Loading...
HomeMy WebLinkAboutConcurrency Report (Revised)Proposal No 06-03 rev Date: 5/11/06 CONCURRENCY MANAGEMENT ANALYSIS CITY OF MIAMI PLANNING DEPARTMENT IMPACT OF PROPOSED AMENDMENT TO LAND USE MAP WITHIN A TRANSPORTATION CORRIDOR AMENDMENT INFORMATION CONCURRENCY ANALYSIS Applicant, Lucia A. Dougherty, Esq on behalf of Address: 100, 1012 & 1022 NW 1st Avenue Boundary Streets: North: n/a East: NW 1st Avenue South: NW 10th Street West: n/a Proposed Change: From: High Density Multifamily Residential To: Restricted Commercial Existing Designation, Maximum Land Use Intensity Residential 0.44 acres @ 300 DU/acre 132 DU's Peak Hour Person -Trip Generation, Residential 66 Other sq.ft. @ FAR 0 sq.ft. Peak Hour Person -Trip Generation, Other 0 Proposed Designation, Maximum Land Use Intensity Residential 0.44 acres @ 300 DU/acre 132 DU's Peak Hour Person -Trip Generation, Residential 66 Other sq.ft. @ FAR 0 sq.ft. Peak Hour Person -Trip Generation, Other 0 Net Increment With Proposed Change: Population 0 Dwelling Units 0 Peak Hour Person -Trips 0 Planning District Overtown County Wastewater Collection Zone 308 Drainage Subcatchment Basin K1 Solid Waste Collection Route 16 Transportation Corridor Name Miami Ave RECREATION AND OPEN SPACE Population Increment, Residents 0 Space Requirement, acres 0.00 Excess Capacity Before Change 182.80 Excess Capacity After Change 182.80 Concurrency Checkoff OK POTABLE WATER TRANSMISSION Population Increment, Residents 0 Transmission Requirement, gpd 0 Excess Capacity Before Change >2% above demand Excess Capacity After Change >2% above demand Concurrency Checkoff OK SANITARY SEWER TRANSMISSION Population Increment, Residents 0 Transmission Requirement, gpd 0 Excess Capacity Before Change See Note 1. Excess Capacity After Change See Note 1. Concurrency Checkoff WASA Permit Required STORM SEWER CAPACITY Exfiltration System Before Change On -site Exfiltration System After Change On -site Concurrency Checkoff OK SOLID WASTE COLLECTION Population Increment, Residents 0 Solid Waste Generation, tons/year 0 Excess Capacity Before Change 800 Excess Capacity After Change 800 Concurrency Checkoff OK RELEVANT MCNP GOALS, OBJECTIVES, AND POLICIES Land Use Policy 1.1.1 CIE Policy 1.2.3 TRAFFIC CIRCULATION Population Increment, Residents 0 Peak -Hour Person -Trip Generation 0 LOS Before Change B LOS After Change B Concurrency Checkoff OK NOTES 1. Permit for sanitary sewer connection must be issued by Metro -Dade Water and Sewer Authority Department (WASA). Excess capacity, if any, is currently not known CM 1 IN mil ASSUMPTIONS AND COMMENTS Population increment is assumed to be all new residents. Peak -period trip generation is based on ITE Trip Generation, Sth Edition at 1.4 ppv average occupancy for private passenger vehicles. Transportation Corridor capacities and LOS are from Table PT-2(R1), Transportation Corridors report. Potable water and wastewater transmission capacities are in accordance with Metro -Dade County stated capacities and are assumed correct. Service connections to water and sewer mains are assumed to be of adequate size; if not, new connections are to be installed at owner's expense. Recreation/Open Space acreage requirements are assumed with proposed change made.