HomeMy WebLinkAboutConcurrency Report (Revised)CONCURRENCY MANAGEMENT ANALYSIS
CITY OF MIAMI PLANNING DEPARTMENT
Proposal No 06-17 IMPACT OF PROPOSED AMENDMENT TO LAND USE MAP
Date: 6/22/06 WITHIN A TRANSPORTATION CORRIDOR
AMENDMENT INFORMAL -ION
CONCURRENCY ANALYSIS
Applicant: W Tucker Gibbs on behalf of Applicant
RECREATION AND OPEN SPACE
Population Increment, Residents
30
Address: 10 & 20 NW 32nd Court
Space Requirement, acres
0.04
Boundary Streets: North: n/a East: SW 32nd Court
Excess Capacity Before Change
182.80
South: n/a West: n/a
Excess Capacity After Change
182.76
Proposed Change: From: Duplex Residential
Concurrency Checkoff
OK
To: Restricted Commercial
Existing Designation, Maximum Land Use Intensity
POTABLE WATER TRANSMISSION
Residential 0.25 acres @ 18 DU/acre
5 DU's
Population Increment, Residents
30
Peak Hour Person -Trip Generation, Residential
5
Transmission Requirement, gpd
6,764
Other sq.ft. @ FAR
0 sq.ft.
Excess Capacity Before Change
>2% above demand
Peak Hour Person -Trip Generation, Other
Excess Capacity After Change
>2% above demand
Concurrency Checkoff
OK
Proposed Designation, Maximum Land Use Intensity
Residential 0.25 acres @ 65 DU/acre
16 DU's
SANITARY SEWER TRANSMISSION
Peak Hour Person -Trip Generation, Residential
13
Population Increment, Residents
30
Other sq.ft. @ FAR
0 sq.ft.
Transmission Requirement, gpd
5,587
Peak Hour Person -Trip Generation, Other
0
Excess Capacity Before Change
See Note 1.
Excess Capacity After Change
See Note 1.
Net Increment With Proposed Change:
Concurrency Checkoff WASA
Permit Required
Population
30
Dwelling Units
12
STORM SEWER CAPACITY
Peak Hour Person -Trips
8
Exfiltration System Before Change
On-site
Exfiltration System After Change
On-site
Planning District West Flagler
Concurrency Checkoff
OK
County Wastewater Collection Zone
310
Drainage Subcatchment Basin
Q1
SOLID WASTE COLLECTION
Solid Waste Collection Route
27
Population Increment, Residents
30
Transportation Corridor Name
Flagler
Solid Waste Generation, tons/year
Excess Capacity Before Change
39
800
RELEVANT MCNP GOALS, OBJECTIVES, AND POLICIES
Excess Capacity After Change
761
Concurrency Checkoff
OK
Land Use Policy 1.1.1
CIE Policy 1.2.3
TRAFFIC CIRCULATION
Population Increment, Residents
30
Peak -Hour Person -Trip Generation
8
LOS Before Change
D
LOS After Change
D
Concurrency Checkoff
OK
NOTES
ASSUMPTIONS AND COMMENTS
1. Permit for sanitary sewer connection must be issued by
Metro -Dade Water and Sewer Authority Department (WASA).
Excess capacity, if any, is currently not known
Population increment is assumed to be all new residents. Peak -period trip
generation is based on ITE Trip Generation, 5th Edition at 1.4 ppv average
occupancy for private passenger vehicles. Transportation Corridor capacities and
LOS are from Table PT -2(R1), Transportation Corridors report.
Potable water and wastewater transmission capacities are in accordance with
Metro -Dade County stated capacities and are assumed correct. Service
connections to water and sewer mains are assumed to be of adequate size; if not,
new connections are to be installed at owners expense.
Recreation/Open Space acreage requirements are
assumed with proposed
change made.
nnn 1 IN n411 lion