HomeMy WebLinkAboutTechnical SpecificationsMiami -Dade County Ma rio.: 49U i-1/uo-u i tt Section 3 — Technical Specifications PLAYGROUND AND PARK EQUIPMENT 3.1 SCOPE The purpose and intent of this invitation to bid is to: • Establish a list of pre -qualified vendors who will be invited to participate in Spot Market purchases when need arises. • -Secure a firm "" fixed "percentage "discount' from 'manufacturers price list for the purchase and delivery of PLAYGROUND & PARK EQUIPMENT, • Secure a firm fixed percentage of COST (after discount) for installation of playground equipment, and to establish a fixed price for the installation of playground infrastructure to include resilient surfacing materials, concrete slabs, curbing and trap sand#70. 3.2 THE WORK - INSTALLATION A. Prior to mobilization Contractor shall attend a Pre -Construction meeting at the site. Contractor shall provide to the Construction Manager, at this meeting, a complete set of sealed engineering drawings for all relevant components. B. Contractor shall submit, in writing, all project -related questions andlor comments to Construction Manager for further distribution. C. Contractor shall ensure all work is installed straight, level, plumb and in a workmanlike manner. D. Contractor shall verify and be responsible for the accuracy of all field measurements. E. Contractor shall be responsible for restoration of the site to its original condition to include resodding of the area affected by their work with sod which is of the same variety and quality as the surrounding sod. Where no sod exists prior to installation, the Contractor shall restore grade to a level consistent with the surrounding grade. F. Contractor shall be responsible for the layout and location of all equipment and infrastructure included in the contract.. Park and Recreation Department surveyors will locate and mark underground utilities in the immediate area of the construction, but it is the responsibility of the Contractor to call this Department and to call NoCuts prior to commencement of construction. The Park and Recreation Department Landscape Architect will inspect the project when the layout and location has been completed by the Contractor. A 24---hour advance notice will be required for this inspection. NOTE: See Attachments 1, 2, 3 and 4. lb Revised 05-04 Miami -Dade County Bid No.: Section 3 — Technical Specifications G. Contractor shall be responsible for installing any infrastructure included in the contract according to the plans and specifications provided by the Park and Recreation Department. These plans and specifications are included as part of the contract. H. An English—speaking supervisor/representative must be on the work site at all times; who shall be thoroughly `knowledgeable- of allplans, ..specifications •.and other - contract documents and has the authority to act in the Contractor's behalf. I. Contractor shall be responsible for scheduling all required inspections. 17