Loading...
HomeMy WebLinkAboutSchool Board Comments (12.18.05)**PRELIMINARY** SCHOOL IMPACT REVIEW ANALYSIS December 18, 2005 FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE THE APPLICANT IS NOT REQUESTING ADDITIONAL RESIDENTIAL DENSITY OVER WHAT IS CURRENTLY ALLOWED IN THE PROPERTY'S ZONING CLASSIFICATION. APPLICATION: West Brickell Centre (LSD Mtg. December 28, 2005) REQUEST: Large Scale Developm ent ZONING: R-4 "Multifamily High Density Residential" (150 DU/acre) ACRES: +1.367 net acres LOCATION: Approximately 267 SW 11 Street, Miami MSA/ MULTIPLIER: NUMBER OF UNITS: ESTIMATED STUDENT POPULATION: ELEMENTARY: MIDDLE: SENIOR HIGH: 5.2 / 0.18 Multifamily 205 units (Existing zoning allows 205 units) 37 17 9 11 SCHOOLS SERVING AREA OF APPLICATION ELEMENTARY: Southside Elementary — 45 SW 13 Street MIDDLE: Shenandoah Middle — 1950 SW 19 Street SENIOR HIGH: Booker T. Washington Senior High —1200 NW 6 Avenue All schools are located in Regional Center IV. *Based on Census 2000 information provided by Miami -Dade County Department of Planning and Zoning. The following population and facility capacity data are as reported by the Office of Information Technology, as of August 2005: STUDENT POPULATION FISH DESIGN CAPACITY PERMANENT % UTILIZATION FISH DESIGN CAPACITY PERMANENT NUMBER OF PORTABLE STUDENT STATIONS % UTILIZATION FISH DESIGN CAPACITY PERMANENT AND RELCOATABLE CUMULATIVE STUDENTS** Southside Elementary 377 7 230 164% 0 164% 2,229 394 * 0 171% 0 171 /o Shenandoah Middle 1,247 1,204 104% 0 104% 2,744 1,256 * 104% 104% BookerT. Washington Sr. 1,543 2,270 68% 0 68% 4,678 1,554 * 68% 68% *Student population i ncrease as a result of the proposed development **Estimated # of students (cumulative) based on zoning/land use log (2001- present) and assuming all approved developments are built; also assumes none of the prior cumulative students are figured in current population. Notes: 1) Figures above reflect the impact of the class size amendment. 2) Pursuant to the Interlocal Agreement, only Southside Elementary School meets the review threshold. PLANNED RELIEF SCHOOLS IN THE AREA (Information included in proposed 5-Year Capital Plan, 2005-2009, dated April 2005) Projects in Planning, Design or Construction School Status Projected N/A Proposed Relief Schools Occupancy Date School Funding year New Elementary at Southside Elementary FY 06-07 (Coral Way/Silver Bluff/Southside Elementary) (1,221 student stations) OPERATING COSTS: Accounting to Financial Affairs, the average cost for K-12 grade students amounts to $6,549 per student. The total annual operating cost for additional students residing in this development, if approved, would total $242,313. CAPITAL COSTS: Based on the State's December 2005 student station cost factors*, capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY 17 x 13,933 = $236,861 MIDDLE 9 x 15,974 = $143,766 SENIOR HIGH 11 x 21,139 = $232,529 Total Potential Capital Cost $613,156 *Based on Information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per student station does not include land cost.