Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
O Site Utility Study
• Site Utility Study Tab 0 Note: Site Utility Study is based on 1258 units • • • MOW.2.1436a' WOK MIXONINOMMINIONIE IOWA __MINE Namormaroma�my nle" J� onmewmamw U rrr CIVIL LAND DEVELOPl,+.NT TRAFFIC AFFiC AND TRRANSPORTATiON Since 1989 SAWYER'S WALK MULTI USE DEVELOPMENT SITE UTILITY STUDY OCTOBER 2005 8550 W. FLAGLER STREET, SUITE 113, MIAMI, FLORIDA 33144 TEL: (305) 551-6267 s FAX: (305) 551-4542 • • • 3 SOW %rrMaduwwrrsw 11111411110111110 reAr1111111111K 11011AIIMMINIONIOR MI6 Since 1989 CIVIL LAND DEVELOPN NT TRAFFIC AND TRANSPORTATION TABLE OF CONTENTS Page 1. General 3 2. Storm Drainage System 5 3. Water Distribution System 7 4. Sewer Collection System 9 5. Solid Waste Generation 11 EXHIBITS: "A„ Existing Conditions Plan 13 Proposed Site Plan 14 "B" Storm Drainage Well Calculations 15 "C" MD-WASD Atlas (Sewer) 20 MDWASD Atlas (Water) 21 Proposed Water Use Calculations .. 22 DERM Pump Station Monthly Report 23 "D" Solid Waste Generation Calculations 26 2 • • • -ATMISIMINM r NNW NOMPOMMONISMINIMMj NN IMO 000 ok 1. General u?. i, l til ivyE i Sinccc' % 989 CIVIL LAND DEVELOPMENT TRAFFIC AND TRANSPORTATION SAWYER'S WALK- MULTI USE DEVELOPMENT SITE UTILITY STUDY A. Project Location and size: The proposed project consists of a Multi -use Facility to be constructed at an approximately 9.07 acre site in downtown Miami. The project limits are: to the west NW 3rd Avenue to the north NW 8th Street to the east NW 1st Court to the south NW 6th Street. The property consists of four separate blocks separated by NW 7th Street and NW 2nd Avenue. The property being in Section 1, Township 54 South, Range 41 East and , Section 36, Township 53 South, Range 41 East Miami -Dade County, Florida. B. Existing Conditions: The property consists of four separate blocks separated by NW 7th Street and NW 2" Avenue. In its existing condition the parcels are considered vacant. in the past this site was occupied by approximately 400 residential apartment units. 3 • • mome;n orsoommommew PM m L now L , IniC!._..__ Sine(' 1989 CIVIL LAND DEVELOPMENT TRAFFIC AND TRANSPORTATION C. The proposed project build -out will be as follows: Building # 1: Condominium Apartments Retail Building # 2: Condominium Apartments Retail Building # 3: Condominium Apartments Retail Building # 4: Condominium Apartments The total Build -out is as follows: Condominium Apartments Retail 362 Units 13,236 st 362 Units 13,236 sf 344 Units 35,000 st 190 Units 1,258 Units 61,472 sf 4 TM* \7\l��7 ®e+Ae /IiPr�la "7 MORMlialin 111001111MIMIE aemaniMi Since 1989 2. Storm Drainage System A. Existing Storm Drainage System: CIVIL LAND DEVELOPM-N1 "IRAFFIG AND TRANSPORTAT N Roadway storm drainage systems presently exist along the streets surrounding the proposed project. These systems are owned and maintained by the City of Miami. The site, in its existing or proposed conditions, does not or will not contribute any significant amount of storm water run-off into the Public Roadway System. No significant improvements to the existing Roadway Drainage