HomeMy WebLinkAboutSubmittal Change of OrderRECEAT.CNL ESN & C.
June '3. '006
SUBMITTED INTO THE
PUBLIC RECORD FOR
ITEM 8 E 17 ON /0-/.7-04 .
Program Manager.
HDR, inc. for City of Miami.
444 S 2"'l Avenue - Suite 10.38. 10Floor
Miami, Florida 33130
Attn: Roger Hatton, PE, CGC
Re: Little Haiti Soccer & Recreation Center - Additional Change Orders for Project
1-)ear Roger:
Per your request RDC. inc. is subminino. three (3i additional change orders requests related to the new
permit fee allowance (COR#16). new building (COR#17) and the bleacher canopy upgrades (COR#18).
The table below shows ail change order requests to date. including, the last three mentioned above.
CHANGE ORDER #
DESCRIPTION OF CHANGE ORDER
CHANGE ORDER VALUE
COR.#1
6" diameter irrigation well with 20 HP and 5 HP pumps
S41.907.00
COR;;f2'
Supply and install 25 poles with lights for walkways
S77,119.00
(:(..)R#.3
Supply and install 2-75' concrete poles with light fixtures
S59.040.00
C.-OR#4
RDC extended general conditions and design fees
$239.796.00
Locate and abandon 16 septic tanks
S41.845.00
COR#6**
Demolition of 3 existing buildings
S39,131.00
COR.#7
Excavation, separation, hauling and dumping tires
S13,816.00
COR#8
Demolition of pink wall and garbage enclosure
S5,808.00
COR#9
Pulling 26 light pole stumps and disposal of FPL materials
S7.260.00
COR# 10
Remove concrete slabs, foundation and site cleanup
SI 3.068.00
COR#11
Pump, clean, excavate and dispose of 21 septic tanks
S34,654.00
('OR # i 2
Prepare site for temporary NET Office trailer
S82,686.00
COR,-#13
Utility Easement Survey
S7,058.00
COR#,14
ADA access elevator
S368.098.00
COR.--15
Upgrade 1,120 LE of 6' fence to 8' fence
. S11.2 I 6.00 •
CO R# i 6
Permit Fees Allowance
S5.5.000.00
17
. New Community/NET Office Bldg. Additional Costs
S624.300.00
COR7-71S
Bleacher Canopy Upgrade Costs
S317.450.00
OWFICT'S Contingency
S380.000.00
P4- Dif7TV
Pagc2 of
June 23. 200(r)
Att'n - Roger Hatton
( " Chan,Lte Order Requests Rejected i3v City of Miami
Submitted Into the public
record if connection with
item xeri on
Priscilla A. Thompson
Clerk
The total projected cost increase from RDC's perspective shall be $2.303,002.00. RDC Will -Compile the
information with backup For the last three change orders and submit same al a later dale. If there are anv
questions or comments. please contact us at (954) 566-3885.
Sincerely
Everton Jackson.
Protect fvlanager. RDC.. Inc.
cc: Joseph Cerrone_ II] (President, RDC)
Steve Westervelt (VP Director of Construction. RDC)
Ariel Guitian (Project Manai!cr. RDC]
Ana Fleckenstein (Preconstruction Mr.. RDC)
Lim Blanc (Senior Estimator, RDC)
P. 7: 1711., LEFV. VIt!1111,- a`Z i.citer , pi