Site Utility Study
Introduction
The Avenue One project is a proposed 16 story mixed use ---commercial i
residential multi -family high rise building to be built on a total of 4.22 acres of
land located at 1950 NW 1 s Avenue. It is located in the City of Miami, Miami -
Dade County, Florida (see site location map -Fig 1). The development includes a
residential tower constructed on a parking garage/ commercial structure. It will
consist of a total 349 residential apartments units, 8,345 square feet of
commercial area and 634 parking spaces. Table 1, below depicts the details of
the proposed project.
Table 1:
Project Summary
Occupancy
Unit
Floor Area
Commercial
8,345
Residential
349 Units
308,313
Total
316,658
Parking
633
Avenue One
Site Utility Study
2
•
•
Location Map
SITE:
1950 NW 1 AVENUE
1950 NW 1 COURT
PR
Figure 1
1. Drainage
Existing Drainage
Presently, the site is undeveloped. There is no existing drainage systems an site.
Proposed Drainage System
The drainage systems for the proposed development will consist of drainage
wells and exfiltration trenches, if possible, to facilitate on -site disposal of storm
water runoff. The 5- year design storm event will be used to design the storm
water management system, in accordance with Section D-4, "Water Control", of
Part 2 of the Miami -Dade County Public Works Manual,
Avenue One 3
Site Utility Study
•
•
Based on the preliminary drainage calculations, it is anticipated that four (4) 24"
drainage wells will provide sufficient capacity to dispose of the design 5-year 24-
hour storm water runoff generated by the proposed development.
The final drainage design for the project should be in conformance with the
requirements of the Miami -Dade County DERM Water Control Section, Florida
Department of Environmental Protection, and the local, State , and federal
regulatory agencies having jurisdiction over the project.
II. Water Distribution System
The water mains owned and operated by the Miami -Dade Water and Sewer
Department (MDWASD) in the vicinity of the project are shown in the Table 2.
Table 2:
Existing Water Mains
Location
Between
Water Main(s)
NW1Ave
NW19StandNW20St
12"
NW 20 St
NW 1 Ave and NW 1 Ct
6"
NW 1 Ct
NW 19 St and NW 20 St
6"
In accordance with MDWASD criteria, the owner will most likely be required to
construct a new 12-inch ductile iron (DI) water main along the frontage of the
property on NW 20 Street. The proposed 12" water main will likely be connected
to the existing 12" water main along NW 1 Avenue. A final determination of the
points of connection and requirements will not be provided by MDWASD until a
Water and Sewer Service Agreement is requested by the owner. Water service
meters will be installed by MDWASD forces at owner's expense.
See Attachment for a copy of the MDWASD water atlas sheet for the project area.
III. Sanitary Sewer Collection System
Avenue One
Site Utility Study
4
•
•
•
Table 3 depicts the sanitary sewer mains owned and operated by Miami -Dade
Water and Sewer Department (MDWASD) within the vicinity of the project.
Table 3:
Existing Sanitary Sewer Mains
Location
Between
Sanitary Sewer Main(s)
NW 1 Ct
NW 19 St and NW 20 St.
8" Gravity Main
NW 1 Ave
NW 19 St and NW 20 St.
8" Gravity Main
NW 20 St
NW 1 Ct and NW 1 Ave
8" Gravity Main
A copy of the MDWASD Sewer Atlas sheet has been attached.
The proposed on -site sanitary sewer system for the property can properly be
connected to the existing public gravity mains. A final determination of the points
of connection and requirements will not be provided by MDWASD until a Water
and Sewer Service Agreement is requested by the owner. A letter of availability
from DERM and further coordination with MDWASD is needed, to verify the
proposed sanitary sewer service connection points and requirements for this
project. MDWASD may require upgrades to the sanitary sewer system, but this
can not be determined without a request for a water and sewer service agreement.
The flows from the existing MDWASD sanitary sewage mains on NW 1 Avenue are
received by MDWASD Regional Pump Station #2. As of August 2005, this pump
station is operating under capacity as established by the USEPA, and is not under
any type of moratorium. See Attachment for Pump Station Monthly Information. At
this time, it is not anticipated that any improvements to the regional pumping
and/or transmission systems will be required to connect the proposed Project.
However, a final determination regarding the status of the existing transmission
system and the need for possible improvements will not be made until the
construction plans are submitted to the Miami -Dade County DERM Wastewater
Section and a Sanitary Sewage System Capacity Certification Letter is issued.
Avenue One 5
Site Utility Study
•
•
•
The flows created by this project have been determined and are shown in Table 4.