System are expected as a result of this project. B. Proposed On -Site Storm Drainage System: The proposed storm drainage system to serve this project will be designed to fully contain on -site the storm water run-off and to meet the Miami - Dade County Department of Environmental Resources Management (DERM) requirements. This will be accomplished by means of deep drainage wells. No off- site run-off will be generated from this project. The total contributing site area and 30% of the building wall area exposed to the rain will be included in the Disposal Well System design calculations. An impervious coefficient of 0.95 will be used for the purpose of this study. Based on information provided by an experienced well drilling company for other projects in the vicinity, an approximate well discharge rate 750 gpm per foot of head can be expected. Storm water from roofs, internal driveways, walkways and parking areas will be conveyed by means of a collection system to sediment tanks sized to meet the detention volume requirements prior to discharging into the Well System. Additional Water Quality pre-treatment and Pollution Retardant Baffles at the catch basins will be provided at areas subject to vehicle traffic. • 5 • • v�„ serafforamiwwgsw NMI a rr v.r— Since CIVIL LAND D VFLOMENT TRAFFIC AND TFIANSPORTAii N C. Required number of Wells: The proposed wells will be designed to maintain the site dry during the 5 year-24 hour storm, to keep flooding below the perimeter grades during the 25 year-3 day storm and to keep flooding below the minimum floor elevation during the 100 year- 3 day storm. Based on the attached calculations, a total of nine (9) --- 24" diameter storm drainage wells are required to provide full on -site retention for this project depending on the actual yields obtained during the well drilling operations. For Well Disposal System calculations refer to attached Exhibit "B". 6 rm�r L�r--•tea setwoms momimmift r, i CiViL LA -1 € ND DEVELOPMENT TRAFFIC AND TRANSPORIATION Since 1989 3. Water Distribution System A. Existing Water System Facilities: Miami -Dade Water & Sewer Department (MD-WASD) owns and operates the following domestic water facilities in the vicinity of this project: • An existing 16-inch water main on NW 8u1 Street that runs along the entire northerly boundary of the project. • An existing 12-inch water main on NW 1s1 Court that run along the entire easterly boundary of the project. • An existing 16-inch water main on NW 7th Street that runs along the entire center of the project. • An existing 16-inch water main on NW 3rd Avenue that runs along the entire westerly boundary of the project. • An existing 12-inch water main on NW 2nd Avenue that runs along the entire center of the project. These existing water mains can be used to provide fire protection domestic and landscape irrigation service for this project. The existing water distribution system in the vicinity of this project will have to be evaluated by the MD-WASD Infill Committee to determine if additional extensions or contributions are required. That will be done at the time of permitting. B. Required Water System Improvements: Based on the records provided by Miami -Dade Water and Sewer Department (MD-WASD) the existing water mains appear to be adequate to support the proposed development. MD-WASD Infill Committee will make an evaluation of the system and may require additional system improvements. This will be determined during final design. 