1. General
A. Protect Location and Size:
The project is located along the west side of North Bayshore Drive
in the City of Miami; bounded on the north by N.E. 18th Street;
bounded on the west by N.E. 4th Avenue; and, bounded on the south
by privately held property. An existing 10-foot wide public alley
runs through the site in a north -south direction. The site has a
gross lot area of 117,663 square feet, or 2.70 acres; and, a net
lot area of 56,641 square feet, or 1.30 acres. The site has
approximately 190 feet of frontage along North Bayshore Drive;
approximately 391 feet of frontage along N.E. 18th Street; and,
approximately 96 feet of frontage along N.E. 4th Avenue.
The land on which the project is proposed consists of four (4)
parcels, identified as Miami -Dade County tax folio numbers 01-3231-
003-0560/0620/0630/0640. A legal description of the property is as
follows:
Lot 1, 2, 3 and 4, Block 8, of MIRAMAR, according to the
plat thereof, as recorded in Plat Book 5, at Page 4, of
the Public Records of Miami -Dade County, Florida.
The site is presently occupied by four (4) multi -story residential
buildings containing a total of 114 residential living units.
B. The proposed project build -out will be as follows:
Residential:
Retail:
648 units
10,000 sf
Net Lot Area 56,641 sf, or 1.30 acres
Gross Lot Area 117,663 sf, or 2.70 acres
Construction will consist of two (2) residential towers of 43 and
47 floors, including interior parking and ground level retail.
-1-
•
•
•
•
2. Drainage
A. Drainage Area
Upon development, approximately 90 per cent of the site will
be impervious and approximately 10 per cent of the site will
be pervious. Stormwater runoff will consist of rainfall from
the building roofs, driveways, walkways, landscape areas and
one-third of the vertical building surfaces.
The coefficient of runoff is calculated as follows:
90.0% (impervious) X 0.90
+ 10.0% (pervious) x 0.20
Overall coefficient
0.81
0.02
0.83
B. Existing Storm Drainage System
In the four parcels that make up this project site, runoff is
currently directed to a number of catch basins located in and
around the existing at -grade parking areas from which the
runoff is directed to underground seepage trench/exfiltration
trenches.
C. Proposed Storm Drainage System
The storm drainage system to serve this project will be
designed to direct the 5-year 1-day storm event to on -site
retention/exfiltration systems and to contain the 25-year 3-
day storm event on -site, as required to comply with the
applicable requirements of the Miami -Dade County Department of
Environmental Resources Management (DERM). While exfiltration
trenches will be reviewed for feasibility at this location, it
is anticipated that the stormwater disposal system will
include four (4) 24" drainage wells. See supporting
calculations in Table 1. Runoff will be collected through a
system of catch basins and conveyed by pipes to the well
locations.
Runoff from driving surfaces such as driveways and walkways
will be diverted through baffled pollution control structures
which will capture the oils and greases prior to flowing into
the wells.
-2-
•
•
Table 1
Preliminary Drainage Calculations
1. Total Net Area 1.30 Acres
a. Impervious
Roof/Driveways/Walks 1.17 Acres
1/3 Vert. Bldg. Surface 2.74 Acres
Total 3.91 Acres
b. Pervious 0.13 Acres
c. Adjusted Contributing Area 4.04 Acres
2. Adjusted Runoff Coefficient
3. 91. (0.9)+ 0.13(0.2)
4.04
0.88
3. Design Storm 5 years
4. Time of Concentration 1.5 minutes
5. Rainfall Intensity 5.50 in/hr
6. Peak Runoff (Q) = CiA (0.88)(5.50)(4.04)
= 19.55 cfs
Assume each 24-inch diameter drainage well has a capacity of 1,000
gpm per foot of head; and, using 2.5 feet of available head:
Well Capacity = 1,000 gpm x 2.5 feet = 2,500 gpm per well
5.57 cfs per well
No. Wells = Peak Runoff = 19.55 cfs = 3.50 wells
Well Capacity 5.57 cfs
Provide four (4) - 24" diameter Drainage Wells
Detention Tanks: Provide 1.5 minutes of detention time of
storage in detention tanks:
Volume of tanks required to handle 19.55 cfs for 1.5 min:
19.55 cfs x 1.5 min x 60 sec/min = 1,760 cubic feet (cf)
Provide four (4) tanks (one with each well) with the following
approximate interior dimensions:
4 times 6' -8" (width) x 13'-3" (length) x 5' (depth) = 1,768 cf
-3-
•
•
•
•
3 Water Distribution
The project is located in the water service area of the Miami -
Dade Water and Sewer Department (WASD). There is an existing
8-inch water main in North Bayshore Drive, an existing 6-inch
water main in N.E. 18th Street and an existing 4-inch water
main in the alley that runs through the site. A 12-inch water
main has been proposed by another developer for a portion of
N.E. 18th Street. These existing water mains are not
capable of providing the required domestic and fire flow
required for this project. As such, it is anticipated that
WASD and the Fire Department will require off -site water
system improvements to provide water service and fire
protection to this project. In addition, WASD will require
the removal of the existing 4-inch water main in the alley.
The water and fire service connections to this project will be
made from those new water main improvements. The connections
will consist of domestic water services, fire line services
and cooling tower/irrigation water service, as applicable. No
on -site water wells are planned for this project.
The calculations for anticipated water usage required for this
project are shown below, in Table 2.
Table 2
Water Usage
Residential Condominiums:
648 units @ 200 gpd/unit =
Retail:
10,000 sf @ 5 gpd/100 sf =
129,600 gpd
500 gpd
Total = 130,100 gpd
4-
•
•
•
•
4. Sanitary Sewer
The project is located in the sewer service area of the Miami -
Dade Water and Sewer Department (WASD) . WASD currently has 8-
inch and 12-inch gravity sewer mains located in the adjacent
streets on the west and north sides, respectively, which
appear to have adequate capacity to serve this project. It is
anticipated that new sewer laterals will need to be installed
from those existing sewer mains to serve this project. Flow
from this project will be directed to WASD pump station PS-02
which currently has sufficient available capacity to serve
this project. Therefore, it is anticipated that no new pump
station will be required to serve this project. Anticipated
sewage flow calculations are shown below, in Table 3.
Table 3
Sewage Flow Calculations
Average Daily Flow (Table 2) = 130,100 gpd
Average Daily Flow - 90.3 gpm
Peak Flow (90.3 x 2.0) - 180.6 gpm
-5-
•
•
•
5 Solid Waste Generation
Solid waste generated by this project will be collected in
standardized on -site containers for refuse and recyclable
waste. Regular service will be provided by either private
hauling companies and/or the City of Miami Solid Waste
Department. Both will transport the waste to Miami -Dade
County's Disposal or Recycling facilities.
The projected daily volumes of solid waste generation are
shown below, in Table 4.
Table 4
Solid Waste Generation
Residential Units:
Solid Waste
Retail:
Solid Waste
648 units x 1.42 tons/unit/year
921 tons/year
2.52 tons/day
5,046 lbs/day
10,000 sf x 3.08 lbs/sf/year
30,800 lbs/year
85 lbs/day
Total = 5,131 lbs/day
The project is located in the water and sewer service area of the
Miami Dade Water and Sewer Department (WASD).
-6-