Loading...
HomeMy WebLinkAboutConcurrencyProposal No 06-06 Date: 2/27/06 CONCURRENCY MANAGEMENT ANALYSIS CITY OF MIAMI PLANNING DEPARTMENT IMPACT OF PROPOSED AMENDMENT TO LAND USE MAP WITHIN A TRANSPORTATION CORRIDOR AMENDMENT INFORMATION CONCURRENCY ANALYSIS Applicant: City of Miami Address: 662 NW 20th St, 1669 NW 6th PI & 1603-1627 NW 7th Avenue Boundary Streets: North: NW 17th Street East: 1-95 South: NW 15th Street Proposed Change: From: Industrial To: General Commercial Existing Designation, Maximum Land Use Intensity Residential acres @ 0 DU/acre Peak Hour Person -Trip Generation, Residential Other 123,275 sq.ft. @ 1.72 FAR Peak Hour Person -Trip Generation, Other Proposed Designation, Maximum Land Use Intensity Residential 2.83 acres @ 150 DU/acre Peak Hour Person -Trip Generation, Residential Other sq.ft. @ FAR Peak Hour Person -Trip Generation, Other Net Increment With Proposed Change: Population Dwelling Units Peak Hour Person -Trips Planning District County Wastewater Collection Zone Drainage Subcatchment Basin Solid Waste Collection Route Transportation Corridor Name West: NW 7th Avenue 0 DU's 0 212,033 sq.ft. 9 425 DU's 213 0 sq.ft. 0 1,091 425 204 Allapattah 309 G3 16 1-95 RECREATION AND OPEN SPACE Population Increment, Residents Space Requirement, acres Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff 1,091 1.42 182.80 181.38 OK POTABLE WATER TRANSMISSION Population Increment, Residents Transmission Requirement, gpd Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff 1,091 244,376 >2% above demand >2% above demand OK SANITARY SEWER TRANSMISSION Population Increment, Residents Transmission Requirement, gpd Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff 1,091 201,829 See Note 1. See Note 1. WASA Permit Required STORM SEWER CAPACITY Exfiltration System Before Change Exfiltration System After Change Concurrency Checkoff On -site On -site OK RELEVANT MCNP GOALS, OBJECTIVES, AND POLICIES Land Use Policy 1.1.1 CIE Policy 1.2.3 SOLID WASTE COLLECTION Population Increment, Residents Solid Waste Generation, tons/year Excess Capacity Before Change Excess Capacity After Change Concurrency Checkoff 1,091 1,396 800 (596) OK TRAFFIC CIRCULATION Population Increment, Residents Peak -Hour Person -Trip Generation LOS Before Change LOS After Change Concurrency Checkoff 1,091 204 B B OK NOTES 1. Permit for sanitary sewer connection must be issued by Metro -Dade Water and Sewer Authority Department (WASA). Excess capacity, if any, is currently not known CM 1 IN 03/13/90 ASSUMPTIONS AND COMMENTS Population increment is assumed to be all new residents. Peak -period trip generation is based on ITE Trip Generation, 5th Edition at 1.4 ppv average occupancy for private passenger vehicles. Transportation Corridor capacities and LOS are from Table PT-2(R1), Transportation Corridors report. Potable water and wastewater transmission capacities are in accordance with Metro -Dade County stated capacities and are assumed correct. Service connections to water and sewer mains are assumed to be of adequate size; if not, new connections are to be installed at owner's expense. Recreation/Open Space acreage requirements are assumed with proposed change made,