7 MOM , f7MMONANININNIONNIN MUM \\If/...„,,MONINOMNIMONOMM AMMONIUM .,1-'1AINIONONINNO ANNOONNIM ANONNINNIONNM MAIMAINNINIMOOMMM • • 4 [Cp ®� Lrj Pqg 7 1 " luinlcc;H I 1 Since 1989 C. Anticipated water use: CIVIL LAND DEVELOPMENT TRAFFIC AND ThANSPORTATiON The water use requirements for this project are calculated based on the build -out information previously described. An anticipated flow demand of 254,674 GPD is expected from this project. The previous flow demand from the existing buildings is 80,000 GPD. The net increase in demand from this project is 174,674 GPD. For determination of anticipated flows see Exhibit "C". 8 • • • NNW \ mum ijAir---411101001010111* rrarrr► 11111MIPONIM r016110101100110111111uMIN Ti Si11C'i? 1989 4. Sewer Collection System C(Vit LAND DEVELONT TRAFFIC AND TRANSPORTATION A. Existing Sanitary Sewer System Facilities: Miami -Dade Water & Sewer Department (MD-WASD) owns and operates the following sanitary sewer facilities in the vicinity of this project: An existing 10-inch gravity sewer line on NW 8th Street, that runs along the entire northerly boundary of the project. • An existing 18-inch and existing 8-inchgravity sewer line along NW 6Eh Street that runs along the entire southerly boundary of the project. • An existing 8-inch gravity sewer line along NW 3rd Avenue that runs along a portion of the Westerly boundary of the project. ✓ An existing 10-inch gravity sewer line along NW 7tb Street that runs along the entire center of the project. • An existing 10-inch gravity sewer line along NW 2'd Avenue that runs along the entire center of the project. These lines collect all the sanitary flows from the general area and direct them to MD-WASD Pump Station # 30-001 or 30-002 B. Required Sanitary Sewer System requirements: Based on the records provided by Miami -Dade Water and Sewer Department (MD-WASD) the existing sewer mains appear to be adequate to support the proposed development. No additional sanitary system improvements are expected. The Sanitary Sewer System in the vicinity of this project will have to be evaluated by the MD-WASD to determine if additional extensions may be required. That will be done at the time of permitting. 9 Okatik MEINIEWEINOW117 MOOMOrk ''sjar—,1111111 3•014#10. Mill1001116111 /11111111141•111111M.