Loading...
HomeMy WebLinkAboutSchool Board Comments (4.21.06)**PRELIMINARY** SCHOOL IMPACT REVIEW ANALYSIS April 21.2OO8 FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE |NTERUOCAL/\(3REEK8ENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE THE APPLICANT IS NOT REQUESTING /\O[}|T|{JN/4L RESIDENTIAL DENSITY OVER WHAT |SCURRENTLY ALLOWED |NTHE PORPERTY'S ZONING CLASSIFICATION. APPLICATION: City Square Residential (LSD Mtg. May 10,2006) REQUEST: Large Scale Development ACRES: +1.97ooroa ZONING: GO'O High Density R9Sid8O<i8| (500 DU/acre) LOCATION: Approximately 1401 Biscayne Blvd. and 1410'1420 N. Baynhone Drive, Miami MSA/ NUMBER OF UNITS: 47/.27Multifamily 985unitn zoning allows 905maximum dwelling units) ESTIMATED STUDENT POPULATION: 206students ELEMENTARY: 122 K8|O[]LE: 07 SENIOR HIGH: 77 SCHOOLS SERVING AREA C)FAPPLICATION ELEMENTARY: PhiUinWheatley Elementary —18O1 NVV1"P| MIDDLE: Jose OeDiego Middle —31OONVV5Avenue SENIOR HIGH: Booker T.Washington Senior High —12O0NVV5Avenue All schools are located in Regional Center |V. *Based on Census 2000 information provided by Miami -Dade County Department ofPlanning and Zoning. The fmUqxvn0 population and facility capacity data are as reported by the Office of Information Technology, ommfOctober 2O85: PhiUixVVheuUey Elementary Jose DeDiego Middle BookerT. Washington Senior High STUDENT pppoLAnww 306 _____ 428 ~ 1.022 FISH DESIGN cApxury psnm^wswr 038 1,043 2'27O NUMBER OF ponrxeLs oruoswr sr»rowo O 0 O % UTILIZATION FISH DESIGN CAPACITY psnMxwswTAwo RELCOATABLE oumuLArws STUDENTS- 1.U40 2.466 4,330 *Student population increase anaresult ofthe proposed development "Estimated # of students (cumulative) based on zoning/land use log (2001 present) and assuming all approved developments are built; also assumes none of the prior cumulative students are figured incurrent population. N : 1> Figures above reflect the impact ofthe class size amendment. 2) Pursuant to the Interlocal Agreement, none of the schools meet the review threshold. PLANNED RELIEF SCHOOLS |NTHE AREA (Information included in proposed 5-Year Capital Plan, 2005-2009, dated April 2005) Projects in Planning, Dom/8n or Construction School Status Proigctmd Occupancy Proposed Relief Schools School FundingYear State School ^GG'1^ FY06'O7 (LAND TOBEDONATED BYTHE (Proposed) CITY OF K8|AyN|} (Jose De Diego Middle School n*|ieD (1.241 student stations) OPERATING COSTS: Accounting k/Financial Affairs, the average cost for K-12grade students amounts to $6.548 per student. The total annual operating cost for additional students residing in this development, if approved, vvou|d total $1.742.034. CAPITAL COSTS: Based on the 8tate's K8ay3OO5 student station cost factors*, capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY 122 x 14.371 = $1.758.262 MIDDLE 67 X 16.477 = $1.103.858 SENIOR HIGH 77 X 21.804 = $1.878.908 Total Potential Capital Cost $4,536.139 *Based on Information provided by the Florida Department ofEducation, Office ofEducational Facilities Budgeting. Cost per student station does not include land cost.