Loading...
HomeMy WebLinkAboutTAB O - Site Utility StudySEVEN 7 MAJOR USE SPECIAL PERMIT SITE UTILITY STUDY By: B, A, & K GROUP, INC. 12000 SW 92 STREET MIAMI, FL 33186 Voice: 786-488-1000 Fax: 305-675-5732 FEBRUARY 2006 Seven 7 1 Site Utility Study Site Utility Study Introduction The Seven 7 project is a proposed 17 story mixed use —commercial / residential multi -family high rise building to be built on a total of 1.07 acres of land located at 2728 NE 2 Avenue, on West side of NE 2 Avenue between NE 27 Street and NE 28 Street. It is located in the City of Miami, Miami -Dade County, Florida (see site location map -Fig 1). The development includes a residential tower constructed on a parking garage/ commercial structure. It will consist of 88 residential apartments units, 4,018 square feet of commercial area and 139 parking spaces. Table 1, below depicts the details of the proposed project. Table 1: Project Summary Occupancy Unit Floor Area (sf) Commercial 4,018 Residential 88 Units 87,025 Lobby/Clubhouse 1 unit 1,175 Total 92,218 Parking 139 Seven 7 2 Site Utility Study Location Map 126 j 24 22 8 140' (M) 44 44 19 17 '15 .13- 11 9 10' BLOCw -2efh STL'R7i5� . 1 1 20 181 n 4[32,1/0?fi ;4 IEli b I. Drainage N.E. 27th STREET LOCATION SKETCH SCALE:) Figure 1 Existing Drainage Presently, the site is undeveloped. There is no existing drainage systems on site. Proposed Drainage System The drainage systems for the proposed development will consist of drainage wells and exfiltration trenches, if possible, to facilitate on -site disposal of storm water runoff. The 5- year design storm event will be used to design the storm water management system, in accordance with Section D-4, "Water Control", of Part 2 of the Miami -Dade County Public Works Manual. Seven 7 3 Site Utility Study No topographic survey is available. The existing and proposal site elevations are unavailable; therefore no preliminary drainage calculations are included in this report. However, based on other projects in the area, it is anticipated that two (2) 24" drainage wells will provide sufficient capacity to dispose of the design 5-year 24-hour storm water runoff generated by the proposed development. The final drainage design for the project should be in conformance with the requirements of the Miami -Dade County DERM Water Control Section, Florida Department of Environmental Protection, and the local, State , and federal regulatory agencies having jurisdiction over the project. II. Water Distribution System The water mains owned and operated by the Miami -Dade Water and Sewer Department (MDWASD) in the vicinity of the project are shown in the Table 2. Table 2: Existing Water Mains Location Between Water Main(s) NE 2 Ave NE 27 ST and NE 28 St 6" NE 27 St NE 2 Ave and the FL East Coast Railroad 2" NE 28 St NE 2 Ave and the FL East Coast Railroad 36" In accordance with MDWASD criteria, the owner will might be required to construct a new 12-inch ductile iron (DI) water main along the frontage of the property on NE 2 Avenue. A final determination of the points of connection and requirements will not be provided by MDWASD until a Water and Sewer Service Seven 7 Site Utility Study 4 Agreement is requested by the owner. Water service meters will be installed by MDWASD forces at owner's expense. See Attachment for a copy of the MDWASD water atlas sheet for the project area. III. Sanitary Sewer Collection System Table 3 depicts the sanitary sewer mains owned and operated by Miami -Dade Water and Sewer Department (MDWASD) within the vicinity of the project. Table 3: Existing Sanitary Sewer Mains Location Between Sanitary Sewer Main(s) NE 2 Ave NE 27 ST and NE 28 St 12" Gravity Main NE 2 Ave NE 27 ST and NE 28 St 36" Force Main NE 27 St NE 2 Ave and the FL East Coast Railroad 8" Gravity Main NE 28 St NE 2 Ave and the FL East