Loading...
HomeMy WebLinkAboutExhibit SUBDEP AGREEMENT NO. CZ603 AGREEMENT TO REINSTATE THIS AGREEMENT as entered into on the 22nd day of November, 2005, between the STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION (hereinafter referred to as the "Department") and the CITY OF MIAMI (hereinafter referred to as "Grantee") is hereby incorporated by reference and reinstated as amended below. WHEREAS, the Grantee determines that it is necessary to reinstate the original Agreement, extend the project period ending date to June 30, 2007 and amend the Project Objectives and Related Tasks and Deliverables as shown in Attachment A to the original Agreement; and WHEREAS, the Department, acting as the Florida Coastal Management Program, agrees with the Grantee that the amendment is needed. NOW, THEREFORE, DEP Agreement No. CZ603 is hereby amended as follows: 1. Section (2) of the Agreement is revised to change the ending date of the Agreement from September 30, 2006, to June 30, 2007. 2. Project Objectives and Related Tasks and Deliverables in original Attachment A is hereby deleted in its entirety and replaced with the Revised Project Objectives and Related Tasks and Deliverables attached hereto as Attachment A-1 and made part hereof. Any reference to sections of Attachment A shall be replaced by reference to the corresponding sections of Attachment A-1. In all other respects, DEP Agreement No. CZ603 and attachments relative thereto is reinstated and shall remain in full force and effect. IN WITNESS WHEREOF, the parties have caused this Agreement to Reinstate as Amended to be duly executed the day and year last written below. CITY OF MIAMI STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION By: By: Pedro G. Hernandez Sally B. Mann, Director Intergovemmental Programs City Manager Date: Date: aG - o/G'7f7 DEP Grants Manager APPROVED as to form and legality: ---, THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL _ '=:,:g ORIGINAL CAN BE SEEN AT NOD OIS DOCUMENT ATTEST: Priscilla Thompson City Clerk APPROVED AS TO FORM AND APPROVED AS TO INSCE CORRECTNESS: REQUIREMENTS: Jorge L. Fernandez City Attorney ,7c77,1e1' Lee Ann Brehm 7 / Director Risk Management THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL BACKUP. ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT ATTACHMENT A-1 PROJECT WORK PLAN FY04-05 DEP Agreement # CZ603 Project Title: Developing a Master Plan for Miami's Virginia Kev Recipient Organization Name: City of Miami Chief Elected Official or Agency Head: Robert Ruano Title: Grant Administrator Address: 3500 Pan American Drive Zip Code: 33133 Area Code and Telephone Number: (305) 416-1532 Area Code and Facsimile Machine Telephone Number: (305) 416-2151 E-Mail Address: RRuano@ci.miami.fl.us Project Manager Organization Name: City of Miami Name: Enrique Nunez Address: 444 SW 2"d Avenue, 3rd floor Zip Code: 33130 Area Code and Telephone Number: (305) 416-1419 Area Code and Facsimile Machine Telephone Number: (305)416-2156 E-Mail Address: ENunez@ci.miami.fl.us Mailing Address for Warrant (if other than the Recipient address): County in which project is located: Miami -Dade Project is Statewide: THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL BACKUP. ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT Scope of Work Information Abstract Description: Briefly but completely describe the problem to be addressed and the project solution to the problem. Please limit to one page. Virginia Key is a natural barrier island that lies within Biscayne Bay and is located proximate to downtown Miami, the Port of Miami and Miami Beach. In order to preserve the island's unique natural beauty and character, a master plan will be initiated to devise a 'road map' for preserving the island. The master plan will focus on mixed -use waterfront development, recommended improvements to the existing sewage treatment plant, restoration of tidal flow to the historic Virginia Key Beach Park, protection of wetlands and upland habitats along the Virginia Key Interpretive Trail, and other island -wide improvements. FCMP funds will be used for contract services to survey existing conditions and conduct a site analysis of Virginia Key, facilitate a community design workshop, produce a draft master plan and final report, and coordinate project -related meetings to steer work -in -progress THIS DOCUMENT I ORIGINAL _ A1:. F). �, { SEEN AT END OF HIS DOCUI ` n NI To Project Objectives and Related Tasks and Deliverables: List project objective(s) and tasks that will accomplish each objective. Indicate the quarter in which these tasks will occur and will be delivered. Deliverables or work products must be provided. Objective 1: Research and Data Collection (Complete by November 30, 2006) Task 1: Survey of existing conditions and Site Analysis of Virginia Key Deliverable: