HomeMy WebLinkAboutExhibit 2STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION
LOCAL AGENCY PROGRAM AGREEMENT
EXHIBIT "A"
PROJECT DESCRIPTION AND RESPONSIBILITIES
FPN:
525-010-40
PROJECT MANAGEMENT OFFICE
osroe
Pepe
This exhibit forms an integral part of the Agreement between the State of Florida, Department of Transportation and
The City of Miami. Florida with offices at 444 S.W. 211J Avenue, Miami, FL 33130 for the North Spring GardenlEast
Allapattah Greenway
Dated
PROJECT LOCATION:
The project is X is not on the National Highway System.
The project is X is not on the State Highway System.
PROJECT DESCRIPTION:
See Attachment Page 1
SPECIAL CONSIDERATIONS BY AGENCY:
The audit report(s) required in the Agreement shall include a Schedule of Project Assistance that will reflect the
Department's contract number, the Financial Project Number (FPN), the Federal Authorization Number (FAN), where
applicable, the amount of state funding action (receipt and disbursement of funds), any federal or local funding action, and
the funding action from any other source with respect to the project.
The Agency is required to provide a copy of the design plans for the Department's review and approval to coordinate
permitting with the Department, and notify the Department prior to commencement of any right-of-way activities.
The Agency shall commence the project's activities subsequent to the execution of this Agreement and shall perform in
accordance with the following schedule:
a) Study to be completed by
b) Design to be completed by
c) Right -of -Way requirements identified and provided to the Department by
d) Right -of -Way to be certified by
e) Construction contract to be let by
f) Construction to be completed by
If this schedule cannot be met, the Agency will notify the Department in writing with a revised schedule or the project is
subject to the withdrawal of federal funding.
SPECIAL CONSIDERATIONS BY DEPARTMENT:
Project Description:
The North Spring Garden Greenway / East Allapattah Greenway extends from the
intersection of NW 7th Street and NW 7th Street/Road to NW 11 th Place along NW North
River Drive within the Spring Garden residential neighborhood. This segment of the
Miami River Greenway is approximately .59 miles and consists of roadway
reconstruction, milling and resurfacing, drainage improvement, curb and gutter
replacement, integral colored concrete sidewalk, landscaping and lighting within the
existing rights -of -way. The project's design and construction will be consistent as much
as possible with the requirements of the goal s and objectives of the Miami River
Greenways Action Plan. The projects section will provide two 10 feet lanes for vehicular
traffic and parking on the side ofthe right-of-way opposite to the Greenway. The
Greenway side ofthe roadway is approximately 15 feet and includes a landscape verge
and sidewalk to provide continuous shaded trees and shrubs, circulation with amenities
such as seating, trash receptacles, decorative lights, wayfinding signs, embedded mile
markers and informational kiosks. The opposite side of the roadway will have a standard
width sidewalk.
PEDESTRIAN LIGHTING
CANOPY TREES
THE GREENWAY
MJN1 PART(
r.a
xsVv,u s'
CANOPY TREES
STREET LIGHTS