Coast Railroad 8" Gravity Main A copy of the MDWASD Sewer Atlas sheet has been attached. The proposed on -site sanitary sewer system for the property can properly be connected to the existing public gravity mains. A final determination of the points of connection and requirements will not be provided by MDWASD until Water and Sewer Service Agreement is requested by the owner. A letter of availability from DERM and further coordination with MDWASD is needed to verify the proposed sanitary sewer service connection points and requirements for this project. MDWASD may require upgrades to the sanitary sewer system, but this can not be determined without a request for a water and sewer service agreement. The flows from the existing MDWASD sanitary sewage mains on NE 2 Avenue are received by MDWASD Regional Pump Station #2. As of September 2005, this Seven 7 Site Utility Study 5 pump station is operating under capacity as established by the USEPA, and is not under any type of moratorium. See Attachment for Pump Station Monthly Information. At this time, it is not anticipated that any improvements to the regional pumping and/or transmission systems will be required to connect the proposed Project. However, a final determination regarding the status of the existing transmission system and the need for possible improvements will not be made until the construction plans are submitted to the Miami -Dade County DERM Wastewater Section and a Sanitary Sewage System Capacity Certification Letter is issued. The flows created by this project have been determined and are shown in Table 4. Table 4: Water and Sewer Flow Generation Type of Occupancy Quantity Usage rate Total Average Daily Flow (gpd) Apartment 88 units 200 gpd per unit 17,600 Commercial 4,018 sf 10 gpd per 100 sf 402 Total Anticipated Flow 18,002 gpd IV. Solid Waste Generation Solid waste generated by this project will be collected in standard on -site containers for refuse and recyclables. Regular pick-up service will be provided either by private hauling companies and/or by the City of Miami Solid Waste Department, who will transport the waste to Miami -Dade County's or private disposal and recycling facilities. The volumes of solid waste projected to be generated are shown in Table 6. Seven 7 Site Utility Study 6 Table 5: Solid Waste Generation Type of Occupancy Phase I Quantity Usage rate Total Solid Waste Generated (Tons/Day) Apartment 88 units 5lbs/unit/day 0.220 Commercial 4,018 sf 6lbs11000sflday 0.012 Total Anticipated Solid Waste Generated 0.232 Seven 7 Site Utility Study 7 • ,r 1 BROWARD cou14 �1 / �/ ! j// / 1 rAL.1-Lr /52 I 1— 1 .X� 44L G 13 Crz ®I. 13G3 TYNrr.� HG 614 • COCOMVT r41 - s. r.esr� f4 S72A, _ •.9i7A • PP'G It r 270 C7EeA• • •c11i3' t' • F � o�. O CITT -� •: Q4u49S •6126T^ it\\ ° 1 I i u3 c.1r 4 •t SCALE IN MILEi N l Xl t•!7 4.4C,/ Y14611 A*. k $1 ,rJCA ex( 0 b F LSE E 144 c., 4 (.3 L-EGENO: (ESTIMATED) NOTES: 1. CONTOUR INTERVAL 1.0 •F001 (Except as indixrMd) - 2. DtglJM IS MEAN SEA LEVEL_ NOTE: PREPARED FROM US SURVEY DATA POU)q N rEvIsED DESIGN . STANDARDS _ COVtMle APPROVED 2./I9/T5 AVERAGE • OCTQBER 'WORKS 4/5/72 4/14/77 GROUND WATER LEVEL 2. }y v r r �1 F I LLAN 3t L0T 5 IT /3\ -mmri E•71.84fiW: XlAM! IS A vase T: 65 N.1 -Ca u.v fr CIHam[ •�/' DINNER ATV ENVISION noxrw I11.f 41 5 7AA CH AIN XYAXI 0 53 42 1-0c.1r1 Q `flSNEhe VSIAXO 5 AA'ERS n+Vt0vc • wf Co+ V 4r 54 42 4 6 LEGEND EXISTING CANAL • PROPOSED CANAL 0 X C.O_ WATER CONTROL STRUCTURE O OAOE CO. WATER CONTROL STRUCTURE FL000 CRITERIA CONTOURS EVEN -FOOT INTERVAL -TN0LF-FOOT lN,TERVAL —.— IRTERHEOIa1E INTERVAL SCALE IN FEET I 0 Iaaa leao .Ieoo NOTE L MINIMUM ELEVATION OF S.O FT. APPLSES TO ALL AREAS EXCEPT tYNEAE INDICATE° OTNERWYSC.fOR AREAS WEST of EVEA0LA0ES IIATION0L PARK AN0 WEST Of CONSERVATION AREA N0. 