Site Analysis Task 2: Research Historic References Deliverable: Site Inventory Task 3: Review pertinent plans and studies Task 4: Environmental Research Task 5: Economic Analysis Task 6: Traffic Consultant/Analysis Objective 2: Community Design Workshop (Complete by November 30, 2006) Task 1: Local Community Meetings Task 2: Community Public Information Workshop Objective 3: Producing a Draft Master Plan (Complete by February 28, 2007) Task 1: Preliminary Master Plan Task 2: Final Master Plan and Implementation Strategy Deliverable: Copy of Final Master Plan Task 3: Virginia Key Urban Design Regulations Objective 4: Master Plan Documentation and Communication (Complete by April 30, 2007) Task 1: Master Plan Report Deliverable: Copy of preliminary draft of master plan report Task 2: Preparation, Printing, Copying, etc. of Master Plan Report Deliverable: One (1) bound copy and one (1) electronic copy of the Master Plan Report and Virginia Key Urban Design Regulations Task 3: Mounted Renderings Task 4: Virginia Key Master Plan Website and Public Information Flyers/Community Bulletins Deliverable: Copy of public information flyers/community bulletins. Task 5: Format of Deliverables Objective 5: Master Han Project Administration (Complete by May 31, 2007) Task 1: Plan Public meetings with city and county staff Task 2: Hold public meetings THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL BACKUP. ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT Project Budget Schedule: Type dollar amounts only in applicable categories (round to the nearest dollar; no cents) and leave other categories blank. If your grant Agreement requires match, it must, at a minimum, equal the FCMP funds requested, or one hundred percent (100%). If Automated Data Processing equipment is being purchased please complete and submit Appendix 1. If the cost for any service or equipment is over $25,000 and will be from a noncompetitive sole source, please also submit a Sole Source Justification Form (Appendix 2). A budget transfer of funds (within approved budget categories), in an amount not to exceed 10 percent of the FCMP total budget, is allowed without requesting an official amendment. Budget Category FCMP Funds MATCH Funds 1. Salaries 9,200.00 2. Fringe Benefits 4,302.00 3. Travel 4. Equipment Purchases 5. Supplies 6,000.00 6. Contractual Services 50,000.00 11,546.00 7. Construction 8. Other Expenses 18,952.00 9. Indirect Charges FCMP Total 50,000 Match Total 50,000 Total Project Cost: $100,000 THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL BACKUP. ORIGINAL CAN BE SEEN AT END OF T:HIS DOCUMENT Proiect Budget Narrative: Describe line items for each applicable budget category shown on the budget schedule. Provide sufficient detail to show cost relationship to project activities. Complete for both FCMP and match items, if applicable. If in -kind match is being provided by a third party, a letter from that party confirming the amount and type of that match must be included with this project work plan. Note: Indirect costs are not allowed as match. FCMP Funds: Contractual: $50,000 FCMP funds will be used towards the full cost of the environmental consultant and towards partial costs of the landscape architecture/planning firm which equals the requested $50,000. Match Funds: Salary: $9,200 -- 100% from City (local cost share) -- This represents a contribution by the applicant of 10% of the Project Manager's time. The Project Manager, a Registered Landscape Architect, will provide overall direction for the Project. The salary figure of $92,000 is based on his current salary as an Acting Planner III. Fringe Benefits: $4,302 — 100% from City — The City's fringe rate for civilian personnel in the Project Manager's pay class is 46% of salary. Supplies: $6,000 — Supplies include the following: 1) Photographic and architectural related supplies including but not limited to foam core boards and laminating for mounting presentations and renderings of project concepts and components. 2) Reproduction of final products, reports, drawings, and project deliverables. 3) Software towards needed for the creation and maintenance of project website. 4) Courier services and express mailings. 5) General Office Supplies Contractual Services: $11,546 —from City. Various city staff along with a Project Manager, an experienced Planner, at 10% of the project costs, will coordinate the drafting of the scope of work and assure that the project timelines are adhered to, and that reports are completed. The remaining funds will be used for the master planning process. A group of consultants has been selected through the RFQ process. A landscape architecture/planning firm at 42% will create and lead the process outlined in the project description. In addition, an economic consultant at 14%, an environmental consultant at 10%, an urban design consultant at 12%, and a traffic consultant at 12% will assist in the process. Other Costs - $18,952 — 100% from City. Other costs include the preparation of land, boundary and bathymetric surveys for water depth information required for the inventory and analysis phase of the master plan study. The preparation of surveys and gathering of information necessary for the master plan study will be performed by private land surveyors for the City. THIS DOCUMENT IS A SUBSTITUTION TO ORIGINAL BACKUP. ORIGINAL CAN BE SEEN AT END OF THIS DOCUMENT EXHIBIT A DEP GRANT CZ603 AMENDMENT NO. 1 SU ITUTED 7?. 