HomeMy WebLinkAboutSchool Board Comments (4.21.06)**PRELIMINARY**
SCHOOL IMPACT REVIEW ANALYSIS
April 21.2OO8
FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE
|NTERUOCAL/\(3REEK8ENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED
SINCE THE APPLICANT IS NOT REQUESTING /\O[}|T|{JN/4L RESIDENTIAL DENSITY
OVER WHAT |SCURRENTLY ALLOWED |NTHE PORPERTY'S ZONING CLASSIFICATION.
APPLICATION: City Square Residential
(LSD Mtg. May 10,2006)
REQUEST: Large Scale Development
ACRES: +1.97ooroa
ZONING: GO'O High Density R9Sid8O<i8| (500 DU/acre)
LOCATION: Approximately 1401 Biscayne Blvd. and 1410'1420 N. Baynhone
Drive, Miami
MSA/
NUMBER OF
UNITS:
47/.27Multifamily
985unitn
zoning allows 905maximum dwelling units)
ESTIMATED STUDENT
POPULATION: 206students
ELEMENTARY: 122
K8|O[]LE: 07
SENIOR HIGH: 77
SCHOOLS SERVING AREA C)FAPPLICATION
ELEMENTARY: PhiUinWheatley Elementary —18O1 NVV1"P|
MIDDLE: Jose OeDiego Middle —31OONVV5Avenue
SENIOR HIGH: Booker T.Washington Senior High —12O0NVV5Avenue
All schools are located in Regional Center |V.
*Based on Census 2000 information provided by Miami -Dade County Department ofPlanning
and Zoning.
The fmUqxvn0 population and facility capacity data are as reported by the Office of
Information Technology, ommfOctober 2O85:
PhiUixVVheuUey
Elementary
Jose DeDiego
Middle
BookerT.
Washington
Senior High
STUDENT
pppoLAnww
306
_____
428 ~
1.022
FISH DESIGN
cApxury
psnm^wswr
038
1,043
2'27O
NUMBER OF
ponrxeLs
oruoswr
sr»rowo
O
0
O
% UTILIZATION FISH
DESIGN CAPACITY
psnMxwswTAwo
RELCOATABLE
oumuLArws
STUDENTS-
1.U40
2.466
4,330
*Student population increase anaresult ofthe proposed development
"Estimated # of students (cumulative) based on zoning/land use log (2001 present) and
assuming all approved developments are built; also assumes none of the prior cumulative
students are figured incurrent population.
N :
1> Figures above reflect the impact ofthe class size amendment.
2) Pursuant to the Interlocal Agreement, none of the schools meet the review threshold.
PLANNED RELIEF SCHOOLS |NTHE AREA
(Information included in proposed 5-Year Capital Plan, 2005-2009, dated April 2005)
Projects in Planning, Dom/8n or Construction
School Status
Proigctmd Occupancy
Proposed Relief Schools
School FundingYear
State School ^GG'1^ FY06'O7
(LAND TOBEDONATED BYTHE (Proposed)
CITY OF K8|AyN|}
(Jose De Diego Middle School n*|ieD
(1.241 student stations)
OPERATING COSTS: Accounting k/Financial Affairs, the average cost for K-12grade students
amounts to $6.548 per student. The total annual operating cost for additional students residing
in this development, if approved, vvou|d total $1.742.034.
CAPITAL COSTS: Based on the 8tate's K8ay3OO5 student station cost factors*, capital costs
for the estimated additional students to be generated by the proposed development are:
ELEMENTARY 122 x 14.371 = $1.758.262
MIDDLE 67 X 16.477 = $1.103.858
SENIOR HIGH 77 X 21.804 = $1.878.908
Total Potential Capital Cost $4,536.139
*Based on Information provided by the Florida Department ofEducation, Office ofEducational
Facilities Budgeting. Cost per student station does not include land cost.