HomeMy WebLinkAboutExhibit 2ATTACHMENT "A"
ADDITIONAL. DESIGN WORK
«Professional Initials: Lowercase Type User»:Document 52833
EXHIBIT "A"
Additional Design Work — Phase II
As per the agreement in Phase I, the Design work is completed from Conceptual to
Permit Plans Documents, except for the followings items that will be complete in Phase
II of the agreement.
• A 200 S.F. of Park sign to be designed at the main entrance from Northwest 37th
Avenue.
• Finalize the design theme showpiece monumental sculpture as design by Britto
Art Design at the entry plaza to the aquatic facility.
• Finalize the site furnishings in the aquatic facility shall match the entry sculpture
des ign
• Finalize the design of the each water theme component as listed below:
1. Aquatic Facility Entrance Plaza
2. Water Activity Pool with Beach Entries
3. Wacky Waterway — Lazy River
• Finalize the Fountain Designs for the Entrances of the parks
• Additional design maybe required by all permitting agencies from the local,
county, state, and federal,