1:S: g/ DEP AGREEMENT NO. CZ603 AMENDMENT NO. 1 THIS AG ENT as entered into on the 22nd day of November, 2005, between the STATE OF FLORIDA DEPARTN NT OF ENVIRONMENTAL PROTECTION (hereinafter referred to as the "Department") and the t Y OF MIAMI (hereinafter referred to as "Grantee") is hereby amended, WHEREAS, the Grant Deliverables as shown in Attac June 30, 2007; and determines that it is necessary to amend Project Objectives and Related Tasks and nt A to the original Agreement and to extend the project period ending date to WHEREAS, the Department, ang as the Florida Coastal Management Program, agrees with the Grantee that the amendment is needed, NOW, THEREFORE, DEP Agreemen o. CZ603 is hereby amended as follows: 1. Section (2) of the Agreement is revise • o change the ending date of the Agreement from September 30, 2006, to June 30, 2007, 2. Project Objectives and Related Tasks and De ' erables in original Attachment A is hereby deleted in its entirety and replaced with the Revised Proj Objectives and Related Tasks and Deliverables attached hereto as Attachment A-1 and made •art Q Any reference_to sactions of Attachment A shall be replaced by reference. to the corresponding s tions of Attachment A-1, In all other respects, DEP Agreement No. CZ603 and attac is relative thereto, shall remain in full force and effect. IN WITNESS WHEREOF, the parties have caused this Amendment to be duly ecuted the day and year last written below, CITY OF MIAMI STATE OF FLORIDA D. • ARTMENT OF ENVIRONMENTAL P ' OTECTION By: Pedro G. Hernandez, City Manager By: Sally B. Mann, Director Intergovernmental Programs Date: Date: DEP Grants Manager APPROVED as to form and legality: SUBSTIiUYED DEP Agreement # 603 ATTACHIMENT A-1 PROJECT WORK PLAN FY04-05 Protect Title: Develo•in a M ter Plan for Miami's Vir inia Ke Recipient Organization Name: City ofMia Chief Elected Official or Agency Flea • Robert Ruano Title: Grant Administrator Address: 3500 Pan American Drive Zip Code: 33133 Area Code and Telephone Number: (305) 416.15 Area Code and Facsimile Machine Telephone Numbe . (305) 416-2151 E-Mail Address: RRuano@ci,miami.fl.us Protect Manner Organization Name: City of Miami Name: Enrique Nunez Address: 444 SW 2" Avenue, 3`d floor Zip Code: 33130 Area Code and Telephone Number: (305) 416-1419 Area Code and Facsimile Machine Telephone Number: (305)416-2156 E-Mail Address: ENunez@ci.miami.fl.us Mailing Address for Warrant (if other than the Recipient address): County In which project is located: Miami -Dade Project is Statewide: SU :TITUTED Scope of rk Information Abstract Descr solution to the problem. tion: Briefly but completely describe the problem to be addressed and the project lease limit to one page. Virginia Key is a natural ba the Port of Miami and Miarni plan will be initiated to devise a waterfront development, recomrn flow to the historic Virginia Key 13 Interpretive Trail, and other island-wi existing conditions and conduct a site a draft master plan and final report, and co er island that lies within Biscayne Bay and is located proximate to downtown Miami, each. In order to preserve the island's unique natural beauty and character, a master oad map' for preserving the island. The master plan will focus on mixed -use ded improvements to the existing sewage treatment plant, restoration of tidal h Park, protection of wetlands and upland habitats along the Virginia Key improvements, FCMP funds will be used for contract services to survey lysis of Virginia Key, facilitate a community design workshop, produce a dinate project -related meetings to steer work -in -progress SUBSTITUTED b'ectives and Related Tasks and Deliverables: List project objective(s) and tasks that will ` complish each objective. Indicate the quarter in which these tasks will occur and will be delivered, Deliverables or ork products must be provided. Objective 1: Resea k, h and Data Collection (Complete by November 30, 2006) Task 1: Survey of exi'<ing conditions and Site Analysis of Virginia Key Deliverable: Site Analy Task 2: Research Historic' eferences Deliverable: Site Inventory Task 3: Review pertinent pla' . and studies Task 4: Environmental Resear Task 5: Economic Analysis Task 6: Traffic Consultant/Analyst