- 11101111011111.110011100 3.1..4111.1.11....01. MINIM . Since 1989 CIVIL LAND DEVELOPPENT TRAFFIC AND TRANSPORTADON C. Transmission Capacity Requirements The Wastewater generated by this project will be conveyed to MD-WASD Regional Pump Station No. 30-001 or 30-002. These are major pump stations with a yearly NAPOT of 2.93 hours per day as of November 2005 according to DERM. (See Exhibit "C"). The impact of this project on the ET of these stations is 0.05 and 0.17 hours respectively. The expected ET will be 6.66 and 4.83 hours which is less than the allowed 10 hours. Pump Stations No. 30-001 or 30-002 at this time has sufficient available capacity to support this project. • • 10 =Ma ARIMANIMPIMMIMOt MEM \ t IIMECOMMINIS WNW U.ar---.01WININHOLIN MINROOKONONIR INIWINIMMATA-.1_ FIRMA 111111111111111111MININI Since 1989 5. Solid Waste Generation CIVIL LAND DEVELOPMENT TRAFFIC AND TRANSPORTATION A. Solid Waste Generated by this project will be collected in standardized on - site containers for refuse and re-cyclables. Either hauling companies and/or the City of Miami Solid Waste Department will provide regular pick- up services. The anticipated daily solid waste generation for this project is 41 CY per day. (See Appendix "D"). • • Met f allIMONSIMIIM1810508 tisemt vvy.p.mesm rammsaU 101•00110116.--4 11 MINN Sincc 989- 100.00. Mit ISPAPINIE GIViL LAND D EVELOPivIENT TRAFF3G AND TRANSPORTATION EXHIBIT "A" EXISTING CONDITIONS PLAN PROPOSED SITE PLAN • • 1 2 Tr----:!--,,..,-..-7 -..i----1---7.; :i P,1:iTiFIT,44744-4 L. 2,.'rj, ';P''--'---T---- l''' —4— •-i,'-4'. ''•- 14,a',, F- .......) • J, --1-- ' i• '' I _ N --, .) , ; , 1 :•.!', 1 1 l'' ''>'1.L»i i t• 1 1, ._..-t.__ •-, _zi_Lc.,,—., -r- l'i —1" i4---•'•"-,—r-"•=— ----1—r- '-;1 '7..•----z,-,•'!-- -----7..:,, ----- 11 i. _,._,.....„.., ., ,.....,.,rn..r, .. s'."-' rea„.;.•!,t':•4:,'L,ii, ' 71 I 1:11±ti'. f' H 1 \ •• •M‘r...;VV, MI vol.:545TV C.,. jr ----- - [TIfrii .4,,, `..7.,7,1 ,.., ,;=z, 1_____T,.4—,-.., ,, .. kr •., !.k.,4 '4 -; ,45,5 5•555:5.5.555— • sG 1 1 3 • • ti il: 4397014i1. DUX: Ell- 10(l7 t CI* LI A' IO:�A Ill* (LJ* i_j* Di* f ij a � u SYORIES,uun 46 i __; 5560.42666 1 7 4 I FLAN A-0.O.1 6i. Tti f Rf;1.Ih1INhftY FLANS ro SAWYER'S WALK Fk.a IFFA svm s Non 45 r 56 • +a sron,Es�v_nc l r]ANSISUNICROMMONIIIK i11R / IMNINIIMIONAM OIIIMf1MMINIR miasigausmums • • Since 989 CML LAND DEVELORMEN7 TRAFFIC AND TRANSPORTATION EXHIBIT "B" Storm Drainage Calculations 15 "Moll ���=~�~� _.- Since 1989 CIVIL wDoFVUnPW-wr TRAFFIC AND TRANSPORIAMN PROJECT NAME SAWYER'S WALK 102112005 DRAINAGE AREA- EhJlOFlE SITE Page SITE DATA, SITE AREA = 9D7 ACRES BUILDING FOOT PRINT = 1500 F{ BUILDING H|GHT= 133 FT BUILDING WALL AREA = 4.58 ACRES CONTRIBUTING BUILDING AREA = 1.37 ACRES CONTRIBUTING AREA 10,44 ACRES NUMBER OFWELLS = 3 REQUIRED VOLUME FOR 90 SEC. DETENTION TIME (PER WELL): CONTRIBUTING AREA PER WELL = 3.48 ACRES RAINFALL INTENSITY (Q0SEC) = 0,4 |N8HR RUN OFF VOLUME (AOSEC) = 1.805 CF DETENTION VOLUME PROVIDED: TANKLBNGTH= 1&00 FT TANK WIDTH = 7�00 FT TANK BOTTOM ELEV= '2.50 NGVD TOP OFWELL CASING ELEV= 2.60 NBVD STORAGE DEPTH = 5.00 FT DETENTION VOL PROVIDED =(per well) 508 CF TOTAL DETENTION VOLUME = 5.040 CF 0 16 • • • sam n0111111111110M90110 wnrr ,111111111111111111111 wwr11MwMwr..