Loading...
HomeMy WebLinkAboutRevised School Board Impact Analysis**REVISED** SCHOOL IMPACT REVIEW ANALYSIS November 13, 2006 FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE THE APPLICANT IS NOT REQUESTING ADDITIONAL RESIDENTIAL DENSITY OVER WHAT IS CURRENTLY ALLOWED IN THE PORPERTY'S ZONING CLASSIFICATION. APPLICATION: Lima - MU 06-0132 REQUEST: ZONING: ACRES: LOCATION: MSA/ MULTIPLIER: NUMBER OF UNITS: Major Use Special Permit (PAB Meeting November 15, 2006) C-1 "Restricted Commercial" (150 DU/acre), SD-20 "Edgewater Overlay" and SD-20.1 "Biscayne Blvd. Edgewater Overlay" +1.38 net acres 2919 and 2937 Biscayne Boulevard and 330 NE 30 Street, Miami 4.7 / .27 multifamily 206 units (Existing zoning allows 207 residential units) ESTIMATED STUDENT POPULATION: 56 ELEMENTARY: MIDDLE: SENIOR HIGH: 27 12 17 SCHOOLS SERVING AREA OF APPLICATION ELEMENTARY: Eneida M. Hartner Elementary — 401 NW 29 Street MIDDLE: Jose De Diego Middle — 3100 NW 5 Avenue SENIOR HIGH: Booker T. Washington Senior High — 1200 NW 6 Avenue All schools are located in Regional Center IV. *Based on Census 2000 information provided by Miami -Dade County Department of Planning and Zoning. The following population and facility capacity data are as reported by the Office of Information Technology, as of October 2006: Eneida M. Hartner Elem. Jose De Diego Middle Booker T. Washington Sr. UTILIZATION % UTILIZATION NUMBER OF FISH DESIGN FISH DESIGN FISH DESIGN PORTABLE CAPACITY STUDENT CAPACITY CAPACITY STUDENT PERMANENT AND CUMULATIVE POPULATION PERMANENT PERMANENT STATIONS RELCOATABLE STUDENTS"' 743 106% 106% 770* 110% 110% 905 8 7 % 87/0 917 * 88% 88% 1,550 68% 68% 2,270 0 4,347 1,567 * 69% 69% 1,043 0 1,224 2,478 *Student population increase as a result of the proposed development **Estimated number of students (cumulative) based on zoning/land use log (2001- present) and assuming all approved developments are built; also assumes none of the prior cumulative students are figured in current population. Notes: 1) Figures above reflect the impact of the class size amendment. 2) Pursuant to the Interlocal Agreement, only Eneida M. Hartner Elementary meets the review threshold. PLANNED RELIEF SCHOOLS IN THE AREA (Information included in proposed 5-Year Capital Plan, 2006-2010, dated November 2006) Projects in Planning, Design or Construction School Status N/A Proposed Relief Schools School NIA Projected Occupancy Date Funding year OPERATING COSTS: Accounting to Financial Affairs, the average cost for K-12 grade students amounts to $6,549 per student. The total annual operating cost for additional students residing in this development. if approved, would total $366,744. CAPITAL COSTS: Based on the State's November 2006 student station cost factors*, capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY 27 x $18,202 = $491,454 MIDDLE Does not meet review threshold SENIOR HIGH Does not meet review threshold Total Potential Capital Cost $491,454 *Based on Information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per student station does not include land cost. 0 703 The following population and facility capacity data are as reported by the Office of Information Technology, as of October 2006: Eneida M. Hartner Elem. Jose De Diego Middle Booker T. Washington Sr. % UTILIZATION % UTILIZATION NUMBER OF FISH DESIGN FISH DESIGN FISH DESIGN PORTABLE CAPACITY STUDENT CAPACITY CAPACITY STUDENT PERMANENT AND CUMULATIVE POPULATION PERMANENT PERMANENT STATIONS RELCOATAF3LE STUDENTS" 743 770 905 917 1,550 1,567 703 1.043 2,270 106% 110% 87% 88% 68% 69% 0 0 0 106% 110% 87% 88% 68% 69% 1,224 2,478 4,347 Student population increase as a result of the proposed development **Estimated number of students (cumulative) based on zoning/land use log (2001- present) and assuming all approved developments are built; also assumes none of the prior cumulative students are figured in current population. Notes: 1) Figures above reflect the impact of the class size amendment. 2) Pursuant to the Interlocal Agreement, only Eneida M. Hartner Elementary meets the review threshold. PLANNED RELIEF SCHOOLS IN THE AREA (Information included in proposed 5-Year Capital Plan, 2006-2010, dated November 2006) Projects in Planning, Design or Construction School Status NIA Proposed Relief Schools School NIA Projected Occupancy Date Funding year OPERATING COSTS: Accounting to Financial Affairs, the average cost for K-12 grade students amounts to $6,549 per student. The total annual operating cost for additional students residing in this development, if approved, would total $366,744. CAPITAL COSTS: Based on the State's November 2006 student station cost factors*, capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY 27 x $18,2•02 = $491,454 MIDDLE Does not meet review threshold SENIOR HIGH Does not meet review threshold Total Potential Capital Cost $491,454 *Based on Information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per student station does not include land cost.