Loading...
HomeMy WebLinkAboutConcurrency ReportCONCURRENCY MANAGEMENT ANALYSIS CITY OF MIAMI PLANNING DEPARTMENT Proposal No 06-23 IMPACT OF PROPOSED AMENDMENT TO LAND USE MAP Date: 6/21/06 WITHIN A TRANSPORTATION CORRIDOR AMENDMENT INFORMATION CONCURRENCY ANALYSIS Applicant. Regino H Villalonga, President, RHV of Miami, Inc Address: 2648 NW 22nd Avenue Boundary Streets: North: n/a East: NW 22nd Avenue South: n/a West: n/a Proposed Change: From: Medium Density Multifamily Residential To: Restricted Commercial Existing Designation, Maximum Land Use Intensity Residential 0.52 acres @ 65 DU/acre Peak Hour Person -Trip Generation, Residential Other sq.ft. @ FAR Peak Hour Person -Trip Generation, Other Proposed Designation, Maximum Land Use Intensity Residential 0.52 acres @ 150 DU/acre Peak Hour Person -Trip Generation, Residential Other sq.ft. @ FAR Peak Hour Person -Trip Generation, Other Net Increment With Proposed Change: Population Dwelling Units Peak Hour Person -Trips Planning District County Wastewater Collection Zone Drainage Subcatchment Basin Solid Waste Collection Route Transportation Corridor Name 34 DU's 27 0 sq.ft. 77 DU's 39 0 sq.ft. 0 113 44 12 Alla pattah 322 G2 15 W 22nd Avenue RELEVANT MCNP GOALS, OBJECTIVES, AND POLICIES Land Use Policy 1.1.1 CIE Policy 1.2.3 NOTES 1. Permit for sanitary sewer connection must be issued by Metro -Dade Water and Sewer Authority Department (WASA). Excess capacity, if any, is currently not known CM_1_IN 03/13/90 RECREATION AND OPEN SPACE Population Increment, Residents Space Requirement, acres Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff 1'13 0.15 182.80 182.65 OK POTABLE WATER TRANSMISSION Population Increment, Residents 113 Transmission Requirement, gpd 25,249 Excess Capacity Before Change >2% above demand Excess Capacity After Change >2% above demand Concurrency Checkoff OK SANITARY SEWER TRANSMISSION Population Increment, Residents Transmission Requirement, gpd Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff STORM SEWER CAPACITY Exfiltration System Before Change Exfiltration System After Change Concurrency Checkoff SOLID WASTE COLLECTION Population Increment, Residents Solid Waste Generation, tons/year Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff TRAFFIC CIRCULATION Population Increment, Residents Peak -Hour Person -Trip Generation LOS Before Change LOS After Change Concurrency Checkoff 113 20,853 See Note 1, See Note 1. WASA Permit Required On-sito On -site OK 113 144 800 656 OK 113 12 8 B OK ASSUMPTIONS AND COMMENTS Population increment is assumed to be all new residents. Peak -period trip generation is based on ITE Trip Generation, 5th Edition at 1.4 ppv average occupancy for private passenger vehicles. Transportation Corridor capacities and LOS are from Table PT-2(r21), Transportation Corridors report. Potable water and wastewater transmission capacities are in accordance with Metro -Dade County stated capacities and are assumed correct, Service connections to water and sewer mains are assumed to be of adequate size: if not, new connections are to be installed at owner's expense. Recreation/Open Space acreage requirements are assumed with proposed change made.