Loading...
HomeMy WebLinkAboutConcurrency ReportCONCURRENCY MANAGEMENT ANALYSIS CITY OF MIAMI PLANNING DEPARTMENT Proposal No 06-17 IMPACT OF PROPOSED AMENDMENT TO LAND USE MAP Date: 6/07/06 WITHIN A TRANSPORTATION CORRIDOR AMENDMENT INFORMATION CONCURRENCY ANALYSIS Applicant: W Tucker Gibbs on behalf of Applicant RECREATION AND OPEN SPACE Population Increment, Residents 85 Address: 10 & 20 NW 32nd Court Space Requirement, acres 0.11 Boundary Streets: North: n/a East: SW 32nd Court Excess Capacity Before Change 182.80 South: n/a West: n/a Excess Capacity After Change 182.69 Proposed Change: From: Duplex Residential Concurrency Checkoff OK To: Restricted Commercial Existing Designation, Maximum Land Use Intensity POTABLE WATER TRANSMISSION Residential 0.25 acres @ 18 DU/acre 5 DU's Population Increment, Residents 85 Peak Hour Person -Trip Generation, Residential 5 Transmission Requirement, gpd 18,997 Other sq.ft. @ FAR 0 sq.ft. Excess Capacity Before Change >2% above demand Peak Hour Person -Trip Generation, Other Excess Capacity After Change >2% above demand Concurrency Checkoff OK Proposed Designation, Maximum Land Use Intensity Residential 0.25 acres @ 150 DU/acre 38 DU's SANITARY SEWER TRANSMISSION Peak Hour Person -Trip Generation, Residential 19 Population Increment, Residents 85 Other sq.ft. @ FAR 0 sq.ft. Transmission Requirement, gpd 15,690 Peak Hour Person -Trip Generation, Other 0 Excess Capacity Before Change See Note 1. Excess Capacity After Change See Note 1. Net Increment With Proposed Change: Concurrency Checkoff WASA Permit Required Population 85 Dwelling Units 33 STORM SEWER CAPACITY Peak Hour Person -Trips 14 Exfiltration System Before Change On-site Exfiltration System After Change On-site Planning District West Flagler Concurrency Checkoff OK County Wastewater Collection Zone 310 Drainage Subcatchment Basin Q1 SOLID WASTE COLLECTION Solid Waste Collection Route 27 Population Increment, Residents 85 Transportation Corridor Name Flagler Solid Waste Generation, tons/year 109 Excess Capacity Before Change 800 RELEVANT MCNP GOALS, OBJECTIVES, AND POLICIES Excess Capacity After Change 691 Concurrency Checkoff OK Land Use Policy 1.1.1 CIE Policy 1.2.3 TRAFFIC CIRCULATION Population Increment, Residents 85 Peak -Hour Person -Trip Generation 14 LOS Before Change D LOS After Change D Concurrency Checkoff OK NOTES ASSUMPTIONS AND COMMENTS 1. Permit for sanitary sewer connection must be issued by Metro -Dade Water and Sewer Authority Department (WASH). Excess capacity, if any, is currently not known Population increment is assumed to be all new residents. Peak -period trip generation is based on ITE Trip Generation, 5th Edition at 1.4 ppv average occupancy for private passenger vehicles, Transportation Corridor capacities and LOS are from Table PT -2(R1), Transportation Corridors report. Potable water and wastewater transmission capacities are in accordance with Metro -Dade County stated capacities and are assumed correct. Service connections to water and sewer mains are assumed to be of adequate size; if not, new connections are to be installed at owners expense. Recreation/Open Space acreage requirements are assumed with proposed change made. CM 1 INwimv9n