Loading...
HomeMy WebLinkAboutSchool Board Comments (11.28.05)**PRELIMINARY** SCHOOL IMPACT REVIEW ANALYSIS November 28, 2005 FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE THE APPLICANT IS NOT REQUESTING ADDITIONAL RESIDENTIAL DENSITY OVER WHAT IS CURRENTLY ALLOWED IN THE PORPERTY'S ZONING CLASSIFICATION. APPLICATION: Mid Town Park (LSD Mtg. December 14, 2005) REQUEST: Large Scale Development ACRES: +1.35 net acres ZONING: R-2 "Single Family Duplex / Two -Family Residential (13 DU/acre) and "C-2" Liberal Commercial District" (150 DU/acre) LOCATION: Approximately NW 35`h Street and North Miami Avenue, Miami MSA/ MULTIPLIER: 4.7 / 0.27 NUMBER OF UNITS: 132 units ESTIMATED STUDENT POPULATION: 36 ELEMENTARY: MIDDLE: SENIOR HIGH: 17 9 10 SCHOOLS SERVING AREA OF APPLICATION ELEMENTARY: Eneida M. Hartner Elementary — 401 NW 29th Street MIDDLE: Jose De Diego Middle — 3100 NW 5'h Avenue SENIOR HIGH: Booker T. Washington Senior — 1200 NW 6th Avenue All schools are located in Region IV. *Based on Census 2000 information provided by Miami -Dade County Department of Planning and Zoning. The following population and facility capacity data are as reported by the Office of Information Technology, as of August 2005: STUDENT POPULATION FISH DESIGN CAPACITY PERMANENT % UTILIZATION FISH DESIGN CAPACITY PERMANENT NUMBER OF PORTABLE STUDENT STATIONS % UTILIZATION FISH DESIGN CAPACITY PERMANENT AND RELCOATABLE CUMULATIVE STUDENTS" Eneida M. Hartner Elem. 842 703 120% 0 120% 1,255 859 * 122% 122% Jose De Diego Middle 1,022 1,043 98% 0 98% 2,834 1,031 * 99% 99% Booker T. Washington Sr. 9 1,543 2,270 68% 0 68% 4,678 1,553 * o 68 /0 68% *Student population i ncrease as a result of the proposed developm ent **Estimated # of students (cumulative) based on zoning/land use log (2001- present) and assuming all approved developments are built; also assumes none of the prior cumulative students are figured in current population. Notes: 1) Figures above reflect the impact of the class size amendment. 2) Pursuant to the Interlocal Agreement, only Eneida M. Hartner Elementary School meets the review threshold. PLANNED RELIEF SCHOOLS IN THE AREA (Information included in proposed 5-Year Capital Plan, 2005-2009, dated January 2005) Projects in Planning, Design or Construction School Status N/A Proposed Relief Schools School State School "GG-1" Planning FY 06-07 (Proposed) Projected (LAND TO BE DONATED BY THE CITY OF MIAMI) (Jose De Diego Middle School relief) (1,241 student stations) Funding year OPERATING COSTS: Accounting to Financial Affairs, the average cost for K-12 grade students amounts to $6,549 per student. The total annual operating cost for additional students residing in this development, if approved, would total $864,468. CAPITAL COSTS: Based on the State's December 2005 student station cost factors*, capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY 36 x 13,933 = $501,588 MIDDLE 17 x 15,974 = $271,558 SENIOR HIGH 10 x 21,139 = $211,390 Total Potential Capital Cost $984,536 *Based on Information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per student station does not include land cost.