Loading...
HomeMy WebLinkAboutConcurrency ReportProposal No 06-22 Date: 6/21/06 CONCURRENCY MANAGEMENT ANALYSIS CITY OF MIAMI PLANNING DEPARTMENT IMPACT OF PROPOSED AMENDMENT TO LAND USE MAP WITHIN A TRANSPORTATION CORRIDOR AMENDMENT INFORMATION Applicant: A. Vicky Garcia -Toledo, Esq, on behalf of On The Park Propertie and On The Park Properties II, LLC Address: 1770 North Bayshore Drive Boundary Streets: North: NE 18th St East: N Bayshore Dr South: n/a West: NE 4th Avenue Proposed Change: From: High Density Multifamily Residential To: Restricted Commercial Existing Designation, Maximum Land Use Intensity Residential 1.30 acres @ 500 DU/acre Peak Hour Person -Trip Generation, Residential Other sq.ft. @ FAR Peak Hour Person -Trip Generation, Other Proposed Designation, Maximum Land Use Intensity Residential 1.30 acres @ 500 DU/acre Peak Hour Person -Trip Generation, Residential Other sq.ft. @ FAR Peak Hour Person -Trip Generation, Other Net Increment With Proposed Change: Population Dwelling Units Peak Hour Person -Trips Planning District County Wastewater Collection Zone Drainage Subcatchment Basin Solid Waste Collection Route Transportation Corridor Name 648 DU's 325 0 sq.ft. 648 DU's 325 0 sq.ft. 0 0 0 0 Wynwood/Edgewater 308 H2 11 Biscayne RELEVANT MCNP GOALS, OBJECTIVES, AND POLICIES Land Use Policy 1,1.1 CIE Policy 1.2.3 NOTES 1. Permit for sanitary sewer connection must be issued by Metro -Dade Water and Sewer Authority Department (WASA). Excess capacity, if any, is currently not known CM_l_ 03/13/90 CONCURRENCY ANALYSIS RECREATION AND OPEN SPACE Population Increment, Residents Space Requirement, acres Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff POTABLE WATER TRANSMISSION Population Increment, Residents Transmission Requirement, gpd Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff 0 0.00 182.80 182.80 OK 0 >2% above demand >2% above demand OK SANITARY SEWER TRANSMISSION Population Increment, Residents Transmission Requirement, gpd 0 Excess Capacity Before Change See Note 1. Excess Capacity After Change See Note 1. Concurrency Checkoff WASA Permit Required STORM SEWER CAPACITY Exfiltration System Before Change Exfiltration System After Change Concurrency Checkoff SOLID WASTE COLLECTION Population Increment, Residents Solid Waste Generation, tons/year Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff TRAFFIC CIRCULATION Population Increment, Residents Peak -Hour Person -Trip Generation LOS Before Change LOS After Change Concurrency Checkoff On -site On -site OK 0 800 800 OK 0 B OK ASSUMPTIONS AND COMMENTS Population increment is assumed to be all new residents. Peak -period trip generation is based on ITE Trip Generation, 5th Edition at 1.4 ppv average occupancy for private passenger vehicles, Transportation Corridor capacities and LOS are from Table PT-2(R1), Transportation Corridors report. Potable water and wastewater transmission capacities are in accordance with Metro -Dade County stated capacities and are assumed correct. Service connections to water and sewer mains are assumed to be of adequate size; if not, new connections are to be installed at owner's expense. Recreation/Open Space acreage requirements are assumed with proposed change made.