Loading...
HomeMy WebLinkAboutAviation Comments with Map (10.12.05)K8|AMI-DA0ECOUN7'�FLORIDA (}c\ohcr 12.2005 Mr. Kevin VVmiRzrd City nfMiami 444 8�VV. 2"d Ave- 4"' Floor Miami, Florida 33 130 AVIATION DEPARTMENT P.O. BOX 592075 M|AM|.FLOR|DA 33159'2075 (305)876'7000 RE: Height Analysis for the MiamiRiver Rapids Project, in Miami, FL Dear Mr, VVa\fhnj: The K41umi-Dude Aviation Department (MDAI)) has reviewed your Large Scale Development Submittal dated June 20, 2005 for u height analysis for the above referenced project, This nuhmi\\u\ actually consists nf9different buildings according to Ounic|u Gomez from the architects (Behar Font and Partners) and noted as follows: (Heights listed as Above Ground Level (AGL) Building l 1773 ft Building 143,83 11 Building 171.83 h Building 2: 149.4 fl Building 5� 17}8]fl Building 8: 1493 fl Building 17183 fl Building 14183) ft Building Ol96O Our review finds that Building numbers 2. 4` 0. and 8 conform to the Miami -Dade County Height Zoning Ordinance, However, building numbers 1,3,5, 7, and 9do omt conform to the Miami -Dade County Height Zoning Ordinance, These Buildings located in MIA's horizontal surface exceed the maximum height of)00 fl A.M8L (Above Men Sea Level). Refer to the attached drawing depicting the height zoning surfaces in relation to the rellerenced project, This height determination inunestimate iosuujono preliminary nradvisory basis. Before proceeding with design, any proposed construction atthis location oxcceding95 ft will be required to 0r with the FAA by using fbrm 7400'1 'Notice of Proposed Construction Alteration for Determination of l{nuvvn Hazards', In oddhion, any construction cranes for this project exceeding 95 Q must be O|cd by the construction contractor using the uumc farm. Thus, for any structure or crane at this |ncu1{on exceeding 95 ft. F}\/\ Form 7460'1 must he filed. The 0)nn is nvuUuh|e through this office or through the F&& *ohdtr: o.f;aO�� pd� This for should be mui|od to: Federal Aviation Administration, Air Traffic &irspa�o Brunch - &SW'520, 2601 &1oachono Blvd, F}. VVorth, T)< 76)]7'0520 Alternatively, the developer may "e-file" online at http,sj�Qiq,,�Ag MNAMN INTERNATIONAL AIRPORT Mr. Kevin Wu 5znd October l2`2O05 9ugo2 Bused on the uhnwe, MD&[) would not nhiut to o proposed structure height that con[bnnsk)the &1\umi'DndrCounty Height Zoning Ordinance uslong as: l) FAA determines that the construction of building at the above mentioned hciub\ will not diminish nruMec the safety, cfOcicncy orcapacity o[the Miami International Airport inany vvoy�and 2> F&/\ issues u"Determination o[NoHazard" for this project and location, and 3) An interested party does not file u"petition for rcvicv/' toFAA's aeronautical study that has yet to he completed for this project and location, ^ P|cwsn note that tile airspace review process is governed by two different regulations: thc Miami -Dade County Height Zoning Ordinances and Federal Regulation Title 14Pmrt 77, Neither MZ}Al) nor any MDAD stoOFhos the power or authority to enforce the Couoty'n zoning provisions ortile FAA requirements. Pursuant to section 33'339, the Covnty'x Department of' Planning & Zoning (y&Z) administers the County's height zoning provisions (Section 33-]39) which states that ^uU applications for permits made to appropriate municipal Building and Zoning Departments or agencies for all constroction., shall be approved by the [Miami -Dade Department of Planning and Zoning] Director and the Building Offliciu( or by their duly authorized representatives prior to issuance of thopermiL^ The F/\/\ has its np/n airspace evaluation rcqoirccnnn\s, as well as the right to permit or not permit construction of facility oruse ofacrane huocd on the particular facts thcm presented before the FAA. Only P&�Z orthe applicable municipal building official can make the final determination as to whether the County`s zoning rcqvircnncn$ and height limitations an: met, and only FAA can make the determination astowhether F&6 building and height requirements are met, This determination is hoscd` in pm1, on the description provided to us by you, which includes specific building locations and heights. Any changes In building locations/layouts or heights will void this determination. Any future construction or n|tcro ion` including an increase to heights requires separate notice to the FAA and the Miami -Dade Aviation Department, Mr. Kevin Walford October 12, 2005 Page 3 Should you have any questions in obtaining a.nci/or filling out FAA form 7460-1 or if 1 can be of any further assistance, please feel free to contact me at 305-876-8080. os, R.A. C ie o Aviation Planning 1R/DV/cf Attachment cc: S. Harman J. Bunting Al Torres, .P&Z Kevin Walford, City of Miami Roberto Lavernia, City of Miami Earl Newalu, FAA File Airspace aoi 9w 1,10 IiIII,III�' IIIII ,r5101) �IIIIIIIIWII Height Analysis for Miami River Rapids Project Ir 1 PI 0,r 155051 Of Vito Y 9CdC r Ib<;, r r , l'<r ryh1 .r r1 0,15555 a, rn pp/ Oyu„ I/ PN Plr If¢<,u,,nr a 1I pp, ✓510r15155, dinRd l. i t11 ,I /,,v I NN I I 51115 111 , 11,51 Y, I P A) ,I I (I ,10 , 11155r) 551511555 i i, ICI ,r,1 I d,<f 1111111111111111111111 AVIATION PLANIW«rkt ui;17;6w_. October f3, 20