Objective 2: Community Design Wo shop (Complete by November 30, 2006) Task 1: Local Community Meetings Task 2: Community Public Information W kshop Objective 3: Producing a Draft Master Planomplete by February 28, 2007) Task 1: Preliminary Master Plan Task 2: Final Master Plan and Implementation Str' ,-gy Deliverable: Copy of Final Master Plan —Task —at —Virginia K-ey tirbarrDesigr& Reg ulati ns Objective 4: Master Plan Documentation and Commu ' ation (Complete by April 30, 2007) Task 1: Master Plan Report Deliverable: Copy of preliminary draft of master plan report Task 2: Preparation, Printing, Copying, etc. of Master Plan Rep Deliverable: One (1) bound copy and one (1) electronic copy oft ' Master Plan Report and Virginia Key Urban Design Regulations Task 3: Mounted Renderings Task 4: Virginia Key Master Plan Website and Public Information Flyer', Community Bulletins Deliverable: Copy of public information flyers/community bulletins. Task 5: Format of Deliverables Objective 5: Master Plan Project Administration (Complete by May 31, 20 Task 1: Plan Public meetings with city and county staff Task 2: Hold public meetings SUBSTITUTED Pro'ect B no cents) and lea the FCMP funds re purchased please co be from a noncompetiti transfer of funds (within budget, is allowed without et Schedule: Type dollar amounts only in applicable categories (round to the nearest dollar; other categories blank. If your grant Agreement requires match, it must, at a minimum, equal . ested, or one hundred percent (100%). if Automated Data Processing equipment is being ete and submit Appendix 1. If the cost for any service or equipment is over $25,000 and will sole source, please also submit a Sole Source Justification Form (Appendix 2). A budget roved budget categories), in an amount not to exceed 10 percent of the FCMP total questing an official amendment. Budget Category FCMP Funds MATCH Funds 1. Salaries \ 9,200,00 2. Fringe Benefits 4,302,00 3. Travel 4. Equipment Purchases 5. Supplies \ 6.000.00 6. Contractual Services 0000.t0 11,546.00 -7.-Con`sT'ruction 8. Other Expenses 18,952.00 9, Indirect Charges FCMP Total 50,000 Match Total \\ 50,000 Total Project Cost: $100,000 SUBSTITUTED Pro'e Bud et Narrative: Describe line items for each applicable budget category shown on the budget hedule. Provide sufficient detail to show cost relationship to project activities. Complete for both FCMP a • match items, if applicable. If in -kind match is being provided by a third party, a letter from that party .nfirming the amount and type of that match must be included with this project work plan. Note: Indirect c ' is are not allowed as match. FCMP Funds: Contractual: S50,000 FCMP funds will be use owards the full cost of the environmental consultant and towards partial costs of the Landscape architecture/.nning firm which equals the requested $50,000. Match Funds: Salary: $9,200 -- 100% from (local cost share) -- This represents a contribution by the applicant of 10% of the Project Manager's tim ` The Project Manager, a Registered Landscape Architect, will provide overall direction for the Project. Th salary figure of S92,000 is based on his current salary as an Acting Planner III. Fringe Benefits: S4,302 -- 100% from -- The City's fringe rate for civilian personnel in the Project Manager's pay class is 46% of salary. Supplies: $6,000 -- Supplies include the follow 1)-- Photographic-and-architectural-reIat upp-licb including but not limited — and laminating for mounting prese `-tions and renderings of project concepts and components. 2) Reproduction of final products, reports, dra ings, and project deliverables. 3) Software towards needed for'the creation and a aintenance of project website. 4) Courier services and express mailings. 5) General Office Supplies Contractual Services: $I1,546 —from City. Various city staff along with a Project Manager, an experienced PIa er, at 10% of the project costs, will coordinate the drafting of the scope of work and assure that the projetimelines are adhered to, and that reports are completed. The remaining funds will be used for the mastplanning process. A groupof consultants has been selected through the RFQ process. A landscape ar ►itecture/planning firm at 42% will create and lead the process outlined in the project description. In additi' , an economic consultant at 14%, an environmental consultant at 10%, an urban design consultant at 12° and a traffic consultant at 12% will assist in the process. Qther Costs - S18,952 — I00% from City. Other costs include the preparation land, boundary and bathymetric surveys for water depth information required for the inventory and anatyst'\•hase of the master plan study. The preparation of surveys and gathering of information necessary for the aster plan study will be performed by private land surveyors for the City. SUBSYITUTED