Loading...
HomeMy WebLinkAboutConcurrency ReportProposal No 06-11 Date: 5/03/06 CONCLIRRENCY MANAGEMENT ANALYSIS CITY OF MIAMI PLANNING DEPARTMENT IMPACT OF PROPOSED AMENDMENT TO LAND USE MAP WITHIN A TRANSPORTATION CORRIDOR AMENDMENT INFORMATION CONCURRENCY ANALYSIS Applicant: Ines Marrero-Prieques, Esq on behalf of 3 BroAmigo, LLC Address: 800, 810, 816 & 826 SW 7th Street and 720 SW 8th Avenue Boundary Streets: North: SW 7th Street East: SW 8th Avenue South: n/a West: n/a Proposed Change: From: Meduim Density Multifamily Residential To: Restricted Commercial Existing Designation, Maximum Land Use Intensity Residential 0.52 acres @ 65 DU/acre 34 DU's Peak Hour Person -Trip Generation, Residential 27 Other sq.ft. @ FAR 0 sq.ft. Peak Hour Person -Trip Generation, Other Proposed Designation, Maximum Land Use Intensity Residential 0.52 acres @ 150 DU/acre 78 DU's Peak Hour Person -Trip Generation, Residential 39 Other sq.ft. @ FAR 0 sq.ft. Peak Hour Person -Trip Generation, Other 0 Net Increment With Proposed Change: Population 114 Dwelling Units 44 Peak Hour Person -Trips 12 Planning District Little Havana County Wastewater Collection Zone 309 Drainage Subcatchment Basin J1 Solid Waste Collection Route 20 Transportation Corridor Name SW 8th Street RECREATION AND OPEN SPACE Population Increment, Residents 114 Space Requirement, acres 0.15 Excess Capacity Before Change 182.80 Excess Capacity After Change 182.65 Concurrency Checkoff OK POTABLE WATER TRANSMISSION Population Increment, Residents 114 Transmission Requirement, gpd 25,445 Excess Capacity Before Change >2% above demand Excess Capacity After Change >2% above demand Concurrency Checkoff OK SANITARY SEWER TRANSMISSION Population Increment, Residents 114 Transmission Requirement, gpd 21,015 Excess Capacity Before Change See Note 1. Excess Capacity After Change See Note 1. Concurrency Checkoff WASA Permit Required STORM SEWER CAPACITY Exfiltration System Before Change On -site Exfiltration System After Change On -site Concurrency Checkoff OK SOLID WASTE COLLECTION Population Increment, Residents 114 Solid Waste Generation, tons/year 145 Excess Capacity Before Change 800 Excess Capacity After Change 655 Concurrency Checkoff OK RELEVANT MCNP GOALS, OBJECTIVES, AND POLICIES Land Use Policy 1.1.1 CIE Policy 1.2.3 TRAFFIC CIRCULATION Population Increment, Residents 114 Peak -Hour Person -Trip Generation 12 LOS Before Change D LOS After Change D Concurrency Checkoff OK NOTES 1. Permit for sanitary sewer connection must be issued by Metro -Dade Water and Sewer Authority Department (WASA). Excess capacity, if any, is currently not known CM 1 IN 03/13/90 ASSUMPTIONS AND COMMENTS Population increment is assumed to be all new residents. Peak -period trip generation is based on ITE Trip Generation, 5th Edition at 1.4 ppv average occupancy for private passenger vehicles. Transportation Corridor capacities and LOS are from Table PT-2(R1), Transportation Corridors report. Potable water and wastewater transmission capacities are in accordance with Metro -Dade County stated capacities and are assumed correct. Service connections to water and sewer mains are assumed to be of adequate size; if not, new connections are to be installed at owner's expense. Recreation/Open Space acreage requirements are assumed with proposed change made.