__ a�rw u ram+ CIVIL LAND DEVELOPMENT TRAFFIC AND TRANSPORTATION PROJECT NAME SAWYER'S WALK 10/21/2005 DRAINAGE AREA: ENTIRE SITE Page 2 DRAINAGE WELL DATA: WELL DIAMETER WELL DISCHARGE RATE PER FT OF HEAD = AVAILABLE HEAD DISCHARGE RATE PER WELL = CUMULATIVE INFLOW/OUTFLOW DATA: STORM FREQUENCY = C FACTOR DRAINAGE AREA = # OF WELLS PROVIDED TOTAL DISCHARGE RATE = TOTAL DISCHARGE RATE = SEDIMENT TANK STORAGE _ F.D. STORAGE = SOLID PIPE STORAGE = INFLOW-EXFILTRATION TABLE 24 INCHES 750 GPM 4.00 FT 3,000 GPM 5 YEARS 0.95 10.44 ACRES 9 27,000 GPM 60.16 CFS 5,040 CF 0 CF D CF TIME MIN INTEN. IN/HR CUM.INFLOW CF SYST. STO. CF ADJ. INFL. CF WELL DISCH. CF OVERFLOW CFS 8 6.41 30512 5040 25472 28877 -7.09 10 6.17 36722 5040 31682 36096 -7.36 15 5.64 50399 5040 45359 54144 -9.76 20 5.20 61932 5040 56892 72193 -12.75 30 4.50 80309 5040 75269 108289 -18.34 40 3.96 94300 5040 89260 144385 -22.97 60 3.20 114194 5040 109154 216578 -29.84 90 2.48 132884 5040 127844 324866 -36.49 120 2.03 144727 5040 139687 433155 -40.76 150 1.71 152904 5040 147864 541444 -43.73 180 1.48 158888 5040 153848 649733 -45.92 17 • • 700000 600000 600000 U 400000 w © 300000 200000 100000 CUMULATIVE INFLOW-EXFILTRATION /.° / / / e# / 0/ WELL DISCHARGE 27,000 GPM /'� / / 1 / CUMULATIVE INFLOW le / ADJUSTED INFLOW 0 20 40 60 80 100 TIME (MIN) 120 140 160 180 200 • asc, t 7 mom\ Iaim CIVIL LAN© DEVELOP-WITT TRAFFIC AND TRANSPORTATION EXHIBIT "C" MD-WASD Sewer Atlas MD-WASD Water Atlas Proposed Water Use Calculations DERM Pump Station 30-001 and 30-002 Status 19 z ST 4 8 OVER 2 04 2 2 0 2 99 5 1 2 9 5 ilag=i1EITA N.) 5 0 4.-2 2 0 = • 4 7 0 \ 94 - SS s a 9 \ I -z !-13? CIVE FC riwE R 3032 lEe.M.NI=g271'w11-11.--MIE.-LII=11-L,1111-1EitEll=7,XaM --= 12.ev Ya? 4,9 0 3-240 HD cPi E,RT-0- /L oqL: 513 27 1310 hit + 5 t.3 IL 11 90 I Vr76a-q=1TZEIV,' L T 4- 1 548 8 I f,f) a • • Lcc N (\\,,,5_920.1)9 16 z 6 NW 7AST NW6S s z 8827 t 2 16 107'3 �1 9 • • '! anew►.. Jlpp� milli 4111M reawn aew 100LI s �rr� 10111111111111111111111111111111111111111 L� ieeeae CIVIL LAND OEVELOF IEN i TRAFFIC AND TRANSPORTAT}CN In e 1989 PROPOSED WATER USE CALCULATIONS PROJECT SAWYER'S WALK DATE: 4-Oct-05 TYPE OF BUILDING USE AREA tsf] tUnits] RATE [9 pd/sf] gpdfunit ADF [gpd] 1 NET INCREASE: 'i74,674 PROPOSED FLOWS: Building # 1 Condominium Units Retail Building # 2 Condominium Units Retail Building # 3 Condominium Units Retail Building # 4 Condominium Units Retail SUB -TOTAL PREVIOUS FLOWS: Residential Apartment Units SUB -TOTAL 362 200 72.400 13.236 0,05 662 362 200 72,400 13,236 0.05 662 344 200 68,800. 35.000 0.05 1,750 190 200 38.000 0 0.05 0 254,674 400 200 80,000 80.000 8550 W. FLAGLER STREET, SUITE 113, MIAMI; FLORIDA 33144 TF1 • I tr1 RR1_F7R7 a FAY. Pump Station Monthly Information Staton..30 -0001 Atlas Pg..F14 DADE WATER & SEWER DEPARTMENT 390 NW NORTH RIVER DR Moratorium effective since -Township-Range 1-54-41 Cenr.0 ET olock.Y Teim,Y ffPumps. 8 Pump type...?). Stn Class.M Speed,? Hrspwr.± Res flow(and) Proj Napot % Cap Plans.. 6,699,283 Date 09/27/2005 08/26/2005 07/28/2005 06/28/2005 05/27/2005 04/28/2005 03/01/2005 GOLD/M GOLDID GOLD/G • Station <D>ownstream Station Codes & Cata<g>ories *2005110211091041*DEARMM ent. * M Stat Station R Type Owner Proposed Number 6.62 hrs 66.20 Mo N.APOT Avg Daily Regard Reading 6.99 48.92 5.01 35.08 6.17 43.20 7.49 52.43 5.66 39.65 3.75 26.26 4.77 33.39 Signatare..GARCIM i<m>provement GOLD/S GOLD/T <Plan Review> Moratorium.,OK ..... ................. Yearly NAPOT (hrs) 5.41 Stn Gross Capacity(gpd)..221,760,000 Station Reduction. Factor 0.60 Stn Net Cap Certif(g-od),. 