HomeMy WebLinkAboutLong Range Construction EstimateCapital lmpr mrements Department
LONG RANGE '.ONSTRUCTION ESTIMATE
Project PAC Super Birk Streetscape Improvement
Limits: West side of NE 2nd Avenue from NE 13 St. to NE 14th Street
Florida Department of Transportation PAC Sdsetscape Addilio sal Work
City of Miami Pm)ec1 Manager Kevin A Bro." P.E.
ARP CONSULTING TRANSPORTATION ENGINEERS. CORP
10365 N.YIL 41 STt, MIAMI, FLORIDA 33178
PNONE: (305) 5e2-7203 FAX 305. 03-1504
Estimator: Ethel M. Sierra, P.E.
11/1Of20O5
110-4
EXISTING CONCRETE PAVEMENT REMOVAL (FOR REMOVAL OF EXIST- SWK)
SY
$30.00
050
528.500.00
528-1-2
CONCRETE DECORATIVE PAVERS (AGGREGA,E SHELL) FOR SIDEWALK TREATMENT
SY
S85.00
050
$
580-1-1
LANDSCAPE (SMALL PLANTS) (DROUGHT RE'.ISTANT)
LS
510.00
100
.0.00
11
580-1-2
LANDSCAPE (LARGE PLANTS)
LS
$2.500-00t
10
.000.0
525,000.06
715-631-132
DECORATIVE 51 HEk I IJGHT1NG (MISTALLAT10.1) CONDUITS. Alm PULL BOXES.
EA
$3,500.00
8
$21.000.00
715-531-113
DECORATIVE PEDESTRIAN L1G 1Te1G (e1STALl4TION)CONDUIT, AND PULL BOX
EA
$1.�.00
1
53.500.00
715-10-2
LIGHTING POLE FOUNDATION (FURNISH AND r ISTALL)
RNI
$1.000.00
6
$9,000.00
715-550-000
EXISTING LIGHT POLES REMOVAL
i500.00
2
$000.00
(INSTALLATION) C(7rI)IIITS. AND PULL BOXES
WAYFIN00�1G FTATURESEA
EA
$3,500.00
2
57,000.00
SUBTOTAL ALL AREAS
$178,350.00
102-1
MAINTENANCE OF TRAFFIC (10%)
LS
1
$ 17 635.00
101-1
MDBILAATION (10%)
LS
1
$ - 17,635.00
"Ill — Nf
CONTINGENCY AMOUNT FOR UNFORSEEN CC CATIONS (25%1
LS
1
$ 52 905.00
TOTAL LONG RANGE CONSTRUC I1ON 1`OST
_
>i264,525 00