HomeMy WebLinkAboutConcurrency ReportProposal No 06-28
Date: 10/04/06
AMENDMENT INFORMATION
CONCURRENCY MANAGEMENT ANALYSIS
CITY OF MIAMI PLANNING DEPARTMENT
IMPACT OF PROPOSED AMENDMENT TO LAND USE MAP
WITHIN A TRANSPORTATION CORRIDOR
Applicant: Ines Marrero-Priegues, Esq, on behalf of Fernando and
Flor Garcia-Tufion
Address: 1000 SW 30 Avenue
Boundary Streets: North: SW 9 St East:
South: SW 11 St West:
Proposed Change: From: Duplex Residential
To: Medium Density Residential
Existing Designation, Maximum Land Use Intensity
Residential 0.26 acres @ 18 DU/acre
Peak Hour Person -Trip Generation, Residential
Other sq.ft. @ FAR
Peak Hour Person -Trip Generation, Other
Proposed Designation, Maximum Land Use Intensity
Residential 0.26 acres @ 65 DU/acre
Peak Hour Person -Trip Generation, Residential
Other sq.ft. @ FAR
Peak Hour Person -Trip Generation, Other
Net Increment With Proposed Change:
Population
Dwelling Units
Peak Hour Person -Trips
Planning District
County Wastewater Collection Zone
Drainage Subcatchment Basin
Solid Waste Collection Route
Transportation Corridor Name
SW 29 Ct
SW 31 Ave
5 DU's
2
0 sq.ft.
17 DU's
8
0 sq.ft.
0
31
12
6
West Hagler
310
Q2
35
SW 8 ST
RELEVANT MCNP GOALS, OBJECTIVES, AND POLICIES
Land Use Policy 1.1.1
CIE Policy 1.2.3
NOTES
1. Permit for sanitary sewer connection must be issued by
Metro -Dade Water and Sewer Authority Department (WASA).
Excess capacity, if any, is currently not known
CM_1IN 03/13/90
CONCURRENCY ANALYSIS
RECREATION AND OPEN SPACE
Population Increment, Residents
Space Requirement, acres
Excess Capacity Before Change
Excess Capacity After Change
Concurrency Checkoff
POTABLE WATER TRANSMISSION
Population Increment, Residents
Transmission Requirement, gpd
Excess Capacity Before Change
Excess Capacity After Change
Concurrency Checkoff
3
0.04
182.80
182.76
OK
31
7,035
>2% above demand
>2% above demand
OK
SANITARY SEWER TRANSMISSION
Population Increment, Residents 3
Transmission Requirement, gpd 5,810
Excess Capacity Before Change See Note 1.
Excess Capacity After Change See Note 1.
Concurrency Checkoff WASA Permit Required
STORM SEWER CAPACITY
Exfiltration System Before Change
Exfiltration System After Change
Concurrency Checkoff
SOLID WASTE COLLECTION
Population Increment, Residents
Solid Waste Generation, tons/year
Excess Capacity Before Change
Excess Capacity After Change
Concurrency Checkoff
TRAFFIC CIRCULATION
Population Increment, Residents
Peak -Hour Person -Trip Generation
LOS Before Change
LOS After Change
Concurrency Checkoff
On -site
On -site
OK
3
40
800
760
OK
3
6
B
B
OK
ASSUMPTIONS AND COMMENTS
Population increment is assumed to be all new residents. Peak -period trip
generation is based on ITE Trip Generation, 5th Edition at 1.4 ppv average
occupancy for private passenger vehicles. Transportation Corridor capacities and
LOS are from Table PT-2(R1), Transportation Corridors report.
Potable water and wastewater transmission capacities are in accordance with
Metro -Dade County stated capacities and are assumed correct. Service
connections to water and sewer mains are assumed to be of adequate size; if not,
new connections are to be installed at owners expense.
Recreation/Open Space acreage requirements are assumed with proposed
change made.