HomeMy WebLinkAboutTAB O - Site Utility StudyWEST BRICKELL CENTRE
Major Use Special Permit
290 SW 10th Street, 245 SW 11 th Street,240-270 SW 10th Street,
251-253 SW 11 th Street, 255 SW 11 th Street, and 267 SW 11 th Street
Site Utility Study
Prepared By:
Rodolfo Ibarra, PE, PA
16215 SW 1 17th Avenue Unit #3
Miami, Florida 33177
MAJOR USE SPECIAL PERMIT (MUSP)
WEST BRICKELL CENTRE
267 S.W. 11TH STREET, MIAMI, FLORIDA
SITE UTILITY STUDY
Prepared for:
Tiner USA, Inc
DENCITY DEVELOPMENT, LLC.
5835 BLUE LAGOON DRIVE SUITE 200
MIAMI, FL 33126
By:
RODOLFO IBARRA PE PA
16215 SW 117 AVE UNIT # 3
MIAMI, FL 33177
PE 45901 EB 7820
January 20, 2006
WEST BRICKELL CENTRE
Site Utility Study
I. INTRODUCTION
Rodolfo Ibarra, PE on behalf of Dencity Development, Ilc. has prepared a Site Utility Study Report for the
construction of the West Brickell Centre. Located on the eastern right of way line of south west 3rd Avenue and
bound by south west 10th street to south west 11th street. Up to and including lots 6 and 16 of block 76S of
Miami Heights (5-29) in the City of Miami, Miami -Dade County Florida. The project consist of a 15-story
apartment building, consisting of 192 residential units, ground floor common area, spa lobby, convenience
retail, and mechanical/electrical support areas, and a 8-story parking garage. The parking garage will provide
318-parking spaces. The total site consists of 1.35± Acres.
We had performed a Site Utility Report level of review of existing site conditions, and existing utilities.
Representatives have visited the site and have spoken with the staff of the various local municipal agencies to
obtain procedures/requirements associated with land development. The Engineer has also researched and
obtained readily available utility information related to the site.
Permits for site work, demolition and building must be obtained from the City of Miami. Stormwater
Management permitting will require approval from the City of Miami Department of Public Works, and Miami -
Dade County Department of Environmental Resources Management (DERM) Water Control Section. Utility
plans will have to be submitted to Miami -Dade Water and Sewer Department, Department of Environmental
Resources Management (DERM) and the Department of Health for their approval.
II. GENERAL
Public water, sewer, storm drainage, electric and telephone utilities were observed within the surrounding
streets. The following agencies and companies control these utilities:
1. Water and Sewer:
2. Fire Protection:
Miami -Dade Water and Sewer Department
Phillip Torres, Head Plan Reviewer (305) 669-7658
City of Miami Fire Department
Lt. Jose Paz, Water Supply officer
(305) 416-1679
3. Storm Water: City of Miami Public Works Department
West Brickell Centre - Site Utility Study Page 2
Len Helmers, City Engineer (305) 416-1221
Miami -Dade County Department of Environmental Resources
Management (DERM)
Camilo Ignacio, Engineer Water Control Section (305) 372-6681
4. Electric: Florida Power and Light
Laura Silvia, (305) 377-6079
5. Telephone: BellSouth Telecommunications, Inc.
Steve Massie (305) 222-8745
6. Gas: TECO Peoples Gas
Charlie Byrd (305) 573-3821
III. WATER DISTRIBUTION AND FIRE PROTECTION SYSTEMS
The Miami -Dade Water and Sewer Department (MDWASD) owns and operates existing 12" and 2" water mains
located in the right-of-way of both SW 10th Street and SW 11 th Street. SW 3rd Ave has a 10" water main and a
major 42" transmission line. SW 3rd avenue corridor is crowed with underground utilities, recommend developer
negotiates water points of connection with MDWASD along 10th or 11th street.
MDWASD may require to connect to the existing water main(s) abutting the project site, along the SW 3rd Ave
property line. For more detailed information please contact the New Business department at MDWASD.
The Building as proposed shall require domestic and fire service connections and can be tapped from the public
mains. The water service for the proposed building must be purchased and installed by MDWASD forces.
Please refer to "Attachment A" for the water atlas.
The City of Miami Fire Department will also require that fire hydrants be located no more than 300 feet from the
proposed buildings, and that there be no more than 300 feet between hydrants fronting the property (measured
along the watermain). For those buildings requiring fire sprinklers, a fire hydrant must be located no more than
100 feet from each building's "fire department connection" (siamese). According to the code, new hydrants will
not be allowed on watermains less than 8 inches in diameter. Any proposed buildings exceeding 12,000 S.F. of
floor space will require that fire sprinklers be installed. An existing fire was found during our site visit and it is
also shown on the Boundary Survey. Please refer to "Attachment C" for the Site Boundary Survey.
No on -site fire, domestic water, or irrigation wells are planned for the project.
West Brickell Centre - Site Utility Study Page 3
Location
Between
Water Main(s)
SW 10th Street
SW 2ND AVE AND SW 3RD AVE
(North side of the Project)
2" and 12" D.I.P
SW 11th Street.
SW 3rd Ave
SW 2ND AVE AND SW 3RD AVE
(South side of the Project)
SW 10th Street AND SW 11th Street
(West side of the Project)
2" and 12" D.I.P
10" and 42" D.I.P.
