Loading...
HomeMy WebLinkAboutSchool Board Comments (1.6.06)**PRELIMINARY** SCHOOL IMPACT REVIEW ANALYSIS January 6, 2006 FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE THE APPLICANT IS NOT REQUESTING ADDITIONAL RESIDENTIAL DENSITY OVER WHAT IS CURRENTLY ALLOWED IN THE PROPERTY'S ZONING CLASSIFICATION. IN ADDITION, SCHOOLS THAT WOULD SERVE THE PROPOSED DEVELOPMENT ARE UNDER THE 115% THRESHOLD CAPACITY. APPLICATION: Tiziano II (LSD Mtg. January 18, 2006) REQUEST: Large Scale Development ZONING: R-4 "Multifamily High Density Residential" and SD-20 Overlay (150 DU/acre) ACRES: ±0.37 net acres and ±0.66 gross acres LOCATION: Approximately 2307 NE 4 Avenue and 413-423 NE 23 Street, Miami MSA/ MULTIPLIER: 4.7 / 0.27 Multifamily NUMBER OF UNITS: 55 units (Existing zoning allows 55 units) ESTIMATED STUDENT POPULATION: 15 ELEMENTARY: MIDDLE: SENIOR HIGH: 7 4 4 SCHOOLS SERVING AREA OF APPLICATION ELEMENTARY: Phillis Wheatley Elementary — 1801 NW 1 PI. MIDDLE: Jose De Diego Middle — 3100 NW 5 Avenue SENIOR HIGH: Booker T. Washington Senior High — 1200 NW 6 Avenue All schools are located in Regional Center IV. *Based on Census 2000 information provided by Miami -Dade County Department of Planning and Zoning. The following population and facility capacity data are as reported by the Office of Information Technology, as of October 2005: STUDENT POPULATION FISH DESIGN CAPACITY PERMANENT UTILIZATION FISH DESIGN CAPACITY PERMANENT NUMBER OF PORTABLE STUDENT STATIONS % UTILIZATION FISH DESIGN CAPACITY PERMANENT AND RELCOATABLE CUMULATIVE STUDENTS** Phillis Wheatley Elementary 306 638 48% 0 48% 1,242 313 * 49% 49% Jose De Diego Middle 1,022 1,043 98% 0 98% 2,834 1,026 * 98% 98% Booker T. Washington Sr. 1,543 2,270 68% 0 68% 4,678 1,547 68% 68% *Student population i ncrease as a result of the proposed developm ent **Estimated # of students (cumulative) based on zoning/land use log (2001- present) and assuming all approved developments are built; also assumes none of the prior cumulative students are figured in current population. Notes: 1�1 Figures above reflect the impact of the class size amendment. 2) Pursuant to the Interloca I Agreement, none of the schools meet the review threshold. PLANNED RELIEF SCHOOLS IN THE AREA (Information included in proposed 5-Year Capital Plan, 2005-2009, dated April 2005) Projects in Planning, Design or Construction School Status N/A Projected Proposed Relief Schools Occupancy Date School Funding year State School "GG-1" FY 06-07 LAND TO BE DONATED BY CITY OF MIAMI Proposed (Jose de Diego M iddle School relief) (1,241 student stations) OPERATING COSTS: Accounting to Financial Affairs, the average cost for K-12 grade students amounts to $6,549 per student. The total annual operating cost for additional students residing in this development, if approved, would total $98,235. CAPITAL COSTS: Based on the State's January 2006 student station cost factors*, capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY 7 x 13,940 = $97,580 MIDDLE 4 x 15,983 = $63,932 SENIOR HIGH 4 x 21,150 = $84,600 Total Potential Capital Cost $246,112 *Based on Information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per student station does not include land cost.