HomeMy WebLinkAboutSubmittal Scope of WorkSCOPE OF WORK
1. Phase I: Development of Objectives (Complete in December of 2006):
a. Fee amount consists of the following individual components:
i. Survey Drawings $572,000 (including Expenses)
ii. Phase 1 basic services $467,000 (including expenses)
iii. Model $100,000
iv. Video Animation $80,000
v. Geotechnical Services $100,000
vi. Contingency $190,000
Total Phase 1: $1,509,000
Includes Consultants
b. Resources approximately 3,150 Man-hours plus consultants
c. Scope:
i. Needs Matrix; Participate in completing the Needs Matrix for the OB
Redevelopment;
ii. Preliminary Budgets; Develop budgets through an independent cost
consultant for each of the items in the needs matrix;
iii. Development of Options: Bundle the items from the Needs Matrix into a
series of development options;
iv. Facility Assessment; Produce a detailed assessment of the existing
facility that forms the foundation for further definition of the development
options;
v. Survey Drawings: Produce existing baseline architectural survey
drawings because none exist;
vi. Stadium Tours; Participate in a review and prepare a document that
evaluates other stadiums with respect to potential OB improvements;
vii. Presentation Documentation; prepare graphical representations of the
options developed above;
viii. Optional items:
1. Model
2. Soil testing
3. Animation
SUBMITTED INTO THE
PUBLIC RECORD FOR
LTEM_RLONJo//I64_.
l%li�D%li%,-
d. Subconsultants:
i. Structural
ii. MEP
iii. Civil Engineering
iv. Vertical Transportation
v. Acoustical, AN, Security
vi. Code Consultant
vii. Turf Consultant
viii. Landscape Architect
ix. Surveys
x. Cost Estimating
xi. Sub Total
xii. Architectural
xiii. Total
Survey Drawings Phase I
$172,000
$ 97,000
$ 0
$ 0
$ 28,000
$ 0
$ 0
$ 0
$150,000
$ 0
$447,000
$105,000
$552,000
2. Phase II, Evaluation of Objectives (Complete
a. Fee Amount:$ 341,000 including consultants
b. Resources: Approximately 2,250 man-hours
c. Scope
i. Analysis and evaluation of alternatives;
ii. Space Program;
iii. One -line programmatic documents;
d. Subconsultants:
i. Structural
ii. MEP
iii. Civil Engineering
iv. Vertical Transportation
v. Acoustical, AN, Security
vi. Code Consultant
vii. Cost Estimating
viii. Sub Total
ix. Architectural
x. Total
Phase II
$ 85,000
$ 25,000
$ 35,000
$ 4,000
$ 28,000
$ 4,000
$ 20,000
$201,000
$100,000
$301,000
$ 60,000
$ 51,000
$ 97,000
$ 0
$ 10,000
$ 26,000
$ 7,000
$ 8,000
$ 0
$ 18,000
$277,000
$150,000
$427,000
in February of 2007)
plus consultants
Subs rftj Into the public'.
record in connection with
item an / Q - lyb p
Priscilla A. Thompson
City Cleric
3. Critical Early components of Phase III
a. Fee Amount:$ 2,650,000 including consultants
b. Resources: Approximately 11,000 man-hours plus consultants
c. Scope
i. Early Critical Construction Design documents:
1. MEP Upgrades
2. ADA Upgrades from DOJ settlement
3. Structural Repairs
4. Critical code compliance modifications
ii. Schematic Design Studies and Schematic Narrative
d. Subconsultants:
i. Structural
ii. MEP
iii. Civil Engineering
iv. Vertical Transportation
v. Acoustical, AN, Security
vi. Code Consultant
vii. Cost Estimating
4. Provisions to add Design Documents and Construction Administration
a. Provisions made to add the balance of design based on pre -negotiated
rates
b. Sliding scale of fees developed to realize economies of scale should the
construction cost exceed $120 M or $150M