HomeMy WebLinkAboutTAB O - Site Utility StudyJan 20 08 11:10a VSN ENGINEERING Ma Mommmie mMmMmm MM MMIMM—A ME MM ,�� Ma ITO ffi 2 a 6 661 6Uo c Since 1989 3055514542 CM. LAND Doirete ion- 7RAFFIc AND TRANSPORTATION CITY SQUARE MULTI USE DEVELOPMENT SITE UTILITY STUDY January2006 8550 W. FLAGLER STREET, SUITE 113, MIAMI, FLORIDA 33144 TEL: (305) 551-6257 • FAX: (305) 551-4542 E-mail: vanevaneng.com p. 2 Jan 20 06 11:11a VSN ENGINEERING 3055514542 mom 111111111•Millimi Mum Allitimmalin Mom Nr-11161MONIWI 111111111101611•1=11111 =MIN MMOIM=M ME 111 c Since 1989 QML LAND DEVELOPAENT TRAFFIC AND TRAWSPORTMION TABLE OF CONTENTS 1. General 2. Storm Drainage System 3. Water Distribution System 4. Sewer Collection System 5. Solid Waste Generation Page 2 3 5 6 7 EXHIBITS: "A" Location Map 10 "B" Storm Drainage Well Calculations 11 "C" MD-WASD Atlas (Sewer) 16 MD_WASD Atlas (Water) 17 Proposed Water Use Calculations 18 DERM Pump Station Monthly Report 19 "D" Solid Waste Generation Calculations 21 P • 3 Jan 20 08 11:lla VSN ENGINEERING Nan 1111111 MOM r MEMO Mill11/11a ✓ riw . O illeMIMMM N 1. General 2 a a 3055514542 CIVIL LAND DEVELOP$ENT TAFRC AND TRANSPORTATION Surce 1989 CITY SQUARE- MULTI USE DEVELOPMENT SITE UTILITY STUDY A. Project Location and size: The proposed project consists of a Multi -use Facility to be constructed of an approximately 6.50 acre site in downtown Miami. The project limits are: to the east Herald Plaza (NE Bayshore Place) to the NE 13th Street to the west North Bayshore Drive to the north NE 15th Street The property being in Section 31, Township 53 South, Range 42 East Miami - Dade County, Florida. B. Existing Conditions: This property in its existing conditions is being used as an existing 25,427 sf Commercial -Mixed Use Building. This building will be demolished to allow for the construction of the new project. C. The proposed project build -out will be as follows: Condominium Apartments 985 Units Retail 542,728 sf Restaurants (25,000 sf) 750 seats p.4 2 Jan 20 06 11:11a VSN ENGINEERING isi Erik assoweakomot rnr111rr+ Nr11•wr0s r� 6 Since 1989 2. Storm Drainage System A. Existing Storm Drainage System: 3055514542 p. 5 CML LAND DEVE1DPIENT TRAFFIC AND TRANSPORTATION Roadway storm drainage systems presently exist along the streets surrounding the proposed project. These systems are owned and maintained by the City of Miami. The site, in its existing or proposed conditions, does not or will not contribute any significant amount of storm water run-off into the Public Roadway System. No significant improvements to the existing Roadway Drainage System are expected as a result of this project. B. Proposed On -Site Storm Drainage System: The proposed storm drainage system to serve this project will be designed to fully contain on -site the storm water run-off and to meet the Miami - Dade County Department of Environmental Resources Management (DERM) requirements. This will be accomplished by means of deep drainage wells. No off- site run-off will be generated from this project. The total contributing site area and 30% of the building wall area exposed to the rain will be included in the Disposal Well System design calculations. An impervious coefficient of 0.95 will be used for the purpose of this study. Based on information provided by an experienced well drilling company for other projects in the vicinity, an approximate well discharge rate 750 gpm per foot of head can be expected. Storm water from roofs, internal driveways, walkways and parking areas will be conveyed by means of a collection system to sediment tanks sized to meet the detention volume requirements prior to discharging into the Well System. Additional Water Quality pre-treatment and Pollution Retardant Baffles at the catch basins will be provided at areas subject to vehicle traffic. 