Loading...
HomeMy WebLinkAboutSchool Board Comments (6.29.05)Jun 29 2005 4:1SPM SI- PLANNING 3059954760 p.4 **PRELIMINARY** SCHOOL IMPACT REVIEW ANALYSIS June 29, 2005 APPLICATION: Hiawatha Village REQUEST: Large Scale Development (LSD Mtg. July 26, 2005) CURRENT ZONING: "R-3" (Tracts A, B and C) ACRES: Approximately 1,7341 net acres LOCATION: 3535 Hiawatha Avenue, Miami NUMBER OF UNITS: 10 Townhomes and 26-Residential Multifamily. MSA/ MULTIPLIER: 5.2 / 0.18 multifamily and 0.35 single-family attached ESTIMATED STUDENT POPULATION: 6 students* ELEMENTARY: 3 MIDDLE: 1 SENIOR: 2 SCHOOLS SERVING AREA OF APPLICATION: ELEMENTARY: Coconut Grove Elementary— 3351 Matilda Street MIDDLE: Ponce De Leon Middle - 5801 Augusto Street SENIOR HIGH: Coral Gables Senior - 450 Bird Rd. All schools are in Region IV. *Based on Census 2000 Information provided by Miami -Dade County Department of Planning and Zoning. Jun 28 2005 4:1SPM SI-- PLANNING 3059954760 p.5 The following population and facility capacity data are as reported by the Office of Information Technology, as of October 2004: STUDENT 'FISH DESIGN % NUMBER OF % CUMULATIVE POPULATION CAPACITY UTILIZATION PORTABLE UTILIZATION STUDENTS" PERMANENT FISH DESIGN STUDENT FISH DESIGN CAPACITY STATIONS CAPACITY PERMANENT PERMANENT AND RELOCATABLE Coconut Grove 328/ Elementary 331* Ponce De Leon Middle 1,501/ 1,502* Coral Gables 3,610/ Senior High 3,612* 283 1,225 2,092 116%/ 117%* 123%/ 123%* 173%/ 173%* 44 198 95 100%/ 101* 105%/ 105%* 165%1 165%* * increased student population as a result of the proposed development ** 558 1,639 4,055 Estimated # of students (cumulative) based on zoning/land use log (2001- present) and assuming all approved developments are built; also assumes none of the prior cumulative students are figured in current population Notes: 1) Figures above reflect the impact of the class size amendment. 2) Pursuant to the Interlocal Agreement, only Coral Gables Senior High School meets the review threshold. PLANNED RELIEF SCHOOLS IN THE AREA (Information included in proposed 5-Year Capital Plan, 2005-2009, dated January 2005) Projects in Planning, Design or Construction School Status Cora Gables Senior High Construction Addition (830 student stations) Proposed Relief Schools Occupancy Date May 2005 School Funding Year State School "LLL-1" FY 07-08 Int. Studies Senior High at Metrorail Coral Gables Senior High School (700 student stations) Ponce de Leon Middle FY 06-07 Renovations OPERATING COSTS: According to Financial Affairs, the average cost for K-12 grade students amounts to $6,549 per student. The total annual operating cost for additional students residing in this development, if approved, would total $39,294. Jun 28 2005 4:20PM SI- PLANNING 3059954780 p. CAPITAL COSTS: Based on the State's July 2005 student station cost factors*, capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY MIDDLE SENIOR 3 x $ 13,579 = $40,737 1 x $ 15,563 =$16,563 2 x $ 20,594 =$41,188 Total Potential Capital Cost $98,488 Based on Information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per student station does not include land cost.