renovate / Repair Expansion New Construction Boat Ramp ❑ ❑ ❑ ❑ Boarding Dock ❑ ❑ ❑ ❑ Parking ❑ ❑ ❑ ❑ Access Road ❑ ❑ ❑ ❑ Restroom ❑ ❑ ❑ ❑ Lift, Hoist ❑ ❑ ❑ ►� Marine Railway ❑ ❑ ❑ ❑ Mooring Docks ❑ ❑ ❑ ❑ Pilings ❑ ❑ ❑ ❑ Mooring Buoys ❑ ❑ ❑ ❑ Pumpout Dock ❑ ❑ ❑ ❑ Fueling Station ❑ ❑ ❑ ❑ Electrical Hook-up ❑ ❑ ❑ ❑ Dredging ❑ ❑ ❑ ❑ Erosion Control / Shoreline Stabilization ❑ ❑ ❑ ❑ Other: ❑ ❑ ❑ ❑ VI - PROJECT ENGINEERING AND CONSTRUCTION FWC/FBIP-B (02/07) 3 X - PERMITS Submitted Approved N/A a. Florida Department of Environmental Protection ❑ ❑ �� b. Florida Fish and Wildlife Conservation Commission* ❑ ❑ �� c. U.S. Army Corps of Engineers ❑ ►� d. Local and Others (If needed) ❑ ❑ ►� * For mooring buoy projects, a Florida Uniform Waterway Marker Application must be submitted to FWC prior to submittal of the grant application. XI — ENVIRONMENTAL ASSESSMENT a. Will the project significantly or adversely affect the environment? b. If Yes, please explain key issues and describe any mitigation actions proposed. YES NO XII — BOATER SAFETY a. Explain how the project may affect boater safety whether positively or negatively. Boaters using the Stadium Marina expect that their boats will be safely transported to and from the dry dock area or to their method of transport. Without fully functional equipment, boats may be damaged in the transport process. This exposes boaters to unnecessary risk on the water. Further, the volume of boats that currently use the marian as well as those projected to use the marina with the 2008 expansion of the dry docking facility will be reduced, forcing recreational boaters to use other, non -municipal marinas. This will hinder access and safety due to either higher prices or marinas operating without the same high standard of safety compliance that the City of Miami imposes on its faciltiies. FWC/FBIP-B (02/07) XIII — APPLICATION ATTACHMENTS CHECKLIST Submit one (1) electronic copy on CD or floppy disk and seven (7) photocopies of the application with attachments. Inc. - - - Required Attachments - - - a. Cover Letter: application transmittal cover letter (Identify priority rank with multiple applications). ❑ b. Application: One (1) application with original signature from authorized individual. ❑ c. Resolution: An adopted resolution, by the Governing Body, authorizing that the Project Manager has the authority to apply for and administer the grant on behalf of the applicant. If the Applicant is applying on behalf of another public entity, then a Memorandum of Understanding between the Applicant and the public entity must also be submitted. ❑ d. Boundary Map: indicate boundary of the project area. ❑ e. Site Control Documentation: (e.g. a deed, lease, results of title search, etc. for the project site.) ❑ f. Existing Condition Photographs (sufficient to depict the physical characteristics of the project area) ❑ g. Aerial Photographs (marked with the approximate boundaries of the project site) ❑ h. Navigational Chart: An 8.5" x 11" photocopy of a current NOAA North American Datum 83 nautical chart (provide the NOAA chart name and number) indicating the precise location of the project site. - - - Optional Attachments - - - i. Detailed Cost Estimate: Cost estimate in the form of a formal bid, written quote from proposed vendor or an engineer's cost estimate. ❑ j. Plans: preliminary design/engineering plans (if completed). ❑ k. Permits: Photocopies of necessary project permit(s) or permit application(s). If exempt, provide notification of exemption from permitting agency. ❑ 1. Support/Opposition: Attach letters of known public support or known public opposition. APPLICANT SIGNATURE Application is hereby made for the activities described herein. I certify that I am familiar with the information contained in the application, and, to the best of my knowledge and belief, this information is true, complete, and accurate. I further certify that I possess the authority including the necessary requisite property interests to undertake the proposed activities. I also certify that the Applicant's governing body is aware of and has authorized the Project Manager as the official representative of the Applicant to act in connection with this application and subsequent project as well as to provide additional information as may be required. By signature below, the Applicant agrees to comply with all applicable federal, state, and local laws in conjunction with this proposal and resulting project so approved. Print/Type Name Applicant Signature Title Date STATE OF FLORIDA, COUNTY OF Personally appeared before me this day of , 200 , , who subscribed and swore to the above instrument in my presence. Notary Public Name: My commission expires: NOTE: Instruction and further information regarding this application and the Florida Boating Improvement Program can be found in the Florida Boating Improvement Program Procedure Guide or you may contact the Program Administrator