HomeMy WebLinkAboutII Project Description•
2222 BISCAYNE
MAJOR USE SPECIAL PERMIT
PROJECT DESCRIPTION
ARTICLE II.
Project Description
A. Zoning Ordinance No. 11000
1. Section 1304.2.1 Application forms; supplementary
materials
2. Section 1702.2.1 General Report
3. Section 1702.2.2 Major Use Special Peiiiiit Concept Plan
4. Section 1702.2.3 Development Impact Study
•
•
•
•
•
MAJOR USE SPECIAL PERMIT
Section 1304A i Application forms; supplementary materials
(a) Statements of ownership and control of the proposed development
of activity.
The Disclosure of Ownership and Ownership Affidavit are provided in
Article I.
(b) Statement describing in detail the character and intended use of
the development or activity.
2222 BISCAYNE is a mixed -use development that consists of one new
29-story office building with commercial uses at grade, existing 2-story
and 7-story office buildings connected with a roofed plaza, and an
existing 2-story parking garage. The new office building contains
431,983 square feet of new construction and 1,610 new parking spaces.
The total site will contain 494,300** square feet in the three buildings
and 1,784 parking spaces.
The development consists of one city block bound on the east by
Biscayne Boulevard, on the south by NE 22nd Street, on the west by NE
2nd Avenue and on the north by NE 23rd Street, The parcel consists of a
Net Lot Area of 161,885 square feet (3.716 acres) and a gross lost area
of 223,653 square feet (5.134 acres). The two existing office buildings
front Biscayne Boulevard. The new office building sits on the west half
of the property.
The zoning designation for the property is SD-20 / Edgewater Overlay
District with C-1 as the underlying designation. The maximum FAR for
commercial uses is 2.0 and the maximum allowable FAR without
bonuses is 447,306 square feet, The maximum allowable FAR area with
bonuses, to include PUD bonus, affordable housing bonus and retail
bonus is 547,950 square feet.
The proposed development is 494,300 square feet using the PUD
(Planned Unit Development) Bonus only.
The project includes the following amenities at street level: retail and
restaurant with indoor/outdoor dining at grade, a 1,610-car parking
garage wrapped with office space at levels 2 thru 5 and an art wrapper
designed by local D.A.S.H. (Design & Architecture Senior High School)
student at levels 6 thru 13.
Building heights are as follows: (All heights are given above finished
floor level = 12.5833' NGVD)
Base (Ground Level) = 23'-4"
Office Wrapper (Levels 2 ® 5) = 65'-4"
•
•
•
(c)
Art Wrapper (Levels 6 — 13) = 149' 4„
Additional Parking (Levels 14 — 15) = 177'-4"
Offices (Levels 16 — 29) = 392' 0"
Top of Building = 421'-6"
Drawings showing the architectural character and location of the
intended uses are included under Tab 6 of the Supporting
Documents.
** Square footage currently exceeds the maximum allowable by 2,263 square
feet however, it is anticipated the during engineering a significant amount of
useable/countable square footage will be reduced when mechanical spaces are
fully design and apportioned. It is anticipated that each floor will have a bare
minimum of an additional 100 square feet of non -countable FAR.
General location map, showing relation of the site or activity for
which special permit is sought to major streets, schools, existing
utilities, shopping areas, important physical features in and
adjoining the project or activity and the like.
The following exhibits are included with the Major Use Special Permit
Application:
(1) Aerial: Aerial photograph of the surrounding area indicating the
project site.
(2) Area Context Map/Site Aerial: Map of the project area
indicating buildings and their functions that surround the site.
Location Map: Map of the surrounding street system indicating
the project location.
(3)
(d) A site plan containing the title of the project and the names of the
project planner and developer, date, and north arrow and, based on
an exact survey of the property drawn to a scale of sufficient size
to show:
The general information requested is shown on the Ground/Site Plan,
Sheets A-100 and A-101, provided under Tab 6 of the Supporting
Documents. The site plan includes the following:
(1) Boundaries of the project, any existing streets, buildings,
watercourses, easements and section lines;
The boundaries of the project and the location of existing
streets and easements are shown on the Survey located
under Tab 5 of the Supporting Documents.
•
•
•
(2) Exact location of all buildings and structures;
The exact location of all existing buildings located on the
property is shown on the Boundary Survey under Tab 5. The
location of the building to be constructed is shown on the Site
Plan, Sheet A-100, located under Tab 6 of the Supporting
Documents.
