Loading...
HomeMy WebLinkAboutConcurrency ReportProposal No 06-19 Date: 5/24/06 CONCURRENCY MANAGEMENT ANALYSIS CITY OF MIAMI PLANNING DEPARTMENT IMPACT OF PROPOSED AMENDMENT TO LAND USE MAP WITHIN A TRANSPORTATION CORRIDOR AMENDMENT INFORMATION Applicant Simon Ferro, Esq, on behalf of A+ Mini Storage Airport East, LLC Address: 1701, 1801, 1828 & 1851 Delaware Parkway Boundary Streets: North: n/a East: n/a South: n/a West: Delaware Parkway Proposed Change: From: General Commercial, Single Family Residential To: Restricted Commercial Existing Designation, Maximum Land Use Intensity Residential 9.32 acres @ 150 DU/acre 1,398 DU's Peak Hour Person -Trip Generation, Residential 701 Other sq.ft. @ FAR 0 sq.ft. Peak Hour Person -Trip Generation, Other Proposed Designation, Maximum Land Use Intensity Residential 9.32 acres @ 150 DU/acre Peak Hour Person -Trip Generation, Residential Other sq.ft. @ FAR Peak Hour Person -Trip Generation, Other Net Increment With Proposed Change: Population Dwelling Units Peak Hour Person -Trips Planning District County Wastewater Collection Zone Drainage Subcatchment Basin Solid Waste Collection Route Transportation Corridor Name 1,398 DU's 701 0 sq.ft, 0 0 0 0 Allapattah 315 J1 25 NW 20th Street CONCURRENCY ANALYSIS RECREATION AND OPEN SPACE Population Increment, Residents Space Requirement, acres Excess Capacity Before Change Excess Capacity After Change iCE Concurrency Checkoff 0 0.00 182.80 182.80 OK POTABLE WATER TRANSMISSION Population Increment, Residents Transmission Requirement, gpd Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff 0 >2% above demand >2% above demand OK SANITARY SEWER TRANSMISSION Population Increment, Residents Transmission Requirement, gpd Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff 0 See Note 1, See Note 1. WASA Permit Required RELEVANT MCNP GOALS, OBJECTIVES, AND POLICIES Land Use Policy 1.1.1 CIE Policy 1.2.3 NOTES 1. Permit for sanitary sewer connection must be issued by Metro -Dade Water and Sewer Authority Department (WASA). Excess capacity, if any, is currently not known C IN 03/13/90 STORM SEWER CAPACITY Exfiltration System Before Change Exfiltration System After Change Concurrency Checkoff SOLID WASTE COLLECTION Population Increment, Residents Solid Waste Generation, tons/year Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff TRAFFIC CIRCULATION Population Increment, Residents Peak -Hour Person -Trip Generation LOS Before Change LOS After Change Concurrency Checkoff On -site On -site OK 0 800 800 OK 0 B B OK ASSUMPTIONS AND COMMENTS Population increment is assumed to be all new residents. Peak -period trip generation is based on ITE Trip Generation, 5th Edition at 1.4 ppv average occupancy for private passenger vehicles.. Transportation Corridor capacities and LOS are from Table PT-2(R1), Transportation Corridors report. Potable water and wastewater transmission capacities are in accordance with Metro -Dade County stated capacities and are assumed correct. Service connections to water and sewer mains are assumed to be of adequate size; if not, new connections are to be installed at owners expense. Recreation/Open Space acreage requirements are assumed with proposed change made.