A. Zoning Ordinance No. 11000
1. Section 1304.2.1 Application forms; supplementary
materials
2. Section 1702.2.1 General Report
3. Section 1702.2.2 Major Use Special Permit Concept Plan
4. Section 1702.2.3 Development Impact Study
•
1
MAJOR USE SPECIAL PERMIT
1. Section 1304.1.1 Application forms; supplementary materials
(a) Statements of ownership and control of the proposed development
of activity.
The Disclosure of Ownership and Ownership Affidavit are provided in
Article I.
(b) Statement describing in detail the character and intended use of
the development or activity.
The project consists of a 6-story condominium tower of 18 units, and 5
4-story townhomes. Condominium parking consists of a parking court
of 9 parking spaces and one loading space; 41 additional spaces are
provided within the building structure. Townhomes' parking is self
contained consisting of double garages plus individual driveways with
capacity for two cars each.
The Project heights are as follows:
Condominium Component 65'-6" at its mid ridge point, measured from
flood elevation.
Townhome Component: 44'-4" at mid ridge, measured from grade level.
The development consists of a parcel with a net lot area of 59,023.00
square feet (1.35 acres). The gross lot area is 76,335.00 square feet
(1.75 acres), The property is located at 3535 Hiawatha Ave, Miami, Fl.
33133. The proposed zoning designation for the property is R-3.
The proposed building will contain 23 residential units, and 71 parking
spaces. Additional amenities include a marina, pool deck and
multipurpose room.
Drawings showing the architectural character and location of the
intended uses are included under Tab 6 of the Supporting Documents.
(c) General location map, showing relation of the site or activity for
which special permit is sought to major streets, schools, existing
utilities, shopping areas, important physical features in and
adjoining the project or activity and the like.
The following exhibits are included with the Major Use Special Permit
Application:
(1)
Aerial: Aerial photograph of the surrounding area indicating the
project site.
•
•
•
(2) Area Context Map/Site Aerial: Map of the project area
indicating buildings and their functions that surround the site.
(3)
Location Map: Map of the surrounding street system indicating
the project location.
(d) A site plan containing the title of the project and the names of the
project planner and developer, date, and north arrow and, based on
an exact survey of the property drawn to a scale of sufficient size
to show:
The general information requested is shown on the Ground/Site Plan,
Sheets A-1.00, provided under Tab 6 of the Supporting Documents.
The site plan includes the following:
(1)
Boundaries of the project, any existing streets, buildings,
watercourses, easements and section lines;
The boundaries of the project and the location of existing
streets and easements are shown on the Survey located
under Tab 5 of the Supporting Documents.
(2) Exact location of all buildings and structures;
(3)
The exact location of all existing buildings located on the
property is shown on the Boundary Survey under Tab 5. The
location of the building to be constructed is shown on the
Ground/Site Plan, Sheet A-1.00 , located under Tab 6 of the
Supporting Documents.
Access and traffic flow and how vehicular traffic will be
separated from pedestrian and other types of traffic;
Vehicular access for the project is provided from Hiawatha Ave.
for the condominium component. Townhomes will have
individual driveways directly from W. Glencoe St. The service
drive for the project, as well as the loading area are accessed
thru Hiawatha Ave.
A detailed analysis of the site access and traffic flow is
provided in the Traffic Impact Analysis located under Tab 2 of
the Supporting Documents.
(4) Offstreet parking and offstreet loading areas;
The offstreet parking will be composed of a parking court in
front of the Condominium component with capacity for 9
spaces and 1 loading area. 41 additional spaces are allocated
within the structure. Townhomes are provided with double
garages and front individual driveways with capacity for 2
additional cars. Parking areas and garages are shown on
sheets A-1.00, A-2.00, and A-3.01, provided under Tab 6 of the
Supporting Documents.
•
•
•
3
The Zoning Ordinance requires one (1) loading bay (12 ft x 35
ft.) There will be one (1) loading bay 10 ft. x 20 ft as shown on
sheet A-1.00, under Tab 6 of the Supporting Documents.
(5) Recreational facilities locations;
The Marina and swimming pool are located at the east side of
the property facing the bay. Outdoor terraces are provided at
lobby level of condominium tower. Indoor multipurpose room is
located within condominium structure.
These facilities are shown on sheets A-1.00, A-3.02, located
under Tab 6 of the Supporting Documents.
(6) Screens and buffers;
Landscaped areas are indicated on the Landscape Plans,
Sheet L-1, located under Tab 6 of the Supporting Documents.
(7) Refuse collections areas;
(8)
Waste collection will be provided by a containerized system
located within the sstructure for the condominium units as
shown on sheet A-3.01, located under Tab 6 of the Supporting
Documents.
Access to utilities and points of utilities hookups.
Access and connections to site utilities are discussed in the
Site Utility Study located under Tab 3 of the Supporting
Documents.
(e) Tabulations of total gross acreage in the project and the
percentages thereof proposed to be devoted to:
(f)
(1) The various permitted uses:
Residential Sq. Ft. = 82,694.38S.F.
(2) Ground coverage by structures:
Building Footprint= 28,165.72 S.F.
Ground coverage by the structures is 36.9% of the total gross lot area.
Tabulation showing the following:
(1)
The derivation of numbers of offstreet parking and
offstreet loading spaces shown in (d) above;
The total number of offstreet parking spaces required is 61 spaces and
the total number of spaces provided is 71 spaces. Derivation of the
•
•
4
(g)
number of offstreet parking is shown on sheet A-0.02, within the Project
Summary, located under Tab 6.