(3) Access and traffic flow and how vehicular traffic will be
separated from pedestrian and other types of traffic;
Main vehicular access for the new office building is from NE
22nd Street. Service access to the loading area is from NE 23'
Street. Valet access and short-term ground floor parking is
available via entrances on both NE 22nd Street and NE 2nd
Avenue.
It is also expected that a Streetcar stop will be available at NE
2nd Avenue.
Pedestrian traffic has full access to the entire perimeter of the
property via a level sidewalk with patterned pavers at the new
building and a concrete sidewalk on the eastern portion of the
property.
A detailed analysis of the site access and traffic flow is
provided in the Traffic Impact Analysis located under Tab 2 and
Sheet A-100-1 located under Tab 6 of the Supporting
Documents and
(4) Offstreet parking and offstreet loading areas;
The offstreet parking facility will include a 15-level parking
structure with all levels above grade. The ground floor offers
parking for 29 cars and a valet waiting area. The upper level
parking garage contains the remaining 1,760 cars. All parking
is shown on Sheets A-100 through A-103.1, provided under
Tab 6 of the Supporting Documents.
The Zoning Ordinance requires four (4) loading bays at
121x35'x15'. There will be four (4) loading bays 12 ft. x 55 ft. all
with a clearance of over 15-0". Service areas are shown on the
A-100, under Tab 6 of the Supporting Documents.
(5) Recreational facilities locations;
One restaurant is planned at the northwest corner of the new
building and the property and front NE 2nd Avenue and will
have an outdoor covered dining terrace. A banking facility is
planned inside the building at the ground floor as well as a
small sundries shop and lobby cafe, open to the public and
•
•
building occupants. The combined area at the ground floor for
retail 1 restaurant components is 15,580 SF.
Level 16 include indoor and outdoor amenities, an outdoor
seating area and trellised seating/dining. The
unused/unavailable portion of this roof will be a "green" roof
and contain drainage and collection for irrigation.
These facilities are shown on the A-104 located under Tab 6 of
the Supporting Documents.
(6) Screens and buffers;
(7)
Landscaped areas are indicated on the Landscape Plans,
Sheet L-1 through L-5 and are generically indicated on A-100,
A-101, A-103, and A-104, located under Tab 6 of the
Supporting Documents.
Refuse collections areas;
Waste collection will be provided by a containerized compactor
system located within the service area. These facilities are
shown on the A-101 Plan, located under Tab 6 of the
Supporting Documents.
(8) Access to utilities and points of utilities hookups.
Access and connections to site utilities are discussed in the
Site Utility Study located under Tab 3 of the Supporting
Documents.
(e) Tabulations of total gross acreage in the project and the
percentages thereof proposed to be devoted to:
(1) The various permitted uses:
Office Square Footage (New Tower) =371,863 sf
Retail/Business (Ground Floor Retail, Restaurant, Bank) =13,315
(2) Ground coverage by structures:
Building Footprint = 117,225 SF
Ground coverage by the structures is 52.4% of the total gross lot area.
(60% maximum allowable)
(f) Tabulation showing the following:
(1) The derivation of numbers of offstreet parking and
offstreet loading spaces shown in (d) above;
•
•
•
(9)
The total number of offstreet parking spaces required for the new
building is 1,541 spaces and for the existing buildings is 208 spaces
(1,749 total required spaces). The total number of existing spaces is 174
spaces and 1,610 new spaces are to be built. The entire parcel will
contain 1,784 spaces for the site. Derivation of the number of offstreet
parking is shown within the Project Summary and Sheet A-100, located
under Tab 6.
If common facilities (such as recreation areas of structures, private
streets, common open space, etc.) are to be provided for the
development, statements as to how such common facilities are to be
provided and permanently maintained.
All common facilities provided will be maintained by the Owner.
(h) Storm drainage and sanitary sewerage plans.
Storm drainage, water distribution, waste water and solid waste
generation provisions are discussed in the Site Utility Study located
under Tab 3 of the Supporting Documents.
(1) Architectural definitions for buildings in the development; exact number
of dwelling units, sizes, and types, together with typical floor plans of
each type.
Detailed information and breakdown of square footage of all uses are
found under Article 1. Typical floor plans for residential units are shown
on Sheet A-6.0. All drawings are located under Tab 6 of the Supporting
Documents.
•
•
•
Plans for signs, if any.
The project will obtain signage approval at a later date.
(k) Landscaping plan, including types, sizes and locations of
vegetation and decorative shrubbery, and showing provisions for
irrigation and future maintenance
The landscape plans showing vegetation are found on sheets L-1,
through L-5. AM landscape plans are located under Tab 6 of the
Supporting Documents.
