HomeMy WebLinkAboutConcurrency ReportCONCURRENCY MANAGEMENT ANALYSIS
CITY OF MIAMI PLANNING DEPARTMENT
Proposal No 06-23 IMPACT OF PROPOSED AMENDMENT TO LAND USE MAP
Date: 6/21/06 WITHIN A TRANSPORTATION CORRIDOR
AMENDMENT INFORMATION CONCURRENCY ANALYSIS
Applicant. Regino H Villalonga, President, RHV of Miami, Inc
Address: 2648 NW 22nd Avenue
Boundary Streets: North: n/a East: NW 22nd Avenue
South: n/a West: n/a
Proposed Change: From: Medium Density Multifamily Residential
To: Restricted Commercial
Existing Designation, Maximum Land Use Intensity
Residential 0.52 acres @ 65 DU/acre
Peak Hour Person -Trip Generation, Residential
Other sq.ft. @ FAR
Peak Hour Person -Trip Generation, Other
Proposed Designation, Maximum Land Use Intensity
Residential 0.52 acres @ 150 DU/acre
Peak Hour Person -Trip Generation, Residential
Other sq.ft. @ FAR
Peak Hour Person -Trip Generation, Other
Net Increment With Proposed Change:
Population
Dwelling Units
Peak Hour Person -Trips
Planning District
County Wastewater Collection Zone
Drainage Subcatchment Basin
Solid Waste Collection Route
Transportation Corridor Name
34 DU's
27
0 sq.ft.
77 DU's
39
0 sq.ft.
0
113
44
12
Alla pattah
322
G2
15
W 22nd Avenue
RELEVANT MCNP GOALS, OBJECTIVES, AND POLICIES
Land Use Policy 1.1.1
CIE Policy 1.2.3
NOTES
1. Permit for sanitary sewer connection must be issued by
Metro -Dade Water and Sewer Authority Department (WASA).
Excess capacity, if any, is currently not known
CM_1_IN 03/13/90
RECREATION AND OPEN SPACE
Population Increment, Residents
Space Requirement, acres
Excess Capacity Before Change
Excess Capacity After Change
Concurrency Checkoff
1'13
0.15
182.80
182.65
OK
POTABLE WATER TRANSMISSION
Population Increment, Residents 113
Transmission Requirement, gpd 25,249
Excess Capacity Before Change >2% above demand
Excess Capacity After Change >2% above demand
Concurrency Checkoff OK
SANITARY SEWER TRANSMISSION
Population Increment, Residents
Transmission Requirement, gpd
Excess Capacity Before Change
Excess Capacity After Change
Concurrency Checkoff
STORM SEWER CAPACITY
Exfiltration System Before Change
Exfiltration System After Change
Concurrency Checkoff
SOLID WASTE COLLECTION
Population Increment, Residents
Solid Waste Generation, tons/year
Excess Capacity Before Change
Excess Capacity After Change
Concurrency Checkoff
TRAFFIC CIRCULATION
Population Increment, Residents
Peak -Hour Person -Trip Generation
LOS Before Change
LOS After Change
Concurrency Checkoff
113
20,853
See Note 1,
See Note 1.
WASA Permit Required
On-sito
On -site
OK
113
144
800
656
OK
113
12
8
B
OK
ASSUMPTIONS AND COMMENTS
Population increment is assumed to be all new residents. Peak -period trip
generation is based on ITE Trip Generation, 5th Edition at 1.4 ppv average
occupancy for private passenger vehicles. Transportation Corridor capacities and
LOS are from Table PT-2(r21), Transportation Corridors report.
Potable water and wastewater transmission capacities are in accordance with
Metro -Dade County stated capacities and are assumed correct, Service
connections to water and sewer mains are assumed to be of adequate size: if not,
new connections are to be installed at owner's expense.
Recreation/Open Space acreage requirements are assumed with proposed
change made.