0 Stn Net OaDacity(Tpd)....133,056,000 indicated Flows(gpd) 29,993,040 Number of 3DUMIDS 8 8 8 8 8 8 Comments 8 -- Sign Date..12/20/2004 17:40:49.89 <S>tation inform GOLD/U <U>IDstream Station GOLD/P <P>unit) information Sewer Cer<t>ification Station Number of gallons (gpd): 251474 ****************************** OK A52M+ 30 AC 30 0001 CD Downstream * This is not an official docum Current Delta Projected ET (Hrs) ET (Hrs) ET (hrs) Stations ***************************** 6.62 1001.97 0.05 0.05 6.66 1002.02 23 Pump Station Norithly" information Station..30 -0002 Atlas Pc...E13 MIAMI DADE WATER---& SEWER DEPARTMENT `d r .. 9 2 5 B I CAYNE B LV -- _l tf,_ x7 ;W,---i=ang=. _ ..... . ....31-53-4.2 Cony .0 ET cloc i.Y 3_Y V umps. 5 Pumps Typc..A Stn C!ass.M Speed. . H spw1. Res 5.±ow (g d) Proj NanoL % Cat) aril. _ 2,481,728 Date 09/27/2005 08/26/2005 07/28/2005 06/28/2005 05/27/2005 04/28/2005 03/01/2005 GOLD /M GOLD/D GOLD/G • 4.65 3rs 46.50 3o_NNPOT Avp Da _ y Regard Reading 3.74 14.94 Y 2.80 11.19 Y 3.15 12.59 Y_ 3.68 14.72 Y_ 2.90 11.58 Y 1.49 5.95 Y_ 2.92 11.67 Y Signa Lure .. LEALG Station I<m>IY10.re tent GOLD/S <D>ovsnstream Station Codes & Cata<r>onies GOLD/T <Plan Review> r1c: a L o?' i L . _ Oiti � oraterIurii ed_ -ec _.arc sJ_t�ce Yearly N PO7 (h s ) Stn Gross Capacity (g,pd) . Station Reduction Factor Stn Net Cap, Ccrt i (crlad) _ Stn Net Ca.naciLy (gnd) _ . _ 34, 560, 000 indicated '="! ows (g Dd) 4,219,200 2.93 57,600,000 0.60 Number 05 pumas 5 5 5 5 5 5 5 Comments 0 Sign Da',:.e..03/17/2003 13:52:24.01 <S>tat7 on Inform_ GOLD/U <U>pstream Station GOLD/P <P>ump Information Sewer Cer<t> ificati o_n *2005120211094739*DEAR31N ent. * 1 'Stat Station Station R Type Owner Number Proposed Number of gallons (apd) : 251474 * * * * * * * * * * * * * * * * * * * * * * * * * * * * Downstream O, A5RN+ 30 0002 AC 30 CD • .1, 1s is not an official docum Current ET (Ers ) Stations 4.65 1001.97 Delta ET (:arS) Projected .1 (Ers ) * * *7 * ****j; ***r. ********r. *, * 0.17 0.05 4.83 1002.02 24 EMI V, r7 AMINIMINIVAININIMPM MEW MEM= ,.J10,--Nfaxzwerweeps 181111k11111011611 NOMINONIMINA4 11001 ONNINEMIsaimistia maneesiminew )Mi* n errinIck; G.. I F. I -r- t I 7i1 " r Sin1989 CIVIL LAND DEVELOPMENT TRAFFIC AND TWISPORTATION EXHIBIT "D" Solid Waste Generation Calculations 2 5 • • MEM \\v/7 Sioldemimemlida NOOK ,j41.—WWIMMINONO.,__, 11111 0111BOSISIII rqi adnIvI1 "rni®W t;P . r --t Mic Since 1989 CfVIL LAND DEVELOPMENT TRAFFIC AND TRANSPORTATION PROPOSED SOLID WASTE CALCULATIONS PROJECI SAWYER'S WALK DATE: 21-Oct-05 TYPE OF BUILDING USE AREA/UNITS [sf] [seats] RATE [1b/sfl [Ibiseat] SOLID WASTE GENERATED [lb] SOLID WASTE GENERATED [Ions} PROPOSED BUILDING: APARTMENT UNITS 1,258 8 10,064 5.03 RETAIL 61,472 0.025 1,537 017 NET INCREASE: 11,601 5.80 ANTICIPATED SOLID WASTE VOLUME AT 7 CY PER T( 41 CY 1 DAY 8550 W. FLAGLER STREET, SUITE 113, MIAMI, FLORIDA 33144