at: Florida Fish and Wildlife Conservation Commission, Florida Boating Improvement Program, 620 South Meridian Street, Tallahassee, FL 32399-1600; or call (850) 488-5600; or email fbip(c,MyFWC.com. FWC/FBIP-B (02/07) 8 FLORIDA FISH AND WILDLIFE CONSERVATION COMMISSION FLORIDA BOATING IMPROVEMENT PROGRAM Instructions for completing the 2007 Grant Application for Boat Access Facilities General Instructions: • Submit one (1) original and seven (7) copies. • Submit an electronic copy of application on CD or floppy disk. • Staple application in upper left-hand comer, or clip with one binder clip. DO NOT SPIRAL BIND OR PLACE IN A THREE-RING BINDER OR REPORT COVER. • Please place a tabbed divider between each attachment. • Please make all photocopies of attachments on paper no larger than 11" x 17". I — APPLICANT INFORMATION a. Organization Name: Enter the name of the governmental entity applying for the grant. b. Federal Employer Id. No.: Enter the applicant's Federal Employer Identification (FEID) Number. Payment will be sent to the address associated with this FEID number. c. Applicant Name: Applicant Title: Enter the name and title of the individual authorized to sign contracts/agreements for the organization. (ie. Chairman, Mayor, etc.) If authority has been delegated through ordinance or resolution, please include a copy of the delegation with the application. d. Applicant Address: City: Zip Code: Please enter the official address of the governmental agency (ie. board of county commissioners, city commission, etc.) e. Project Manager Name: Title: Enter the name and title of the person in charge of the project. All correspondence will be sent to this person. f. Mailing Address: City: Zip Code: Enter the mailing address for the Project Manager. All correspondence will be sent to this address. If a P.O. box, please include a street address also for ovemight deliveries. g. Telephone No.: Fax No.: Suncom No.: E-mail: Enter the telephone number, fax number, Suncom telephone number (if applicable), and email address where the Project Manager may be contacted during regular business hours. h. District Numbers: Enter the District numbers for the State House, State Senate and the County Commission for the project location. Page 9 of 13 II — PROJECT SUMMARY a. Project Title: Provide a brief title for the project. b. Type of Application: Check "New" if you have never applied for FBIP funding for this project. Check "Reconsideration" if you have applied before but did not receive funding. Check "Phased Continuation" if the project has previously received FBIP funding. c. Type of Project: Check only one type of project. Refer to the guidelines for project type descriptions. Application will be ranked only against other applications within the same project type. If the total project includes more than one type of project, please select the project type that is most appropriate, or submit more than one application. The Commission reserves the right to re -assign project type to maximize funding. d. Project Cost: Enter total amount of project cost, including only the eligible project elements where grant funds will be used. Enter the amount of funds requested from FBIP (rounded to the nearest dollar). e. Project Summary: Provide a brief description of the goal of the project, the work to be done and the expected outcome or final product. III — PROJECT LOCATION a. County: Enter the name of the county where the project is located. b. Water body: Enter the name of the water body where the project is located or the water body vessels will launch into. c. Latitude / Longitude: Enter the latitude and longitude of the project location in degrees and decimal minutes (ie. Latitude = N28° 35.26' Longitude = W-82° 45.33' d. Facility Street Address or Location: Enter the street address or location to access facility by roadway. IV - PROJECT DESCRIPTION a. List Primary Need for Project: Check the category that is most applicable. b. Need Statement: Briefly describe why this project is needed. Explain any existing problems and how this project will correct the problem. c. Project Tasks: Describe in detail the exact work to be completed. d. Project Benefits: Describe how this project will enhance boating in the local community. Page 10 of 13 V — PROJECT ELEMENTS Check only those elements of the project that will use grant funding. Note: elements must be completed before FWC will reimburse costs. Indicate the type of construction: Engineering/Planning (no -construction); Renovate/Repair (replace or repair existing facilities with no increased capacity); Expansion (increase boat access by adding more boat launch lanes, more docks, increased parking, etc.); New (construction of a facility, or adding a new amenity to an existing facility where none existed before) VI - PROJECT ENGINEERING AND CONSTRUCTION a. Who is or will be completing project design/engineering? Please check as