3 Jan 20 06 11:11a VSN ENGINEERING rrSOrmisrw - SOMMO ., =111MIMOMMI MO M=MMIN-r .�. ffi II9 1 1 6 Since 1989 3055514542 CIVIL LAND DEVELOPMENT TRAMM AND TRANB1 ORTAT N C. Required number of Wells: The proposed wells will be designed to maintain the site dry during the 5 year-24 hour storm, to keep flooding below the perimeter grades during the 25 year-3 day storm and to keep flooding below the minimum floor elevation during the 100 year- 3 day storm. Based on the attached calculations, a total of 8 — 24" diameter storm drainage wells are required to provide full on -site retention for this project depending on the actual yields obtained during the well drilling operations. For Well Disposal System calculations refer to attached Exhibit "S" p.6 4 Jan 20 06 I1:12a VSN ENGINEERING a 1 >!o SIC it ifl c Since 1989 3. Water Distribution System A. Existing Water System Facilities: 3055514542 CML LAND DEVEI.OPMENT TRAFFIC AND TRANSPORIATOON Miami -Dade Water & Sewer Department (MD-WASD) owns and operates the following domestic water facilities in the vicinity of this project: • An existing 12-inch water main on NE Bayshore Place (Herald Plaza) that runs along the entire easterly boundary of the project. • An existing 24-Inch water main on NE 15'h Street that runs along the entire northerly boundary of the project. • An existing 24-inch and an existing 6" water main on N. Bayshore Drive that run along the entire westerly boundary of the project. • An existing 6-inch and an existing 4" water main that runs within the development's property that needs to be removed. • An existing 36-inch transmission water main on NE 13th Street that runs along the entire southerly boundary of the project_ These existing water mains can be used to provide fire protection domestic and landscape irrigation service for this project. B. Required Water System Improvements: Based on the records provided by Miami -Dade Water and Sewer Department (MD-WASD) the existing water mains appear to be adequate to support the proposed development. MD-WASD Infill Committee will make an evaluation of the system and may require additional system improvements. This will be determined during final design. C. Anticipated water use: The water use requirements for this project are calculated based on the build -out information previously described. An anticipated flow demand of 261,636 GPD is expected from this project. The previous flows are approximately 2,543 GPD. The expected net increase is 259,094 GPD. For determination of anticipated flows see Exhibit "C". p.7 5 Jan 20 06 I1:12a VSN ENGINEERING go tra 0 0 to Since 1989 3055514542 GML LAND DEVF.OPIrENT TRAFFIC AND TRANSPORTATION 4. Sewer Collectign System A. Existing Sanitary Sewer System Facilities: Miami -Dade Water & Sewer Department (MD-WASD) owns and operates the following sanitary sewer facilities in the vicinity of this project: • An existing 10-inch gravity sewer line along Herald Plaza that runs along a portion of the Westerly boundary of the project. This line connects to an existing 12-inch gravity line that runs west along NE 14'h Street. • An existing 12-inch gravity sewer line along N. Bayshore Drive that runs along a portion of the west side of the project. • An existing 72-inch gravity sewer interceptor along N. Bayshore drive that