Section 3 — Technical Specifications
PLAYGROUND AND PARK EQUIPMENT
3.1 SCOPE
The purpose and intent of this invitation to bid is to:
• Establish a list of pre -qualified vendors who will be invited to participate in Spot
Market purchases when need arises.
• -Secure a firm "" fixed "percentage "discount' from 'manufacturers price list for the
purchase and delivery of PLAYGROUND & PARK EQUIPMENT,
• Secure a firm fixed percentage of COST (after discount) for installation of
playground equipment, and to establish a fixed price for the installation of playground
infrastructure to include resilient surfacing materials, concrete slabs, curbing and trap
sand#70.
3.2 THE WORK - INSTALLATION
A. Prior to mobilization Contractor shall attend a Pre -Construction meeting at the site.
Contractor shall provide to the Construction Manager, at this meeting, a complete
set of sealed engineering drawings for all relevant components.
B. Contractor shall submit, in writing, all project -related questions andlor comments to
Construction Manager for further distribution.
C. Contractor shall ensure all work is installed straight, level, plumb and in a
workmanlike manner.
D. Contractor shall verify and be responsible for the accuracy of all field
measurements.
E. Contractor shall be responsible for restoration of the site to its original condition to
include resodding of the area affected by their work with sod which is of the same
variety and quality as the surrounding sod. Where no sod exists prior to installation,
the Contractor shall restore grade to a level consistent with the surrounding grade.
F. Contractor shall be responsible for the layout and location of all equipment and
infrastructure included in the contract.. Park and Recreation Department surveyors
will locate and mark underground utilities in the immediate area of the construction,
but it is the responsibility of the Contractor to call this Department and to call
NoCuts prior to commencement of construction. The Park and Recreation
Department Landscape Architect will inspect the project when the layout and
location has been completed by the Contractor. A 24---hour advance notice will be
required for this inspection. NOTE: See Attachments 1, 2, 3 and 4.
lb
Revised 05-04
Miami -Dade County Bid No.:
Section 3 — Technical Specifications
G. Contractor shall be responsible for installing any infrastructure included in the
contract according to the plans and specifications provided by the Park and
Recreation Department. These plans and specifications are included as part of the
contract.
H. An English—speaking supervisor/representative must be on the work site at all
times; who shall be thoroughly `knowledgeable- of allplans, ..specifications •.and other -
contract documents and has the authority to act in the Contractor's behalf.
I. Contractor shall be responsible for scheduling all required inspections.