(2) Total project density in dwelling units per acre.
As per R-3 zoning the maximum project density is 50 units per
acre. The designated site is 1.35 acres, which allows for the
construction of 67 units. This project will provide only 23 units.
If common facilities (such as recreation areas of structures, private
streets, common open space, etc.) are to be provided for the
development, statements as to how such common facilities are to
be provided and permanently maintained.
All common facilities provided will be maintained by the Owner.
(h) Storm drainage and sanitary sewerage plans.
(i)
Storm drainage, water distribution, waste water and solid waste
generation provisions are discussed in the Site Utility Study located
under Tab 3 of the Supporting Documents.
Architectural definitions for buildings in the development; exact
number of dwelling units, sizes, and types, together with typical
floor plans of each type.
Detailed information and breakdown of square footage of all uses are
found under Project Criteria within The Project Summary, included
under Tab 6 of the Supporting Documents. Typical floor plans for
residential units are shown on the Typical Residential Floor Plans. All
drawings are located under Tab 6 of the Supporting Documents.
(j) Plans for signs, if any.
The project will obtain signage approval at a later date.
(k) Landscaping plan, including types, sizes and locations of
vegetation and decorative shrubbery, and showing provisions for
irrigation and future maintenance.
(I)
(m)
The landscape plans showing vegetation are found on sheet L-1. All
landscape plans are located under Tab 6 of the Supporting Documents.
Plans for recreation facilities, if any, including location and general
description of buildings for such use.
Such additional data, maps, plans, or statements as may be
required for the particular use or activity involved.
•
•
The details of the spaces and calculations used to compute the Floor
Area Ratio (FAR) are shown on Sheets A-0.03, A-0,04, provided under
Tab 6 of the Supporting Documents.
(n) Such additional data as the applicant may believe is pertinent to
the proper consideration of the site and development plan.
Elevations depicting the architectural character of the building are
shown on the Building Elevations, sheets A-2.03, A-3.10 and A-3.11. All
elevations are located under Tab 6 of the Supporting Documents.
2. Section 1702.2.1 General Report.
(1) Property ownership and beneficial interest within the boundaries of
the area proposed for Major Use Special Permit.
Statement of Ownership and beneficial interest within the boundaries of
the area proposed for Major Use Special Permit are provided in Article 1.
The nature of the unified interest or control.
The nature of unified interest or control is indicated in Article I.
Survey of the proposed area showing property lines and
ownership.
A copy of the Surveys are included under Tab 5 of the Supporting
Documents.
(4) Map of existing features, including streets, alleys, easements,
utilities lines, existing land use, general topography, and physical
features.
(5)
The existing site features and utility lines are shown on the Boundary
Survey of the property located under Tab 5. The site features and the
utilities are also described in the Site Utility Study, located under Tab 3
of the Supporting Documents.
Materials to demonstrate the relationship of the elements listed in
(4) preceding to surrounding area characteristics.
The drawings submitted with this Application are located under Tab 6 of
the Supporting Documents.
(6) Existing zoning and adopted comprehensive plan designations for
the area on and around the lands proposed for Major Use Special
Permit.
The existing zoning designation for the property pursuant to City of
Miami Ordinance No. 11000 for the property is R-3.
3. Section 1702.2.2 Major Use Special Permit Concept Plan.
•
•
a. Relationships of the concept plan to surrounding existing and
proposed future uses, activities, systems, and facilities
(transportation, recreation, view corridors, pedestrian systems,
service systems and similar uses.
Article II contains a written narrative of this project outlining proposed
uses, activities and architectural character. This narrative also contains
descriptions of the projects relationship to traffic, pedestrian
movements, and transportation access. Building elevations, sections
and perspectives showing the proposed materials, vertical profile and
height, and orientation to streets are included in the drawings submitted
with this Application. The list of drawings submitted is found under Tab
6 of the Supporting Documents.
b. Existing zoning and adopted comprehensive plan principles and
designations.
The project conforms with the R-3 zoning district designation for the
property. The comprehensive plan future land use designation
conforms with the land use designation currently in effect for the
property.
4. Section 1702.2.3 Developmental Impact Study.
6
(a)
A traffic analysis shall be submitted for an area within
approximately 1/4 mile of the site, or an area including the major
intersections to be impacted by the site, whichever is larger.
The Traffic Impact Analysis is included under Tab 2 of the Supporting
Documents.
(b) Economic impact data shall be provided, including estimates for
construction costs, construction employment, and permanent
employment and shall demonstrate that the proposed development
is favorable to the economy, public services, environment and
housing supply of the City.
The Economic Impact Study is included under Tab 4 of the Supporting
Documents.
(c) A housing impact assessment.
Over the last several years prices of urban housing have increased
dramatically; despite the recent slow down in the economy. With the
continued increase in population the need for housing will increase,
putting additional pressure to supply housing in the urban market at
affordable prices.
(d) A description of proposed energy conservation measures shall be
provided, including only those measures that are proposed in
addition to the minimum requirements in State Energy Code.
•
(e).
(f).
•
•
Architecturally, the building envelope will be comprised of insulated
walls and roof. Tinted glass will be used throughout the building.
Electrically, all exterior and landscape lighting will be controlled by
means of time clocks and photocell switches. Energy saving lamps,
ballasts and fixtures are being considered at cores and public spaces.
Historic Buildings
There are no historic structures located on the property.
Environmental Zone
The pr perty $ no (t�ct d within. an . Nihon ent i present:00 des