(1) Plans for recreation facilities, if any, including location and general
description of buildings for such use.
Recreation facilities are located within the 12th floor amenities level of
each tower.
(m)
Such additional data, maps, plans, or statements as may be
required for the particular use or activity involved.
The details of the spaces and calculations used to compute the Floor
Area Ratio (FAR) are shown on the Site Data & Development Program,
provided under Tab 6 of the Supporting Documents.
(n) Such additional data as the applicant may believe is pertinent to
the proper consideration of the site and development plan.
Elevations depicting the architectural character of the building are
shown on the Buildings Elevation sheets. All elevations are located
under Tab 6 of the Supporting Documents.
2. Section 1702.2.1 General Report.
(1) Property ownership and beneficial interest within the boundaries of
the area proposed for Major Use Special Permit.
Statement of Ownership and beneficial interest within the boundaries of
the area proposed for Major Use Special Permit are provided in Article I.
The nature of the unified interest or control.
The nature of unified interest or control is indicated in Article 1.
Survey of the proposed area showing property lines and
ownership.
A copy of the Surveys are included under Tab 5 of the Supporting
Documents.
•
•
•
(4) Map of existing features, including streets, alleys, easements,
utilities lines, existing land use, general topography, and physical
features.
The existing site features and utility lines are shown on the Boundary
Survey of the property located under Tab 5. The site features and the
utilities are also described in the Site Utility Study, located under Tab 3
of the Supporting Documents.
(5) Materials to demonstrate the relationship of the elements listed in
(4) preceding to surrounding area characteristics.
The drawings submitted with this Application are located under Tab 6 of
the Supporting Documents.
(6) Existing zoning and adopted comprehensive plan designations for
the area on and around the lands proposed for Major Use Special
Permit.
The existing zoning designation for the property pursuant to City of
Miami Ordinance No. 11000 as amended. The zoning designation for
the property is C-1 with an SD-20 Overlay. The Comprehensive Plan
Future Land Use designation for the property is Restricted Commercial.
The zoning and the comprehensive plan designations are consistent.
3. Section 1702.2.2 Major Use Special Permit Concept Plan.
a. Relationships of the concept plan to surrounding existing and
proposed future uses, activities, systems, and facilities
(transportation, recreation, view corridors, pedestrian systems,
service systems and similar uses.
Article II contains a written narrative of this project outlining proposed
uses, activities and architectural character. This narrative also contains
descriptions of the project's relationship to traffic, pedestrian
movements, and transportation access. Building elevations, sections
and perspectives showing the proposed materials, vertical profile and
height, and orientation to streets are included in the drawings submitted
with this Application. The list of drawings submitted is found under Tab
6 of the Supporting Documents.
b. Existing zoning and adopted comprehensive plan principles and
designations.
The project conforms with the C-1 with SD-20 Overlay zoning district
designation for the property. The comprehensive plan future land use
designation conforms with the land use designation currently in effect for
the property.
•
•
•
4, Section 1702.2.3 Developmental impact Study.
(a) A traffic analysis shall be submitted for an area within
approximately 1/4 mile of the site, or an area including the major
intersections to be impacted by the site, whichever is larger.
The Traffic Impact Analysis is included under Tab 2 of the Supporting
Documents.
(b) Economic impact data shall be provided, including estimates for
construction costs, construction employment, and permanent
employment and shall demonstrate that the proposed development
is favorable to the economy, public services, environment and
housing supply of the City.
The Economic impact Study is included under Tab 4 of the Supporting
Documents,
(c) A housing impact assessment.
Over the last several years prices of urban housing have increased
dramatically; despite the recent slow down in the economy.
Subsequently, a substantial amount of people within metropolitan areas
has begun to return to the city to live. This has created a shortage of
multi -family housing along with an upward surge of housing prices. This
pattern remains the same in South Florida where there continues to be
an increased demand for housing, particularly in Miami -Dade County.
(d) A description of proposed energy conservation measures shall be
provided, including only those measures that are proposed in
addition to the minimum requirements in State Energy Code.
Architecturally, the building envelope will be comprised of insulated
walls and roof. Tinted glass will be used throughout the building.
Electrically, ail exterior and landscape lighting will be controlled by
means of time clocks and photocell switches. Energy saving lamps,
ballasts and fixtures are being considered at cores and public spaces.
(e). Historic Buildings
There are no historic structures located on the property.
(f). Environmental Zone
The property is not located within an environmental preservation district.