appropriate. b. Level of engineering completed at time of application: Please check as appropriate. If engineering is complete (conceptual, preliminary, or final), please include a copy of the plans with your application. c. Preferred period of construction (based on user activity, weather and water level): Please check as appropriate. VII - GENERAL FACILITY INFORMATION a. Facility Name: Describe existing conditions by checking all that apply. For new facilities, provide information as facility is proposed to be and check "New" for questions about condition of facility. b. Type of Facility: c. Upland Ownership: d. Is this facility open to the general public? e. Estimate Percent (%) Use of Launching Facility: f. Day Use, Parking or Launch Fee Amount: g. Number of Launch Lanes: h. Length of Boarding Docks: i. Number of Boat Trailer Parking Spaces: j. Length of Tie-up Dock or Moorage: k. Other Facility Attributes: 1. Names of adjacent boating facilities, public and private (ramps, tie-up facilities/marinas) within a 10-mile radius. Page 11 of 13 VIII — BUDGET a. Has a detailed cost estimate been developed for this project? Indicate whether a preliminary or final cost estimate has been developed. If yes, attach a copy of the estimate to the application. b. PROJECT COST - NON- CASH FUNDS* Enter amount of in -kind matching funds for each cost item. Amounts in "Other" column should include in -kind funds from any third -party agreements (provided by someone other than the applicant). *Please note: All applications must include some form of non -cash matching funds. c. PROJECT COST - CASH FUNDS Enter amount of funding to be provided by the applicant and other sources. Enter the amount of funding requested in the column labeled "FBIP." d. TOTAL FUNDS Sum of non -cash funds and cash funds for each column. IX - OTHER SOURCE OF FUNDS (STATUS) Include information on funding from sources other than FBIP or applicant. Enter information for each funding source. a. Funding Source: Check source of funds: Federal grant, State/Local grant, or loan. b. Grant Name: Enter name of grant program. c. Approval Status: Enter status of grant/loan application. If "Intending to Apply", enter date of application deadline. X — PERMITS a. Florida Department of Environmental Protection b. Florida Fish and Wildlife Conservation Commission c. U.S. Army Corps of Engineers d. Local and Others (If needed) Check status of all permit applications. If project type does not require permits, or project is exempt from permitting requirements, check "N/A". If applicable, attach a photocopy of all permits or permit applications. If project is exempt, attach a copy of exemption notification. Note: For projects involving mooring buoys, a Florida Uniform Waterway Marker Application must be submitted to FWC prior to submittal of the grant application. A copy of the Florida Uniform Waterway Marker Application may be downloaded at http://MyFWC.com/boating/waterways/ Page 12 of 13 XI - ENVIRONMENTAL ASSESSMENT a. Will the project significantly or adversely affect the environment? b. If Yes, please explain key issues and describe any mitigation actions proposed. Explain how the project will have a significant or adverse affect on the environment and include information on the impacts to water quality, wetlands, seagrasses, imperiled species, etc. XII — BOATER SAFETY a. Explain how the project may affect boater safety whether positively or negatively. Provide explanation of how the project may improve boater safety (i.e. increased education, increased law enforcement, etc.) or, explain any potential boater safety hazards and how they will be corrected. Also, please indicate if the project will have no effect on boater safety. XIII — APPLICATION ATTACHMENTS CHECKLIST Indicate which attachments have been included with the application. Required attachments must be included or application will be deemed incomplete. Optional attachments may be omitted, but applications with optional attachments included will receive a higher score during evaluation. Please place a tabbed divider between each attachment. Submit one (1) original (with original signature) and seven (7) photocopies* of the entire application with attachments. Completed applications should be in the following order: Cover Letter, Application Form, Attachments in the order they are listed on the checklist. *Only one (1) copy of the site control documentation and permits or permit applications is necessary. Page 13 of 13 Wiggins Lift Co. Inc. Unique Lift Truck Systems ' Engineered for the Owner, Designed for the Operator March 13, 2007 Mr. Steve Bogner City of Miami for Marine Stadium Marina 3501 Rickenbacker Cosway Key Biscayne, FL 33149 USA Ph: 305-579-6955 / Fax: 305-579-6957 RE: Quotation / Information W220M2-35/12-130, Wiggins Lift Co. Inc. Marina Bul1TM Forklift Trucks Dear Mr. Steve Bogner, Thank you for the opportunity to quote your forklift needs. Please