Loading...
HomeMy WebLinkAboutExhibit 4Attachment A Budget and Scope of Work The Recipient, City of Miami, will do the Drainage Improvement Project to convey storm water runoff to the C-4 Canal. The proposed scope of work for the project consists of construction drainage improvement of an outfall storm water force main that runs across the Flagami and West End portions of the City along 64th Avenue from SW 6'h Street to the C-4 Canal City limits. This Phase II has been subdivided into four major construction Phases: Phase IA— Shared Storm Sewer Force Main System: Both the City of Miami and West Miami have agreed to jointly construct a Storm Sewer Force Main along 64'h Avenue from SW 6`h Street to the Tamiami Canal, also know as the C-4 Canal, which will serve both municipalities. The project includes the construction of a Force Main, to which storm water pump stations from both municipalities will be connected. The cost sharing agreement between the cities is based on the proposed flows, establishing the City of Miami portion equal to 61 % of the total construction cost of $1,770,000 or = $1,080,000. Since the right-of-way for this project is within the City of Miami, the project w ill b e constructed by the City of Miami, and its costs will be shared between both municipalities as described above. $1,080,000 Phase IB - Flagam&West End Storm Sewer Drainage Improvements: Phase IB consist of 2 storm water construction improvements within the Flagami and West End portions of the C ity t hat i ncludes s torm s ewer c ollection a nd e xfiltration s ystems, t wo s torm w ater p ump s tations, construction of two secondary force mains, and street and surface restorations. Pump Station # 1 will be located at the intersection of S.W. 6`h St and SW 63'd Ct., and. Pump Station # 2 will be located at the intersection of S.W. 2nd St and SW 63'd Ct in the City of Miami. DESCRIPTION UNIT UNIT COST QTY COST FRENCH DRAINS (24"I36") LF $120 5250 $630,000 RCP STORM SEWER (VARIOUS SIZES) LF $230 6000 $1,380,000 CATCH BASIN EA _ $2500 75 $187,500 J-BOX EA $5000 35� $175,000 HEADWALL —EA $10000 4 $40,000 PAVEMENT RESTORATION FLS $750000 1 $750,000 DIP FORCEMAIN (VARIOUS SIZES) LF $350 1000 $350,000 PUMP STATION EA $500000 2 $1,000,000 TOTAL $4,512,500 Phase LIA - Fairlawn Pump Station & Force Main Project Phase IIA consists of storm sewer improvements within the NW 4th Terrace portions of the Fairlawn area that includes construction of storm sewer collection systems, construction of a storm water pump station, construction of an outfail storm water force main, and street and surface restorations. 19