Loading...
HomeMy WebLinkAboutExhibit 2(City Uami CJU:::NN MARCOS Chief Procurement 011 iccr • R '""4 f'rp„ 0. J()E MUMMA City Ntonnitur ADDENDUM NO. 1 VIA: Electronic Notification RFP # 05-06-020 March 31, 2006 RAPID RESPONSE WATERCRAFT Please refer to the attachment for the Questions from prospective Proposers and the City's Answers to those Questions received before the stipulated due date. AT THIS TIME, ALL OTHER TERMS AND CONDITIONS OF THE RFP REMAIN THE SAME. SINCERELY, GLENN MARCOS, CPPO, CPPB, DIRECTOR CHIEF PROCUREMENT OFFICER THIS ADDENDUM IS TO BE SIGNED AND DATED BY PROPOSERS AND SHOULD BE SUBMITTED AS PROOF OF RECEIPT WITH THE SUBMISSION OF RESPONSES. SIGNATURE: DATE: 4/3/2006 /4014 414 `rc 1(/7 NAME OF FIRM: 1 44e7 ►`T C /c/ /Y #4(,re Addendum 111; ('its! of Miami Rapid itop m,w Winercre fr RPP 1I 05-06 O2(J ADDENDUM # RAPID RESPONSE WATERCRAFT RFP #05-06-020 Please be advised the following questions were received pursuant to the RFP and by the due date and time for receipt of all questions. Q1: Our company has several craft available that could meet the requirements of the RFP. Are there current models that the city is considering for the procurement, or that the requirements for the RFP were based on? Al: The .RFP was not based on any particular model. The City will select the proposal and watercraft most advantageous and in the best interest of the City. Q2: What vessels does the city currently have in its existing fleet and who were the previous builders? A2: City does not have any existing vessel like this and thus no previous builders. Q3: We have been developing a fast response craft design that could be tailored to the requirements set forth in your RFP. Would the city be willing to entertain a proposal for a new vessel design? A3: This design is based on previous craft designs, but tailored to meet more current requirements, including recent Department of I- omeland Security regulations. The RFP identifies overall vessel specifications without any specific manufacturer vessel design. Vessel design meeting the RFP minimum acceptable requirements are part of the manufacturer's proposal responsibility. Q4: The equipment suppliers will not cover unlimited hours warranty for 5 years as requested. Is this requirement mandatory? A4: The City of Miami requests that, in your proposal, the manufacturer/dealer provide their closest options to a live (5) year unlimited warranty stipulated in item numbers 36, 38, 39, 40, 41 and 42. 2