IV. SANITARY SEWER COLLECTION SYSTEM
The Miami -Dade Water and Sewer Department (MDWASD) owns and operates existing 8" gravity sewer mains
located in the right-of-way of both SW 10th Street and SW 11th Street. SW 3rd Ave has a 8" gravity main,
however, this corridor is crowed with underground utilities, recommend developer negotiates sewer points of
connection with MDWASD along 10th or 11th street. If the pipe is found not to be in good condition, then the
sanitary sewer line must be replaced at the point of connection. Please refer to "Attachment A" for the sanitary
sewer atlas. Owner must apply for sewer allocation from Miami Dade County DERM to see if adequate
capacity exist in the sewage collection and transmission system, including regional pump stations. See
attached allocation application.
No sanitary sewer pump station will be built on -site to serve this project.
Location
Between
Sanitary Sewer
Main(s)
SW 10th Street
SW 2ND AVE AND SW 3RD AVE
(North side of the Project)
8" Gravity
SW 11 th Street.
SW 3rd Ave
SW 2ND AVE AND SW 3RD AVE
(South side of the Project)
SW 10th Street AND SW 11 th Street
(West side of the Project)
8" Gravity
8" Gravity
West Brickell Centre - Site Utility Study
Page 4
V. ELECTRIC
Electric service is provided by Florida Power and Light, which has overhead and underground lines serving the
area. A meeting with a FP&L representative is recommended to determine the feasibility of
relocating/modifying the existing FP&L facilities. Existing facilities may or may not be sized to service proposed
building improvements. Owner, MEP Engineers shall be required to contact FP&L directly to coordinate loads
and distribution systems.
VI. TELEPHONE
Telephone service is provided by BellSouth, which has overhead lines serving the area. Existing facilities may
or may not be sized to service proposed building improvements. Owner , MEP Engineers shall be required to
contact Bellsouth directly to coordinate loads and distribution systems.
VII. STORM WATER MANAGEMENT SYSTEM — DRAINAGE
Existing Drainage:
Existing storm drainage systems within public rights -of -way are owned and operated by the City of Miami.
Several existing storm drains were observed along the abutting streets. However, water quality requirements
will have to be met on site as required by DERM. Drainage connection will not be proposed to the existing
system. The existing site consist of a parking lot at grade with some green areas. Eventually the excess storm
runoffs will potential overflow to the adjacent City right-of-way during more extreme rainfall events.
Proposed Drainage System:
The primary drainage system for the project will consist of drainage wells, which will allow the storm runoff to be
fully contained and disposed of on site. The project will be designed consistent with a 5-year design storm,
DERM Water Control section D-4, part 2 of Miami -Dade County Public Works Department.
It is currently anticipated that four (4) 24" drainage wells will provide sufficient capacity for the project. The final
drainage design for the project will provide a drainage system consistent with the above criteria, and consistent
with all approval and permitting requirements for the project.
Preliminary drainage computations for the project are provided below, which includes the basis for design.
West Brickell Centre - Site Utility Study Page 5
Preliminary Drainage Calculations
Runoff Generation
Total Net Site Area
(not including ext. wall areas)
Total Impervious Area (Incl. Wall areas)
Bldg. Footprint Area
Sidewalks & Open Areas
Green area
58250 sf = 1.37 Acres
101,744 sf = 2.69 Acres
30940 sf = 0.71 Acres
12520 sf = 0.21 Acres
15790 sf = 0.45 Acres
Contributing Exterior Wall Area (1/2 Wall Areas H x W)
Per FBC 2001 Sect 1106.4 "Attachment B"
East West Elevation area including 50% reduction
East / West 27834 sf * 2 * % = 27834 sf = 0.64 Acres
North South Elevation area including 50% reduction
North / South 30450 sf * 2 * % = 30,450 sf = 0.70 Acres
Design Storm - 5 Year Return Frequency
Time of Concentration: 10 min.
Rainfall Intensity: 6.10 in/hr
(*) Assume each 24" diameter well flows at 500 gpm/per ft of head
Site elevation 6.0 ngvd. water table elevation 2.0 ngvd. Yields available head of four feet,
assume 1 foot of headloss from fresh to salt water. Will use 3 foot of head for design
calculations
Ave. 3 ft of head x 500 gpm / foot of head = 1500 gpm / well
4 — 24" drainage wells at 1500 gpm *4 wells = 6000 gpm discharge capacity
6000 gallons/minute * 1 minute/ 60 seconds * cubic feet / 7.48 gallons = 13.36
See attached storm water calculations for a five year storm event.
(*) Well capacity used during this analysis was taken from similar projects within the
Downtown/Brickell Area. Engineer/Designer to verify with well driller contractor to ensure that
this capacity could be provided, otherwise the number of wells could increase as
needed/required.
West Brickell Centre - Site Utility Study Page 6
IV. Solid Waste Generation
Solid waste generated by this project will be collected in standard on -site containers for refuse and recyclables.
Regular pick-up service will be provided either by private hauling companies and/or by the City of Miami Solid
Waste Department, who will transport the waste to Miami -Dade County's or private disposal and recycling
facilities. The volumes of solid waste projected to be generated by the project are shown below.
Proposed -
Project Solid Waste Generation
173795 s.f. (Residential)
2780 s.f. (Non-residential)
(173,795+2,780) s.f. @ 4lbs/100 sq. ft/day = 7063 Ibs/day = 3.6 tonslday
C:V &E\PROJECTS\SO.BAYSHORE.TOWER\SBAY.SHORETOWER.MUSP.DOC
West Brickell Centre - Site Utility Study Page 7