Abstract Description: Briefly but completely describe the problem to be addressed and the project solution to
the problem. Please limit to one page.
Watson Island is a spoil island located in Biscayne Bay, Miami. The Island's Master Development Plan and the
City of Miami's comprehensive plan reserve the majority of Watson Island for recreational land uses. Towards this
goal, the City proposes to build a Baywalk on the island to increase public use and implement coastal protection
goals. The Baywalk will include an innovative combination of a functional retaining wall, which will build-up and
level the upland slope, combined with a seating area for visitors along the Baywalk. The City consulted with
permitting agency staff and was advised to design the project to be constructed landward of wetlands and the mean
high water line in order to avoid environmental impacts and regulatory concerns. Based on the results of subsequent
detailed site surveys and regulatory consultation, the City will incorporate walkways, bridges and overlooks into the
project design to avoid and protect shoreline wetland vegetation.
Grant funds will be used for the following tasks: site clearance; project design and regulatory consultation; obtain
regulatory approvals; and complete the permitted construction plans.
THIS DOCUMENT IS A SUBSTITUTION TO
ORIGINAL BACKUP. ORIGINAL CAN BE
SEEN AT END OF THIS DOCUMENT
Project Objectives and Related Tasks and Deliverables: List project objec ive(s) and tasks that will
accomplish each objective. Indicate the quarter in which these tasks will occur and will be ivered. Deliverables
or work products must be listed.
Objective 1: Pre -construction Activities
Task 1: Site Clearance
Task 2: Design
Deliverable: Conceptual Design
Task 3: Preliminary Approvals & Comments
Deliverable: Review Comments
Task 4: Design
Task 5: Regulatory Approvals/Permitting
Deliverable: Permitted Construction Drawings
THIS DOCUMENT IS A SUBSTITUTION TO
ORIGINAL BACKUP. ORIGINAL CAN BE
SEEN AT END OF THIS DOCUMENT
Project Budget Schedule: Type dollar amounts only in applicable categories (round to the nearest dollar; no
cents) and leave other categories blank. If your grant Agreement requires match, it must equal the FCMP funds -,
requested, or one hundred percent (100%). A budget transfer of funds (within approved budget categories), in an
amount not to exceed 10 percent of the FCMP total budget, is allowed without requesting an official amendment.
Budget Category FCMP Funds MATCH Funds
1. Salaries
2. Fringe Benefits
3. Travel
4. Equipment Purchases
5. Supplies
6. Contractual Services 50,000.00 50,000.00
7. Construction
8. Other Expenses
9. Indirect Charges
FCMP Total 50,000.00
Match Total 50,000.00
Total Project Cost: $100,000.00
THIS DOCUMENT IS A SUBSTITUTION TO
ORIGINAL BACKUP. ORIGINAL CAN BE
SEEN AT END OF THIS DOCUMENT
Project Budget Narrative: Describe line items for each applicable budget category shown on the budget
schedule. Provide sufficient detail to show cost relationship to project activities. Complete for both FCMP and
match items, if applicable. If in -kind match is being provided by a third party, a letter from that party confirming
the amount and type of that match must be included with this project work plan. Note: Indirect costs are not
allowed as match.
FCMP Funds will be used for Contractual Services in the amount of $50,000 for the design and permitting of the
Baywalk project.
Match Funds
The city will provide match in the amount of $50,000.00 also in contractual services for architecture and engineering
services.
THIS DOCUMENT IS A SUBSTITUTION TO
ORIGINAL BACKUP. ORIGINAL CAN BE
SEEN AT END OF THIS DOCUMENT
Scope of Work information
Abstract Descrintioq: icily but completely describe the problem to be addressed and the project solution to
the problem. Please limit to o •age.
Watson island is a spoil island local . in Biscayne Bay, Miami. The Island's Master Development Plan and the Ciry
of Miami's comprehensive plan resery a rnajonry of Watson Island for recreational land uses. Towards ibis goal,
the City proposes to build a Baywalk on t island to increase public use and implement coastal protection goals.
The Baywslk will include an innovative co nation of a.funciional retaining wall, which will build-up and level the
upland slope, combined with a seating area far 'snots slang the Baywalk, The Ciry has consulted with pernurting
agency staff and expects the permining process to e completed prior to onset of the grant award in July 2tJt)s. Aa a
result of the consultation, the Ciry was advised to de ' n the project to be constructed landward of wetlands and the
mean high water line in order to avoid environmental i •acts and regulatory concerns. Otherwise, if the .
construction would impact wetlands, it would require an ' vironmentaI Resource Permit and mitigation. Also,
construction waterward of the mean high water tine would tr : cr submerged state lands issues and require a lease
from the Board of Trustees, which would likely be denied.
SUBSTITUTED
DEPAsreement No, CZ613, Artarbment A, Page 2 of
DEP 55.236 (04/05)
Pr eel 'eclives a • d Re sled Tas 's and Dellvera • les: List project objecrivc(s) and tasks that will
accomplish e h objcctrve, Indicate the quarter In which these tasks will occur and will be delivered, Deliverables
or work proiiu s must be listed.
ObJeetive 1: Pre-cstruction Activities
Task I: Site Clearance
Task 1: Design
Deliverable: Conceptual D gn
Task 3: Preliminary Approve & Comments
Deliverable: Review ComMenis
Task 4: Design
Task 5: Regulatory Approvals/Pe ing
Deliverable; Permitted Construction D wings
Objective 2: Contractor
Task I: Bid document preparation, connect() •election
Objective 3: Construction
Task 1: Start ofConstruction
Deliverable: Stan of Retaining Wall Construction pic
Task2: Construction
Task 3: Final lnspect:ori/Punch List Items
SU BSTITUT
DEP Agreement No. CZ61). Attachment A, Page 3 of S
DEP SS•336 (0410S)
Pro eCt Bud 'et S edVie: Type dollar amounts only in applicable categories (round to the nearest dollar; no
cents) and leave other c • gories blank, if your grant Agreement requires match, it must equal the FCMP funds
requested, or one hundred teem (100%). A budget transfer of funds (within approved budget categories), in an
amount not to exceed 10 perc t of the FCMP total budget, is allowed without requesting an official amendment.
• 13udee(Sarezo►V , FCMP Funds MATCH Funds
t. Salaries
2. Fringe Benefits
3. Travel
4, Equipment Purchases
5. Supplies
6. Contractual Services + + a + e r 50.000.00
7. Construction
S. Other Expenses
9. Indirect Charges
FCMP Tot at ,50.000.00
Match Total
Total Protect Cost; S 100,000.00
DEP Agreement No, C2+513, Atrachment A, ('age a of 5
DEP 5S•2i (BOOS)
P o ect de
schedule. Pt • ide
match items, if a
amount and type o
as match,
Nar t ve; Describe line items for each applicable budget category shown on the budget
sufficient detail to show cost relationship ro project activities. Complete for both PCMP and
lic able. If in•kind match is being provided by a Iliad parry, a tenet from that parry confirming the
at match must be included with this project work plan. Note; indirect costs are not allowed
FCMP Fyndt will be used f• onrracrual Services
S.50,000 concrete retaining writ onstructton & materials
Match Funds
The ciry will provide match in the amo
Preparation, Daywalk paving, site drainag
of $50,000.0D also in contractual services for Earthwork & Site
rchitecrure and engineering services.