Loading...
HomeMy WebLinkAboutSchool Board Comments (1.23.06)**PRELIMINARY** SCHOOL IMPACT REVIEW ANALYSIS January 23, 2006 FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE THE SCHOOLS THAT WOULD SERVE THE PROPOSED DEVELOPMENT ARE UNDER THE 115% THRESHOLD CAPACITY. APPLICATION: 2121 Biscayne Blvd. (LSD Mtg. February 8, 2006) REQUEST: Large Scale Developm ent ZONING: C-1 "Restricted Commercial" (150 DU/acre) ACRES: 0.98-net acre LOCATION: 2121 Biscayne Blvd., Miami MSA/ MULTIPLIER: 4.7 / 0.27 Multifamily NUMBER OF UNITS: 147 maximum units (60-Studios, 60-1BR & 25- 2BR) ESTIMATED STUDENT POPULATION: 40 ELEMENTARY: 18 MIDDLE: 10 SENIOR HIGH: 12 SCHOOLS SERVING AREA OF APPLICATION ELEMENTARY: Phillis Wheatley Elementary —1801 NW 1 PI. MIDDLE: Jose De Diego Middle — 3100 NW 5 Avenue SENIOR HIGH: Booker T. Washington Senior — 1200 NW 6 Avenue All schools are located in Regional Center IV. *Based on Census 2000 information provided by Miami -Dade County Department of Planning and Zoning. The following population and facility capacity data are as reported by the Office of Information Technology, as of October 2005: STUDENT POPULATION FISH DESIGN CAPACITY PERMANENT UTILIZATION FISH DESIGN CAPACITY PERMANENT NUMBER OF PORTABLE STUDENT STATIONS % UTILIZATION FISH DESIGN CAPACITY PERMANENT AND RELCOATABLE CUMULATIVE STUDENTS"" Phillis Wheatley Elementary 306 638 48% 0 48% 1,242 324 * 51% 51% Jose De Diego Middle 1,022 1,043 98% 0 98% 2,834 1,032 * 99% 99% Booker T. Washington Sr. 1,543 2,270 68% 0 68% 4,678 1,555 * 69% 69% *Student population increase as a result of the proposed development **Estimated # of students (cumulative) based on zoning/land use log (2001- present) and assuming all approved developments are built; also assumes none of the prior cumulative students are figured in current population. Notes: 1) Figures above reflect the impact of the class size amendment. 2) Pursuant to the Interloca I Agreement, none of the schools meet the review threshold. PLANNED RELIEF SCHOOLS IN THE AREA (Information included in proposed 5-Year Capital Plan, 2005-2009, dated April 2005) Projects in Planning, Design or Construction School Status N/A Projected Proposed Relief Schools Occupancy Date School Funding year State School "GG-1" FY 06-07 (Jose De Diego Middle School relief) LAND TO BE DONATED BY CITY OF MIAMI (1,241 student stations) OPERATING COSTS: Accounting to Financial Affairs, the average cost for K-12 grade students amounts to $6,549 per student. The total annual operating cost for additional students residing in this development, if approved, would total $261,960. CAPITAL COSTS: Based on the State's February 2006 student station cost factors*, capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY 18 x 14,378 = $258,804 MIDDLE 10 x 16,485 = $164,850 SENIOR HIGH 12 x 21,815 = $261,780 Total Potential Capital Cost $685,434 *Based on Information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per student station does not include land cost.