Loading...
HomeMy WebLinkAboutRevised School Impact Analysis**REVISED** SCHOOL IMPACT REVIEW ANALYSIS April 4, 2006 FOR INFORMATIONAL PURPOSES ONLY; THE REQUIREMENTS UNDER THE INTERLOCAL AGREEMENT FOR SCHOOL FACILITY PLANNING ARE NOT TRIGGERED SINCE THE SCHOOLS THAT WOULD SERVE THE PROPOSED DEVELOPMENT ARE UNDER THE 115% THRESHOLD CAPACITY. APPLICATION: Hotel de I'Opera (a/k/a Miramar Centre: Phase it & Ill) REQUEST: Substantial Modification to a Major Use Special Permit (PAB Mtg. April 5, 2006) ZONING: SD-6 "High Residential Density" (500 DU/acre) ACRES: Phase II (0.96 net acre) and Phase III (0.66 net acres) LOCATION: Approximately 1771 NE 4th Avenue, Miami MSAI MULTIPLIER: 4.7 / 0.27 Multifamily NUMBER OF UNITS: Phase II - 635 residential units (under construction) Phase III — 350 hotel rooms (350 X 0.50 = 175 dwelling units) (Existing zoning allows 810 maximum units) ESTIMATED STUDENT POPULATION: 172 ELEMENTARY: 79 MIDDLE: 43 SENIOR HIGH: 50 SCHOOLS SERVING AREA OF APPLICATION ELEMENTARY: Phillis Wheatley Elementary — 1801 NW 1 Pl. MIDDLE: Jose De Diego Middle — 3100 NW 5 Avenue SENIOR HIGH: Booker T. Washington Senior — 1200 NW 6 Avenue All schools are located in Regional Center IV. *Based on Census 2000 information provided by Miami -Dade County Department of Planning and Zoning. The following population and facility capacity data are as reported by the Office of Information Technology, as of October 2005: Fhillis Wheatley Elementary Jose De Diego Middle Booker T. Washington Sr. STUDENT POPULATION 306 385 1.022 1,065 1543 1,593 FISH DESIGN CAPACITY PERMANENT 1 % UTILIZATION NUMBER OF FISH DESIGN ; PORTABLE CAPACITY I STUDENT PERMANENT STATIONS % UTILIZATION FISH DESIGN CAPACITY '. PERMANENT AND CUMULATIVE RELCOATABLE STUDENTS 48% 48% 638 0 60% 60% 1,043 2.270 98% 102% 68% 70% 98% 0 102% 68% 70% 0 1,046 2,466 4,330 *Student population i ncrease as a result of the proposed development **Estimated # of students (cumulative) based on zoning/land use log (2001- present) and assuming all approved developments are built; also assumes none of the prior cumulative students are figured in current population. Notes: 1) Figures above reflect the impact of the class size amendment. 2) Pursuant to the Interloca I Agreement, none of the schools meet the review threshold. PLANNED RELIEF SCHOOLS IN THE AREA (Information included in proposed 5-Year Capital Plan, 2005-2009, dated April 2005) Projects in Planning, Design or Construction School Status NIA Projected Occupancy Date Proposed Relief Schools School Funding year State School "GG-1" FY 06-07 (Jose De Diego Middle School relief) LAND TO BE DONATED BY CITY OF MIAMI (1,241 student stations) OPERATING COSTS: Accounting to Financial Affairs, the average cost for K-12 grade students amounts to $6,549 per student. The total annual operating cost for additional students residing in this development, if approved, would total $1,126,428. CAPITAL COSTS: Based on the State's April 2006 student station cost factors*, capital costs for the estimated additional students to be generated by the proposed development are: ELEMENTARY 79 x 14,364 = $1,134,756 MIDDLE 43 x 16,468 = $708,124 SENIOR HIGH 50 x 21,793 = $1,089,650 Total Potential Capital Cost $2,932,530 *Based on Information provided by the Florida Department of Education, Office of Educational Facilities Budgeting. Cost per student station does not include land cost.