visit our web site at: www.wigginslift.com It was good to hear from you / Ross Gregg, Mike Wiggins concerning information and a quotation on the above Marina Bu1ITM Forklift truck. See enclosed. The quotation includes the added options that your current unit has including the special lift/lowered heights, solid non mark tires, fuelsep, lace style fork covers with galvanized forks / console, & the center mount operator console. Will follow up with hard copy of quotation, pictures of our product, information on our company along with a video on Marina Trucks in use. As you know, we offer most units in the Side mount. (which is the operator sitting to the left side of the tout) Center mount center cylinder offset operator, (which is the operator sitting 11" off center of the center of the Mast, that way he is looking in- between the cylinder in the mast and the left rail of the mast) as well as Center mount quad cylinder wide clear view. (That is the operator sitting in the center, with quad cylinders in the mast so that the center of the mast is open / option) (See pictures) Please note the options page sent with quotation, it includes galvanizing options of the Forks, operator console, & carriage. Quad cylinder mast with center mount operator console, side shifting fork positioning forks /carriage instead of the swing style. and other options that may be of interest, 2571 Cortez Street, Oxnard, CA 93036 * P. 0 Box 5187, Oxnard, CA 93031-5187 Ph. (805) 485-7821 * Fax (805) 485-5230 * www.wigginslift.com The customer information sheet with a picture of a boat with dimensions is for helping in selecting the correct sire Forklift for the size of boats that you want to handle. The layout of the Marina Building drawing is for the same, helping in selecting the correct wheel base in reference to aisle width at your location. We have included tax information that we have come across that might be of interest. This quote will be good for 30 days and shipping time would be 45-60 days from date of purchase. Lead nines could change based on time of order. Thank you for your interest and if there is any further information we can provide please call, fax or email. Respectfully, WIGGINS LIFT CO., INC. Pat Shinder ph : 805-485-7821 / fax: 805-485-5230 email: pats@wigginslift.com cc: Mike Wiggins, President Jack McDowell, V.P., General Mgr. Ross Gregg: Voice: 800-699-0962 web:http://www.gregglifttrucks.com Wiggins Lift Co. Inc. 257] Cortez Street, Oxnard, CA 93036 * P. 0 Box 5187, Oxnard, CA 93031-5187 Ph. (805) 485-7821 * Fax (805) 485-5230 * www.wigginslift.com Marine Stadium Marina 03/13/07 QUOTATION # 0307054 (1) WIGGINS MODEL W220M2-35/12 SPECIFICATIONS Mast Two -Stage, Full Free -Lift, with a safety indicator line to alert operator when inner mast section is in safe carry position Corrosion Package Zinc primer base coat, Epoxy intermediate primer, 2 part urethane top paint coatings, 15 mil frame undercoating, Stainless steel rods & rod ends on swing cylinders. Stainless fittings on carriage. Capacity 22,000 lb. @ 96" load center to 8' (74,667 lb. @144" LC) Capacity 18,000 lb. @ 96" load center to 15'(13,500 lb. O144" LC) Capacity 12,500 Ib. @ 96" load center to 35'(9,375 1b. @144" LC) Lift Height M2 35' positive 12' negative (measured from ground to top of fork) Lowered Height M2 290" Fork Length 20' Rubber covered Marina Forks (galvanized) Carriage 104" Wide (galvanized) Fork Positioners Hydraulically Actuated Fork Swing. Fork Spread 150" Open to 20" ID Closed Side Shift 18" Side Swing Engine Perkins 6 cylinder Turbo Diesel powered water cooled engine, developing 174 horsepower. Engine protection Coolant temp / Low oil pressure Transmission Power -Shift, with (3) forward speeds and (3) reverse speeds Front Drive Axle Deere Planetary with inboard, hydraulically actuated wet disc brakes Rear Steer Axle Pivotal center trunion axle with a balanced double ended steer cylinder, eliminating the need fora drag link Tires Front Drive: 12:00 X 20, Dual (solid black lug) Rear Steer: 12:00 X 20, Single (solid black smooth) Width 118" Side Mount Wheel Base 130" standard Length 208" Turning Radius 219" Empty Weight 71,500 Ib. approx. Operator Console Side Mount Operator Console (galvanized or composite) adjustable suspension seat, mirrors, and roof window Working Lights Front & rear working lights Safety Equipment Back-up alarm, horn, amber flashing light, and (galvanized) FOPS over head protection Gauges Oil Pressure, Tcmp, Volt, Hour Meter, Fuel Stabilift 3 Light Safety System Undercoating Underside frame / bottom 4' of Mast QUOTED PRICE FOB OXNARD / Delivered & set up W220M2 H35/12 WITH 35' POSITIVE LIFT $201,767.00 DOWN PAYMENT $35,000.00 Terms: Balance due at delivery less any down payments ACCEPTED BY PO# DATE These prices do not include any local or state sales taxes that may be applicable These prices are based on today fuel costs & delivery, a fuel surcharge may be added