Loading...
HomeMy WebLinkAboutBid Tabulation SheetCP PROJECT: 352216 Citywide Local Drainage Projects FY 02-06 APproputed Amount 114,798,06586 Bitlumber B-30110 Br30110 8.30156 8.30156 630226 8-30228 B-30354 Descriasom Other Costs/Expenses Riverview Stormwater Pump Station Upgrades (one of four projects that comprise B-5650) (81dg) Riverview Stnrmwater Pump Station Upgrades (one diver projects that comprise 6-5650) (Mg) Storm Sewer Equipment Acquisibon One Diesel Tandem Truck with a Zrm-liocer, nine (9) cubic yard concrete nixing unit ($184,797.00) NW 19th Terrace Swale Restoration NW 1981 Terrace Swale Restaratkm NW 47errace Storm Water Cleaning B-30354 13-30354 NW 4 Terrace Storm Water Cleaning -Professional Services to the implementation of a Job Order =trading (JOC) system. NW 4 Terrace Storm Water Clearing 13-30262 jCitywide Storm Sewer Repair B-30517 8-31207 B-40620 B-40656 8-4066s 6-40668 8-40696 MUSA Island Drainage lry,rrmarerrht NE 40th Street Allapattah CD NW 10 Ave. Improvements Road Rehabilitalon Advertising Advertising NW 34th Avenue Road Improvements Amount Allocated 388,702A4 54,386.00 197,795.00 1,500,000A0 109,331.47 290,668.53 Contract Amount 1.62, 612.04 40,80034 600,000.00 460,000.00 81,585.00 100,000.00 317,681.88 278.10 40110 292.000.00 Payments to Date 388,702.44 388.702.44 197,795.00 290.66853 0.00 612.04 40,800.34 81,585.00 100,000153 317,681 88 278.10 40120 292,000.00 290,666.34 0.00 612.04 40,600.34 3,61429 100.000.00 317,631.88 278.10 40120 292,000.00 Contract Balance 9.00 197,79500 0.00 2.19, 0.00 0.00 0.00 77,970.71 8/312006 483 PM 0_00 0.00 0.00 0.00 Comments going to CC on 4-22-04; contract i $197,795 plus 154,366 in expenses for a total cast of S252,181 signed req on 1-11-05 authorized by Res #040258 dated 422104 signed agenda item on 6f30106 dated 62006 for CC 804 7127/06 signed PAF 11/28/05; spfit with $135,260 in CIP 311711 and $294,000.00 in ClP 341330 fora Local d $829,2613.00 10-14-05; per note from Mary use Ragami impact leas signed revised PAF 10/18435 signed req on 11/30/05: authorized by Res 404-0515 dated 7/29104_ City d â–ºiami Beach Piggyback Estahfishmerd of a Job Order contrading (JOC) system contract #49-00101. Ref MB-FH Paschen contract ant S40,802.78 signed req on 1120/05; aumoized by Res #04-0516 dated 729/04 & Res 804-0699 dated 10/13iO4. City of Miami Beach Piggyback Job Order contracting (JOC) contract #14-0314. signed PAF 4/19u06; CmtractorNendor Professional General Contractors, Inc Commercial vehicles of South Florida I Weeldey Asphalt Paving signed PAF 7/18/06 signed revised PAF on 7-22-05; spa funded with $520,397 in G1P 341330 and with $1,803,115 in CIP 341157 fora total of 52,405.097_ signed reg8-1045; spithatdedwilh $1,483.840.00 if CIP 341157 and with 5298,12282 in CIP 341330 for a total of $1,863,547,02_ Broward County Piggyback Contract #H-9- 03 242-81 Ref Res#04-0745 dated 11/18/04 Additional funds identified from 341321 - $456,000 for total available funds of $556,000 - Res 03-622 dated 522/03. Inv 006504874-001 lnv4218571 The Gordian Group FHP Tecrodsc Weekley Asphalt Paving Italic Engineering Corp MEF Construction 16ani Tunes Mario lay Americas ResrlP.O. P052075 P052767 P060914 P060908 P055874 P235492 P041875 JE31921