Table 4:
Water and Sewer Flow Generation
Type of
Occupancy
Quantity
Usage rate
Total Average
Daily Flow
(gpd)
Apartment
349 units
200 gpd per unit
69,800
Commercial
8,345sf
10 gpd per 100 sf
834
Total Anticipated Flow
70,634 gpd
IV. Solid Waste Generation
Solid waste generated by this project will be collected in standard on -site
containers for refuse and recyclables. Regular pick-up service will be provided
either by private hauling companies and/or by the City of Miami Solid Waste
Department, who will transport the waste to Miami -Dade County's or private
disposal and recycling facilities. The volumes of solid waste projected to be
generated are shown in Table 5,
Table 5:
Solid Waste Generation
Type of
Occupancy
Phase l
Quantity
Usage rate
Total Solid Waste
Generated
(Tons/Day)
Apartment
349 units
5lbsfunitlday
0.873
Commercial
8,345sf
6lbs11000sf/day
0.025
Total Anticipated Solid Waste Generated
0.898
Avenue One
Site Utility Study
•
•
ATTACHMENTS
Preliminary drainage calculations
Avenue One 7
Site Utility Study
•
•
Q = CIA
Q = ((98%) (0.95) + (2%) (0.25)) (6.2) (4.22)
Q = 24.49 cfs
Q = 10991 gpm
Lowest grate elevation = 14.0
October water table = 2.5
Salt water differential = 1.5
Head = 14.0 — (2.5+1.5) = 10.0
Assuming that the well can percolate 700 gpm per foot of head
Water dissipates per well = 10.0 X 700 = 7000 gpm
Use safety factor of 2.0, water dissipates per well = 7000/ 2 = 3500 gpm
# of drainage well needed = 10991 / 3500 = 3.14
Use 4 wells.
Avenue One g
Site Utility Study
•
•
•
P.
YFae �xi?e�,
:T!a
42
ffidii444 .49401- i:fy., 7<tq.t
9
Avenue One
Site Utility Study
•
•
•
Avenue One
Site Utility Study
;PG. AM.
t,r3.R. :.
MEAN SEA
PRFPA ED FROM Hsu_
intET
RD W, L.+
A'-ERAGCTQBER
"ROUND ER LEVEL 2,2
;ems _°-"Tr
IQ
•
•
•
ATTACHMENTS
Existing utility record
Avenue One
Site Utility Study
•
•
•
Avenue One
Site Utility Study
12
•
•
•
Avenue One
Site Utility Study
13
•
•
•
ATTACHMENTS
Pump station information
Avenue One 14
Site Utility Study
•
•
•
fa. ;9. 2 S : 2 ',M,1 nmip 5tAtjon 1,14.4thly Mr:or:mat:ion -- ,.Am ftvielo
,S-Lat.L.q.7,7.-30 -0002 ..kz1.14 n.A13 MOTantitt4„OK
MUNI LOX wan 4 Unit xyammeof72---
Adat7„925 MOAT= Wm _31_53,42_ MorazoriLM oiteztiv 4ince / /
C.T.ar,U Y.7 tAk,Y T7 -7.717,iipi: 5 ,
Typa,A at,n Cla42,X SptIt'a41 lirgpwr,i, iYaafly MANI frn,,,),„ _,„„ 2.W
• - ---- — ,C.J:tr, gros4 C,,i'Vo.c.:L4(gpA),, 57,500,0041
Ros l'TIWillldl ?- SaFtt
2,311,223 4,46 ral 45,60: H5t.11 IlEt Ca,' Ceraft -,., 01
Tlmts,. 0 2.95 hrE 3$30C&pacitY(ZW,„. 34,E40,767a1
Igx.tclno, 0 2,95 hr4 29.51 Irmliat;e67. 71mes•flpd) 4,2000001
..D.it lb,NAnT iolt Dalai Elow4 acya -0
r..1; Pqp -C-orMaT.ts
.07/2913 4 0.00 12,59 0,00 y
GJ2S 3.6# 14711 - 04-6 ‘ 4
09/2/1296-6 I.90 11.5A 770 1
W28/420 1.49 ---C49 0.-6U V 7
Wilirlirig 2.92 --11747 Ora Y -g
3710-104 2.77 ---.1r."0/ ---17375 i -3
17171o4 2,60 14:.7S1 9.0 Y _1
$14.46t.thrQ-Ltikto
D4ta,.0a/t7/20US7.77WaTa
GOLD/U Zmaz'4.or T-qn...›provnt OOLD/S 4.StAtiov. Inform. SOLDiV .Wpatrear,
GOLD/D ‹DP,arnreaM =zip 0,11mp
GPLO/T Tewer Csr4tfiCatinT
Avenue One
Site Utility Study
15
•
•
•
'200MK
m Ste.t. Et4tior,
.NLe:4 N,,Aber
.°Almab-or c4,!. ,gallang;
OK AS.F,X4 30 00-02
30
AQ30
IW 30 RS94M&R
.513, 1.k'.,475A=7,7
Avenue One
Site Utility Study
(-od) 7547E
Cat-5
Et4
ET Mcu;
3,0.5
3.01
2.Q2
0.01
0
16