Loading...
HomeMy WebLinkAboutConcurrency ReportProposal No 06-25 Date: 6/22/06 CONCURRENCY MANAGEMENT ANALYSIS CITY OF MIAMI PLANNING DEPARTMENT IMPACT OF PROPOSED AMENDMENT TO LAND USE MAP WITHIN A TRANSPORTATION CORRIDOR AMENDMENT INFORMATION Applicant Suzanne Besu and Bob de la Fuente on behalf of Santo Antonio Holdings Inc Address: 2862-64, 2900, 2908, 2922 and 2930 NW 22nd Avenue Boundary Streets: North: NW 30th Street East: NW 22nd Avenue South: n/a West: n/a Proposed Change: From: Medium Density Multifamily Residential To: Restricted Commercial Existing Designation, Maximum Land Use Intensity Residential 0.85 acres @ 65 DU/acre Peak Hour Person -Trip Generation, Residential Other sq.ft. @ FAR Peak Hour Person -Trip Generation, Other Proposed Designation, Maximum Land Use Intensity Residential 0.85 acres @ 150 DU/acre Peak Hour Person -Trip Generation, Residential Other sq.ft. @ FAR Peak Hour Person -Trip Generation, Other Net Increment With Proposed Change: Population Dwelling Units Peak Hour Person -Trips Planning District County Wastewater Collection Zone Drainage Subcatchment Basin Solid Waste Collection Route Transportation Corridor Name 55 DU's 45 0 sq.ft. 128 DU's 64 0 sq.ft, 0 186 72 19 Allapattah 322 11 14 W 22 Ave RELEVANT MCNP GOALS, OBJECTIVES, AND POLICIES Land Use Policy 1.1.1 CIE Policy 1.2.3 NOTES 1. Permit for sanitary sewer connection must be issued by Metro -Dade Water and Sewer Authority Department (WASA). Excess capacity, if any, is currently not known CM_1_IN 03/13/90— CONCURRENCY ANALYSIS RECREATION AND OPEN SPACE Population Increment, Residents Space Requirement, acres Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff 186 0.24 182.80 182.56 OK POTABLE WATER TRANSMISSION Population Increment, Residents 186 Transmission Requirement, gpd 41,593 Excess Capacity Before Change >2% above demand Excess Capacity After Change >2% above demand Concurrency Checkoff OK SANITARY SEWER TRANSMISSION Population Increment, Residents Transmission Requirement, gpd Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff 186 34,351 See Note 1. See Note 1. WASA Permit Required STORM SEWER CAPACITY Exfiltration System Before Change Exfiltration System After Change Concurrency Checkoff On -site On -site OK SOLID WASTE COLLECTION Population Increment, Residents Solid Waste Generation, tons/year Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff 186 238 800 562 OK TRAFFIC CIRCULATION Population Increment, Residents Peak -Hour Person -Trip Generation LOS Before Change LOS After Change Concurrency Checkoff 186 19 B B OK ASSUMPTIONS AND COMMENTS Population increment is assumed to be all new residents. Peak -period trip generation is based on ITE Trip Generation, 5th Edition at 1.4 ppv average occupancy for private passenger vehicles, Transportation Corridor capacities and LOS are from Table PT-2(R1), Transportation Corridors report, Potable water and wastewater transmission capacities are in accordance with Metro -Dade County stated capacities and are assumed correct.. Service connections to water and sewer mains are assumed to be of adequate size; if not, new connections are to be installed at owner's expense. Recreation/Open Space acreage requirements are assumed with proposed change made,