Loading...
HomeMy WebLinkAboutConcurrency ReportProposal No 06-28 Date: 10/04/06 AMENDMENT INFORMATION CONCURRENCY MANAGEMENT ANALYSIS CITY OF MIAMI PLANNING DEPARTMENT IMPACT OF PROPOSED AMENDMENT TO LAND USE MAP WITHIN A TRANSPORTATION CORRIDOR Applicant: Ines Marrero-Priegues, Esq, on behalf of Fernando and Flor Garcia-Tufion Address: 1000 SW 30 Avenue Boundary Streets: North: SW 9 St East: South: SW 11 St West: Proposed Change: From: Duplex Residential To: Medium Density Residential Existing Designation, Maximum Land Use Intensity Residential 0.26 acres @ 18 DU/acre Peak Hour Person -Trip Generation, Residential Other sq.ft. @ FAR Peak Hour Person -Trip Generation, Other Proposed Designation, Maximum Land Use Intensity Residential 0.26 acres @ 65 DU/acre Peak Hour Person -Trip Generation, Residential Other sq.ft. @ FAR Peak Hour Person -Trip Generation, Other Net Increment With Proposed Change: Population Dwelling Units Peak Hour Person -Trips Planning District County Wastewater Collection Zone Drainage Subcatchment Basin Solid Waste Collection Route Transportation Corridor Name SW 29 Ct SW 31 Ave 5 DU's 2 0 sq.ft. 17 DU's 8 0 sq.ft. 0 31 12 6 West Hagler 310 Q2 35 SW 8 ST RELEVANT MCNP GOALS, OBJECTIVES, AND POLICIES Land Use Policy 1.1.1 CIE Policy 1.2.3 NOTES 1. Permit for sanitary sewer connection must be issued by Metro -Dade Water and Sewer Authority Department (WASA). Excess capacity, if any, is currently not known CM_1IN 03/13/90 CONCURRENCY ANALYSIS RECREATION AND OPEN SPACE Population Increment, Residents Space Requirement, acres Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff POTABLE WATER TRANSMISSION Population Increment, Residents Transmission Requirement, gpd Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff 3 0.04 182.80 182.76 OK 31 7,035 >2% above demand >2% above demand OK SANITARY SEWER TRANSMISSION Population Increment, Residents 3 Transmission Requirement, gpd 5,810 Excess Capacity Before Change See Note 1. Excess Capacity After Change See Note 1. Concurrency Checkoff WASA Permit Required STORM SEWER CAPACITY Exfiltration System Before Change Exfiltration System After Change Concurrency Checkoff SOLID WASTE COLLECTION Population Increment, Residents Solid Waste Generation, tons/year Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff TRAFFIC CIRCULATION Population Increment, Residents Peak -Hour Person -Trip Generation LOS Before Change LOS After Change Concurrency Checkoff On -site On -site OK 3 40 800 760 OK 3 6 B B OK ASSUMPTIONS AND COMMENTS Population increment is assumed to be all new residents. Peak -period trip generation is based on ITE Trip Generation, 5th Edition at 1.4 ppv average occupancy for private passenger vehicles. Transportation Corridor capacities and LOS are from Table PT-2(R1), Transportation Corridors report. Potable water and wastewater transmission capacities are in accordance with Metro -Dade County stated capacities and are assumed correct. Service connections to water and sewer mains are assumed to be of adequate size; if not, new connections are to be installed at owners expense. Recreation/Open Space acreage requirements are assumed with proposed change made.