runs along the entire westerly portion of the property. These existing sewer mains can be used to provide service for this project. These lines collect all the sanitary flows from the general area and direct them to MD-WASD Pump Station # 30-002. B. Required Sanitary Sewer System requirements: Based on the records provided by Miami -Dade Water and Sewer Department (MD-WASD) the existing sewer mains appear to be adequate to support the proposed development. The Sanitary Sewer System in the vicinity of this project will have to be evaluated by the MD-WASD to determine if additional improvements may be required. That will be done at the time of permitting. p.8 6 Jan 20 06 11:12a VSN ENGINEERING MKMIMM rr 01111+=IIIIIIIM aim .---4=11111111m trr��r w�wr�rrw I NI— m ro eo 1 OB Since 1989 3055514542 CM. LAND DEVELOPMENT TRAFFIC AND TRANSPORTATION C. Transmission Capacity Requirements The Wastewater generated by this project will be conveyed to MD-WASD Regional Pump Station No. 30-002. This is a major station with a yearly NAPOT of 4.65 hours per day as of November 2005 according to DERM. (See Exhibit "C'). Pump Station No_ 30-002 at this time has sufficient available capacity to support this project. p.9 7 Jan 20 05 11:13a VSN ENGINEERING 1 m P A G9 :Since 1989 5, Solid Waste Generation 3055514542 p.10 CML LAND DEVELOPMENT TRAFFIC AND TRANSPORTATION A. Solid Waste Generated by this project will be collected in standardized on - site containers for refuse and re-cyciables. Either hauling companies and/or the City of Miami Solid Waste Department will provide regular pick- up services. The anticipated daily solid waste generation for this project is 78 CY per day. (See Appendix "D"). 8 Jan 20 06 11:13a VSN ENGINEERING fmill0=== AAIMAAMMilm ME IIMMINE=11101111 a 5 $70 5 Era c Since 1989 3055514542 p.11 CML LAND DEVELOPOENT TRAFFIC AND TRAMPORTATION EXHIBIT "A" LOCATION PLAN • 9 Jan 20 06 11:13a VSN ENGINEERING 3055514542 p.I2 11 1Ffri 6111E1 K.E. 16THIMIC1 1 4E 1411 tiE 1)1F. 5114 LOCATION SKETCH NOT TO SCALE PROJECT LOCATION 10 Jan 20 05 11:13a VS!1 ENGINEERING MOM 41111. Mr r--VMOMMIIM MM. r IMINM. MUM. IMPOINIMI .MIIMIS.. - r\ fl IIIMI=MINNI WIN urimarMTNI — ril Since 1989 3055514542 p.13 cm LAND DVELOP ENT TIC AND TRANSPORTATION EXHIBIT "B" Storm Drainage Calculations 11 Jan 20 06 11:14a Wmn !1—"- • .�.. .ter.... ■ra w. =MIMR VSN ENGINEERING 3055514542 p. €4 m Io 7 4y Since 1989 PROJECT NAME DRAINAGE AREA: • CM. LAND DEVELOPMENT 'TRAFFIC AND TRANSPORTATION CITY SQUARE 11712006 ENTIRE SITE Page 1 SITE DATA: SITE AREA = 6.50 ACRES BUILDING FOOT PRINT = 450 FT BUILDING HIGHT = 400 FT BUILDING WALL AREA = 4.13 ACRES CONTRIBUTING BUILDING AREA= 1.24 ACRES CONTRIBUTING AREA = 7.74 ACRES NUMBER OF WELLS = 8 REQUIRED VOLUME FOR 90 SEC, DETENTION TIME (PER WELL): CONTRIBUTING AREA PER WELL = 0.97 ACRES RAINFALL INTENSITY (90 SEC) = 6,4 IN/HR RUN OFF VOLUME (90 SEC) = 502 CF DETENTION VOLUME PROVIDED: TANK LENGTH = 16.00 FT TANK WIDTH = 7.00 FT TANK BOTTOM ELEV = -2.50 NOVO TOP OF WELL CASING ELEV 2.50 NGVO STORAGE DEPTH = 5.00 FT DETENTION VOL PROVIDED = (per welt) 560 CF TOTAL DETENTION VOLUME = 4,480 CF 12 Jan 20 06 11:14a VSN ENGINEERING 2 5 tre IR 11 PROJECT NAME DRAINAGE AREA: Since 1989 3055514542 p,15 CIVIL LAND OEVID4P11191T TRAFFIC AND TRANSPORTATION CITY SQUARE 1/7/2006 ENTIRE SITE Page 2 DRAINAGE WELL DATA: WELL DIAMETER r WELL DISCHARGE RATE PER FT OF HEAD AVAILABLE HEAD = DISCHARGE RATE PER WELL = CUMULATIVE INFLOWIOUTFLOW DATA: STORM FREQUENCY = C FACTOR DRAINAGE AREA = it OF WELLS PROVIDED TOTAL DISCHARGE