HomeMy WebLinkAboutBid Sheet 2BID SHEET
(Continued)
AGGREGATES, TOP SOILS AND SAND, CO-OP CONTRACT
Zone One - Palm Beach County Line South to include Commercial Boulevard, Florida Turnpike
West to Sawgrass Expressway. See Attachment "B". Estimated quantities include
requirements for Margate, Coral Springs, Tamarac and Coconut Creek.
GROUP 1A (ITEMS 1 THRU 7 ), AGGREGATES (Continued)
ESTIMATED
ITEM ANNUAL DELIVERED
NO. QUANTITY DESCRIPTION PRICE PER TON TOTAL
6 400 TONS CRUSHED LIMERQCK 70%.
as per Attached Special specifications
,7 700 Tons Pea Rock
as per Attached Special specifications
TOTAL GROUP 1A (ITEMS 1 -7)
$ 1.7.08 IToN $ 6,832.00
$ 22.73 /ton $ 15,911.00
$119,987.60
Delivery will be 2 calendar days after receipt of Purchase Order, not to exceed three (3)
days.
NAME OF COMPANY: AUSTIN TUPLER TRUCKING, INC.
AUTHORIZED0.-----
SIGNATURE: ~-1
31
BID SHEET
(Continued)
AGGREGATES, TOP SOILS AND SAND, CO-OP CONTRACT
Zone One - Palm Beach County Line South to include Commercial Boulevard, Florida Turnpike West
to Sawgrass Expressway. See Attachment "B". Estimated quantities include
requirements for Margate, Coral Springs, Tamarac and Coconut Creek.
GROUP 15 (ITEMS 8 THRU 16 ), TOP SOILS — NON -STERILE
ESTIMATED
ITEM ANNUAL DELIVERED
NO. QUANTITY DESCRIPTION PRICE
TOTAL
8. 20 CU. Y0. TOP SOIL MIX 90/10 46 , 44 928.80
as per Attached Special specifications $ /Cu, Yo,$
9. 20 cu. yd. Top Soil Mix 80/20 4 7 , 69 953 .80
as per Attached Special specifications $ /cu. yd. $
10. 550 cu yd. Top Soil Mix 70/30 48 .4 7 2 6 , 658 . 5 0
as per Attached Special specifications $ /cu. yd. $
11 20 cu, yd, Top Soil Mix 50/50 2 b . 90 /cu 53 8.00
as per Attached Special specifications $ yd. $
12. 300 cu yd. Top Soil Mix 100% 35.10 10,530.00
as per Attached Special specifications $/cu. yd. $
13. 1800 cu. yd Ortona Sand
as per Attached.Special specifications $ 35 .10 /cu yd. $ 63,180.00
14. 1,400 cu. yd. Florida Lawn Sand 35 ,10 49,140.00
as per Attached Special specifications $ /cu. yd. $
15. 620 Tons Mason Sand
as per Attached Special specifications $ 26.00 /ton $ 16,120.00
16. 5000 Tons Trap Sand #70 26 , 00 30 , 000.00
as per Attached Special specifications $ tton $
TOTAL GROUP 1 B (ITEMS 8 • 16) $298 , 049.10
Delivery will be 3 calendar days after receipt of Purchase Order, not to exceed three (3)
days.
NAME OF COMPANY: AUSTIN TUPLER TRUCKING, INC.
)AUTHORIZED SIGNATURE:
32
BID SHEET
(Continued)
l
AGGREGATES, TOP SOILS AND SAND, CO-OP CONTRACT
Zone One - Palm Beach County Line South to include Commercial Boulevard, Florida Turnpike West
to Sawgrass Expressway. See Attachment "B". Estimated quantities include
requirements for Margate, Coral Springs, Tamarac and Coconut Creek.
GROUP 1 C (ITEMS 17 THRU 21 ), TOP SOILS — STERILIZED
ESTIMATED
ITEM ANNUAL DELIVERED
NO. QUANTITY DESCRIPTION PRICE
TOTAL
17. 20 Cu. YD. TOP SOIL MATERIAL 90/10 STERILIZED
as per Attached Special specifications
18. 20 cu. yd. Top Soil Mix 80/20 sterilized
as per Attached Special specifications
19. 5,050 cu, yd. Top Soil 70/30 sterilized
as per Attached Special specifications
20. 1,000 cu. yd. Nursery Mix sterilized
as per Attached Special specifications
21 20 cu. yd. Exotic Mix sterilized
as per Attached Special specifications
Delivery will be
days.
14
NAME OF COMPANY:
TOTAL GROUP 1C (ITEMS 17 - 21)
$ 59.04 ICU. YD.$ 1,180.8C
$ 62.59 Icu. yd. $ 1,251.8C
$ 61.07 /cu. yd. $308, 403 .50
$ 58.35 !cu yd $ 58,350.00
$ 82.39 Icu yd.$ 1,647.80
$370,833.90
calendar days after receipt of Purchase Order, not to exceed fourteen (14)
AU)STIN TUPLER TRUCKING, INC.
AUTHORIZED SIGNATURE: --Ct
33
BID SHEET
(Continued)
AGGREGATES, TOP SOILS AND SAND, CO-OP CONTRACT
Zone Two - Palm Beach County Line South to include Commercial Boulevard, Florida Turnpike East
to State Road A IA, (Atlantic Ocean). See Attachment "B". Estimated quantities include
requirements for Deerfield Beach and Pompano Beach.
GROUP 2A (ITEMS 22 THRU 28 ), AGGREGATES
ESTIMATED
ITEM ANNUAL
NO. QUANTITY DESCRIPTION
DELIVERED
PRICE PER TON TOTAL
22. 1800 TONS ROAD ROCK - CRUSHED LIMEROCK
as per Attached Special specifications
ADDITIONAL CHARGE FOR DOUBLE
CRUSH, IF REQUESTED $ 1 . 00 /PER TON
23. 1500 Tons Three-quarter inch Wash Rock
as per Attached Special specifications
$ 17.33 /TON $ 31 ,194 .0,
$ 21.93 /ton $ 32,895.0(
24. 20 Tons Fill as per Attached Special specifications $ 11 • 4 8 /ton $
25, 20 Tons Stabilizer Material
as per Attached Special specifications $ 13.00 /ton $ 260.0(
229.6(
• 26. 20 Tons Concrete Screenings
as per Attached Special specifications
27. 5,000 Tons Crushed Limerock 70%
as per Attached Special specifications
$ 24.13 /ton $
482.6C
$ 17.33 /ton $ 86,650.0C
28. 20 Tons Pea Rock
as per Attached Special specifications $ 22 .88 /#pn $457.60
$152,168.80
Delivery will be
days.
2
NAME OF COMPANY:
TOTAL GROUP 2A (ITEMS 22 - 28)
calendar days after receipt of Purchase Order, not to exceed three (3)
AUSTIN TUPLER TRUCKING, INC.
)AUTHORIZED SIGNATURE:
34