5, FLO011 CRITERIA IS TENTATIVELY ESTABLISHED AT MO FT. -2. MIN ELEV. OF SEAWALLS FOR WAVE PROTECTION NOT SHOWN. G'� 1. ELEVATIONS L.S.L. NATIONAL ['ATOM. MMANCH me? SEX. 26,O22 SHEET ATTACHMENTS Existing utility record Seven 7 Site Utility Study S,, 6"I WEMN- 1.:111S (FIL) 8" IfQP OVER 1I Ic1 z NW 27 ST cv • 1 (6124 650 GW':.• ii4-1)14 NE 2 NE. 29 TH 4TFEET /IL / rl// 117 a198 /i Wzn 34-F .14 ! \� ?I 4/ NE 79 ST 12, OVER 706 1 125 to • • Zp I$125 j :r{175' !� ' 650 1B 1 2s }� 3 6' 6125 15 26 ST 8" 609 615 1 275 1 1203 l 1 12- POP AVER 9125 16 % NE 28 ST // 1 NE 28 5T 26" 6 { • 27 ST 1 �� II 4" f a A� 2. i0 i 2. / /662 ) i''• ''—'\ 7-----4\ / 1-:i..t l ! 2 y{ 1 { 221 (609 / 7 ,----- Hop OVER % 619 j / .� �v' -r. \ `�,�i NE25ST of � NE285T 12 E! !.6,. �7556 (8891 j: Pi 199 -� 4 l / 1 7-- -1 7 1 J ( ,. i r soa 36" 6 • (615 � r g 91 \1 (5 NE 27 ST ca ....___ 327 -,-; _...-_., r :315 tr-i 578ii 3 1 ; 1567 1 .,, f) T.‘---4 .' .2. r \ . ,.. ! is NE 28 ST \ 0 / "!' 1 f 0 NE 28 ST ; •- ,_ •-•- ,.. 13 ,.. ,.-442 -----,441./ j- Z i 297 _____ : . ' t ,,S' 2 E £ . .+, -,.. _.t. , , , i nui 1 :1550 . -t -,1 ; 1556 ': 518 i 1 i 1' , _• ,, _,,' 43. .t ,' .1 0 9- -1' i \ ,• \ ,---- '....._, -.(..,,,, ., ......!.. i''' i 1 143 1 / l'...t t.,.' / NF 27 ST ; f•-'• 7' ; NE 27 ST if / 489 470 I 7i tg - 8 , i 7,i 1558 1 •18 •„1 1421i I' 44 i ' t N:' I , I , ..: ., + 1 • • ./.- '. 1 .• 7 NE 26 ST NE 2 sr t s r i f 2. ;17 2'627 i 'al _ ,:-... /-4,,-,- LI ; I , I, ..,' • 144 -' 26_3_ 471 l •'"- -= t :,- ./:.-. : 1 538 tzza ,• .-----,_ — \ ' I , ti 'i..ii / i i ,...: c1 2 799 25 ST ' i . _ , ..“".0.____;__. __L__L_ ._. / ‘, • i !, .i' .. .' 1 —! I 4 115a o )5 / i NE 29 ST D:...:.4o04-544201 i i .' ! i / NE n a_ , e ‘ , --------tt-, !9 TH GTR-14-1i24 '.---- — • . [ ! 1579 , ] . n...., i' ' , K . ! ''' : \ : 2 , I e - I • .! • 2800 4 il-;t1P OVER i , I 5506 j 07 Iii 0 3l 03 \------/ NE 25 ST 30 ',._..._.. ,' ., 0' 11 30% 0 ;--30'.--;__________ 5 0e5o_508!, , I •;_II.... , i 1, 304 ___. ,------\ 302 ,i / 03 / - • cool 5001 i 28 29 ,27 /I , • ) ,__/ • .Lk.IL. r 1 , , t -- 1 ,., 1 / ..k : , 7.., ! 2787 ) \........_ 4 ST •i• i i 307 NE 24 ST i '4.--. 30 i 41 / ! .‘; 04 ,._._ ....., . ' , SOS i ' ,7, ao 6 5 f -A,..-+ . . 7 • 1 1 4 -• •+ i / 04 1 30" .100 1 02 i2 G3 •›. LU 5 56 2 E 33 2. SE wER ATLAS (F-it) ATTACHMENTS Pump station Information Seven 7 Site Utility Study 9 AVO. 12. 2005 10:01AM Pump Station anon Station, .30 -0002 Atlas- Pg..E13 DUAMI LADE WATER & EWER DEPARTMENT ENT Addr..925 BISCAYNE DLVD Sec -Township -Range 31-53-42 Genr.0 ET clock_Y Telrn.Y 4Pumps, 5 Pump Type.A Stn Class.M Speed.R Hrspwr.+ Res Plans,. Exven. • •flow(gpd) 2,307,256 0 0 Proj Napot Cap 4.55 hrs . 45.50 2.:95 hrs 29.50 3.95-"hrs - 29.50 Date Mo . NAPOT Avg Daily Flows 06/28/2005 05/27/2005 04/28/2005 03/01/2005 01/28/2005 12/28/2004 11/23/2004 GOLD/M GOLD / D GOLD/'.X' 3.68 2.90 1.49 2.92 2.77 2.80 3.09 14.72 11.58 5.95 11.67 11.07 11.21 12.34 tbxy NO.923 .pP. 2 Revievrs Moratorium..OK Moratorium effective since / / Rgd 1g 0.00 Y 0.00 Y 0.00 Y 0.00 0.00 Y 0.00 Y 0,00 Y Si. gnature .. LEALG Station 1<m>provement GOLD/S <S>tatior Inform. <D>ownstream Station Sewer Cer<t> fication Inf oz.t ioxi Yearly NAPOT (hrs) 2.95 Stn Gross Capacity(gpd).. 57,600,000 Station Reduction Factor 0.60 Stn Net Cap Ccrtif (gpd) .. 0 St__ Net Capacit (gpd) • • . - 34,560,000 _o- p ; - 4,248,000 PIT; 5 5 5 5 5 5 5 Comments Sign Date..03/17/2003 13:52:24.01 GOLD/U <U>pstream Station FOLD/P <P>ump Information AC 30 • entSEP. 19. 2005': 8:1 M Stat Station R Type Owner Proposed Number 7AMWUN0. Station Number of gallons ************k***************** OK A5R1V+ 30 0002 OD (gpd): 18358 Downstream cJt5 (2r 597 -, * This i Cl2 7 9� P. n c.i.4..4 ciaj locum Current Delta ET (Hrs ) ET(Hrs) P871 Mrs) Stations ******.***********s ******r.** 4,54 0.01 a•S5 '001.93 0.00 '001.93 Cro ate,. r { 16,