HomeMy WebLinkAboutExhibit 18ATTACHMENT A PROJECT WORK PLAN Please complete this form with as much detail as possible 1. GRANTEE/PROJECT INFORMATION: Grantee: City of Miami Project Title: Belle Meade Storm Sewer Project, Phase II, B-50672 DEP Grant «: LP 6703 I1. FUNDING PLAN: Category of Expenditure 2006-2007 LP Grant , Funds Provided 2006.2007 Match Required Tota12006-2007 Funding Professional Services $150,000 $150,000 $300,000 Construction & Demolition $350,000 $3,047,000 $3,397,000 Lend Equipment Other (Specify) Total _ $500,000 $3,197,000 $3,697,000 Note: 1) Design and Construction administration costs have been included in the funding amounts listed in the table above. 2) Although the table above indicates a funding plan for Fiscal Year 2006-2007, the above funds will not be expended entirely in Fiscal Year 2006-2007. The funds will be expended throughout the life of the project. Please refer below to "IV. Project Milestones" for the estimated project timeline. 111. SCOPE OF WORK: (e.g., specifications, task timeline within current authorized Agreement period, method or manner of performance, requirements, quarterly cash needs, etc.) The City of Miami project entitled `Belie Meade Storm Sewer Project, Phase II, B-50672" consists of the design, permitting and construction of storm sewer improvements to the area bounded by NE 6 Court, NE 75 Street, NE 8 Avenue, and the Little River. The improvements will include exfiltration trench (french drains), catch basins, manholes, water quality units (pollution control structures), cross drains, solid storm sewer pipes for gravity conveyance, new outfall, a pump station, some road reconstruction and surface restoration. The work may also include roadway milling & resurfacing, damaged curb & gutter replacement, damaged sidewalk replacement, ADA compliant ramp construction, and re -sod of'swales where required, Note: Storm water from this project discharges to the Little River Canal which directly connects to the Biscayne Bay. Biscayne bay is a SFWMD priority water body. IV. PROJECT MILESTONES: (i.e. timelines, contracts, if funded in prior year(s) where is the project now) An estimated project timeline with milestones are as follows: Item Completion Date Task 1: Commence design (NTP for design) and permit application process August 2006 Task 2: Complete design and permit application process June 2008 Task 3: Issue advertisement for bids; receive and award bids December 2008 Task 4: Construction Start March 2009 Task 5: Construction Completion & Project close-out May 2010 1f the scope of work includes construction: Estimated Construction slen date: Estimated scope of work completion date: March 2009 May 2010 If the scope is only for preconstruction work: Estimated scope of work completion date: V. LOCAL MATCH & OTHER GRANT FUNDS: List the sources and amounts for all funds being used to fund this project. SOURCE AMOUNT($) $500,000 2006.2007 LP grant 2006-2007 Match C1P No. 352264 Stormwater Utility Trusi Fund (prior year appropriation) 51,969,500 CEP No. 352216 Stormwater Utility Trust Fund $ I,227,500 Total Project Cost (Total Funding) _ $3,697,000