Loading...
HomeMy WebLinkAboutExhibit 7*ow tt ss b• CITY OF MIAMI, FLORIDA INTER -OFFICE MEMORANDUM To : Pedro G. Hernandez City Manager FROM Lisa Ivl zigue� Director Department of Economic Development DATE September 25, 2006 FiLE SUBJECT Emergency Finding: Professional Engineering and Inspection Company ("PEICO") Civic Towers -- Site Environmental REFERENCES Remediation Project ENCLOSURES BACKGROUND The Department of Economic Development is responsible for the site environmental remediation project being conducted at Civic Towers, an apartment building owned by The Related Group of Florida ("Related") located at ] 855 NW ] 5th Avenue. Based on assessments conducted in 2003 this property was part of a larger historic, contiguous vacant lot which extended from NW 17th Street north to the intersection.of NW 15`h avenue and Wagner Creek. Without admission of liability by the City of Miami, subsequent assessment and remediation activities have been conducted at the site to satisfy regulatory enforcement requirements associated with the discovery of buried waste that appeared to be indicative of incineration debris. The Department has identified the critical need for the proposed improvements due to requirements under a site remediation plan prepared by PEICO and approved by the Department of Environmental Resource Management ("DERM"). In addition, strict time constraints for the project's completion exist, introduced per negotiations conducted with Related. This project will complete the source removal and the application of appropriate engineering controls at a cost of $99,977,70 to actively contain contaminated material present at the property. PEICO's current contract with the City allows it to perform environmental assessments and engineering design services, the Department is requesting that PEICO be also permitted to conduct the capital improvements necessary to remediate the property and receive a No Further Action letter from DERM. FINDING The Department of Economic Development finds and determines that it is in the best interest of the City to waive competitive bids and secure the services of PEICO to complete the soil removal and the application of engineering controls (pavers, asphalt or clean fill) per the DERM approved site rehabilitation plan and to also satisfy the necessary time constraints for completion required by Related's development schedule. PEICO has been conducting assessments at the property since 12/05- and has performed favorably; thus far they have been ahead of schedule, within budget and have not requested any claims. This determination is based on our findings that PEICO is an appropriately licensed contractor and that in this instance, is familiar and experienced to undertake and perform such work because the firm, a) is currently conducting assessments at Civic Towers and two other adjacent properties, b) is familiar with the work, the project and physical conditions at the location, and c) can conduct the remediation in a timely basis to meet the development schedule of Related, avoiding any possibility of litigation. As provided in accordance with Florida statutes 255.20 and Section 18-89 & 18-90 (Public Works and Contracts) of the Code of the City of Miami, we recommend the City Manager affirm and adopt these findings and forward the matter to the City Commission for its approval. Your signature below will signify your concurrence with the above recommendation and your assimilation of these findings as your own justification for the waiver of competitive bids and the selection of the specified contractor and engineer. Approved: Pedro G. Hernandez, City Manager C: Jorge L, Fernandez, City Attorney Gary Fabrikant, Assistant Director