Loading...
HomeMy WebLinkAboutConcurrencyProposal No 06-05 Date: 2/13/06 CONCURRENCY MANAGEMENT ANALYSIS CITY OF MIAMI PLANNING DEPARTMENT IMPACT OF PROPOSED AMENDMENT TO LAND USE MAP WITHIN A TRANSPORTATION CORRIDOR AMENDMENT INFORMATION CONCURRENCY ANALYSIS Applicant: Gilberto Pastoriza, Esq on behalf of 600 Brickell LLC Address: A portion of 600 Brickell Avenue and 57 SE 7th Street Boundary Streets: North: SE 6th street East:Brickell Avenue South: SE 7th street West: n/a Proposed Change: From: Office To: Restricted Commercial Existing Designation, Maximum Land Use Intensity Residential 1.64 acres @ 150 DU/acre 246 DU's Peak Hour Person -Trip Generation, Residential 123 Other sq.ft. @ FAR 0 sq.ft. Peak Hour Person -Trip Generation, Other 0 Proposed Designation, Maximum Land Use Intensity Residential 1.64 acres @ 150 DU/acre 246 DU's Peak Hour Person -Trip Generation, Residential 123 Other sq.ft. @ FAR 0 sq.ft. Peak Hour Person -Trip Generation, Other 0 Net Increment With Proposed Change: Population 0 Dwelling Units 0 Peak Hour Person -Trips 0 Planning District Downtown County Wastewater Collection Zone 309 Drainage Subcatchment Basin K1 Solid Waste Collection Route 36 Transportation Corridor Name Brickell RECREATION AND OPEN SPACE Population Increment, Residents 0 Space Requirement, acres 0.00 Excess Capacity Before Change 182.80 Excess Capacity After Change 182.80 Concurrency Checkoff OK POTABLE WATER TRANSMISSION Population Increment, Residents 0 Transmission Requirement, gpd 0 Excess Capacity Before Change >2% above demand Excess Capacity After Change >2% above demand Concurrency Checkoff OK SANITARY SEWER TRANSMISSION Population Increment, Residents 0 Transmission Requirement, gpd 0 Excess Capacity Before Change See Note 1. Excess Capacity After Change See Note 1. Concurrency Checkoff WASA Permit Required STORM SEWER CAPACITY Exfiltration System Before Change On -site Exfiltration System After Change On -site Concurrency Checkoff OK SOLID WASTE COLLECTION Population Increment, Residents 0 Solid Waste Generation, tons/year 0 Excess Capacity Before Change 800 Excess Capacity After Change 800 Concurrency Checkoff OK RELEVANT MCNP GOALS, OBJECTIVES, AND POLICIES Land Use Policy 1.1.1 CIE Policy 1.2.3 TRAFFIC CIRCULATION Population Increment, Residents 0 Peak -Hour Person -Trip Generation 0 LOS Before Change B LOS After Change B Concurrency Checkoff OK NOTES 1. Permit for sanitary sewer connection must be issued by Metro -Dade Water and Sewer Authority Department (WASA). Excess capacity, if any, is currently not known CM 1 IN 03/13/90 ASSUMPTIONS AND COMMENTS Population increment is assumed to be all new residents. Peak -period trip generation is based on ITE Trip Generation, 5th Edition at 1.4 ppv average occupancy for private passenger vehicles. Transportation Corridor capacities and LOS are from Table PT-2(R1), Transportation Corridors report. Potable water and wastewater transmission capacities are in accordance with Metro -Dade County stated capacities and are assumed correct. Service connections to water and sewer mains are assumed to be of adequate size; if not, new connections are to be installed at owner's expense. Recreation/Open Space acreage requirements are assumed with proposed change made.