RATE = TOTAL DISCHARGE RATE = SEDIMENT TANK STORAGE = F.D. STORAGE _ SOLID PIPE STORAGE INFLOW-EXFILTRATION TABLE 24 INCHES 759 GPM 3.00 FT 2,250 GPM 6 YEARS 0.95 7.74 ACRES 8 18,000 GPM 40.11 CFS 4,480 CF 0 CF 0 CF I TIME MIN 1NTEN. IN/HR CUM.INFLOW CF SYST. STO. CF ADJ. INFL. CF WELL D1SCH. CF OVERFLOW CFS 8 6.41 22611 4480 18131 19251 -2.33 10 6.17 27214 4480 22734 24064 -2.22 15 5.64 37349 4480 32869 36096 -3.59 20 5.20 45896 4480 41416 48128 -5.59 30 4.50 59514 4460 55034 72193 -9.53 49 3.96 69883 4480 56403 98257 -12.86 6o 3.20 84626 4480 80146 144385 -17.54 90 2A8 98476 4480 93998 216578 -22.70 1ZU 2.03 107252 4480 102772 288770 -25.83 150 1.71 113312 4480 108832 360963 -28.01 180 1.48 117747 4480 11325T 433155 -29.62 13 500000 450000 400000 350000 300000 0 M 250000 -J 0 200000 150000 100000 50000 0 0 CUMULATIVE INFLOW—EXFILTRATION / / #49' / WELL DISCHARGE 40.11 CFS / ,..• ...° d.,.." ,..."- I' I' ....# CUMULATIVE IFIFLOW 0*:*# 1.115MQJNEL INFLOW 20 40 60 80 100 TIME (MIN) 120 140 160 180 200 eu 3 0 0 0 914 n1331./19143 NSA 217S-b I GSSOS Jan 20 OG 11:15a ! - a�ww rrRE+ME 1111MIIIIMP r.. _M..r.+■ M IMmunlinn VSN ENGINEERING 3055514542 p.17 6 n m �19 6 JJ Since 1989 CIVIL LAND DEVELOPMENT TRAFFIC AND TAANGPORTAT7ON EXHIBIT "C" MD-WASD Sewer Atlas MD-WASD Water Atlas Proposed Water Use Calculations DERM Pump Station 30-002 Status 15 • Jan 20 06 11:1Sa VSN ENGINEERING NE 13 rH S°'l'�, • 3055514542 frti� �i 17822 I f-1---.�` \�1 fi ! 550 : ,...r..--- ; P. 18 PROJECT LOCATION MD-WASD SEWER ATLAS 16 Jr 20 OG 11:15a YGN ENGINEERING 3055514542 p.19 PROJECT LOCATION /3 7" sr. MD-WASD WATER ATLAS 1 7 Jan 20 06 11:15a VSN ENGINEERING MINMENMIM rall= INN ifl to 2 ( Since 1989 3055514542 LAND DrvappwENT TRAFFIC AND TF ANSPORTATIDN PROPOSED WATER USE CALCULATIONS PROJECT CITY SQUARE DATE: 18-Jan-06 TYPE OF BUILDING USE _ AREA [sf) [units] RATE [gpdisfj [gpdiuni] ADF iglx11 r PROPOSED FLOWS: Residential Condominiums 985 200 197,000 Retail 542,728 ' 0,05 27,136 Restaurants (25,000 sf, 750 seats) 750 50.00 37,500 SUB -TOTAL 261.636 PREVIOUS FLOWS: Commercial 25,427 0.10 2,543 SUB -TOTAL 2.543 NET INCREASE: 259,094 8550 W. FLAGLER STREET, SUITE 113, MIAMI, FLORIDA 33144 'TEL: (305) 5514267 • FAX (305) 551.4542 E-mail: vsn@vanene.com p. 20 18 Jan 20 0S 11:16a VSN ENGINEERING 3055514542 p. 21 *2005110211183977*DRARMM * This is not an official docum ent. * M Stat Station Station Current Delta Projected R Type Owner Number ET (Hrs) ET (Hrs) ET (Hrs) Proposed Number of gallons (gpd): 109531 ********* :t**•****************** Downstream Stations ********,*************art***** ON. A5RM* 30 0002 4.65 0.08 4.73 AC 30 ' CD 1001.97 0.02 1001.99 a• 19 Jan 20 06 11:16a VSN ENGINEERING r1111r=1• - r-N=EMrr IMMUNE =ism - E i9 0 t 99c Since 1989 3055514542 DIAL LARD DEVELOPMENT TRAFFIC AND TRANSPORTATION EXHIBIT " D" Solid Waste Generation Calculations p. 22 20 Jan 20 06 11:16a VSN ENGINEERING — s /III—in— wum rr worwri w ImM..d= err simmomm Imo Pt PI OU Since 1989 3055514542 p.23 MIL LAND DEYE.PPAENT TRAFRO AND TRANSPORTATION PROPOSED SOLID WASTE CALCULATIONS PROJECT CITY SQUARE DATE: 19-Jan-06 TYPE OF BUILDING USE AIREAIUNITS [s#] [seats] RATE jiblslj [Ib/seatj SOLID WASTE GENERATED [Ib] SOLID WASTE GENERATED [tons] PROPOSED BUILDING: APARTMENT UNITS 985 8 7,880 3.94 RETAIL 542,728 0.025 13,568 6.78 RESTAURANTS 750 1.00 750 0.38 NET INCREASE: 22,198 . 11.10 ANTICIPATED SOLID WASTE VOLUME AT 7 CY PER Tc 78 CY I DAY 21 8550 W. FLAGLER STREET, MATE 113, MIAMI, FLORIDA 33144 TEL: (305) 551-6267• FAX: (305) 551-4542 E•mali; Vsn(vsneng,com