HomeMy WebLinkAboutProject Description•
HOTEL DE L'OPERA
Modification to Phase III of Miramar Centre
MAJOR USE SPECIAL PERMIT
PROJECT DESCRIPTION
ARTICLE II,
Description
A. Zoning Ordinance No. 11000
1. Section 1304.2.1 Application Forms; supplementary materials
2. Section 1702.2.1 General Report
3. Section 1702.2.2 Major Use Special Permit Concept Plan
4. Section 1702.2.3 Development Impact Study
•
•
•
HOTEL DE L'OPERA
Modification to Phase III of Miramar Centre
MAJOR USE SPECIAL PERMIT
PROJECT DESCRIPTION
Zoning Ordinance No. 11000
1. Section 1304.2.1 Application forms; supplementary materials
(a)
Statement of ownership and control of the proposed development of
activity.
The Disclosure of Ownership and Ownership Affidavit are provided in
Article 1.
(b) Statement describing in detail the character and intended use of the
development of activity.
Located in the heart of Miami's Downtown Arts and Entertainment District,
the Hotel De L'Opera is mixed use development that features a 350 room,
full service luxury hotel with a full amenity package including meeting,
banquet and function rooms, and 2 full levels of Class A office space. in
addition the project will include approximately 5,886 net square feet of
street level retail/commercial uses. The building is 34 stories high.
Hotel De L'Opera fronts on NE 4th Avenue along it's western boundary
and NE 17th Terrace to the south. The eastern boundary abuts Opera
Tower, a 635 unit luxury condominium, and is less than one block from
Biscayne Bay and Pace Park, a modern waterfront facility with lighted
tennis courts, art walks and picnic areas.
The project is part of Miramar Centre, which was originally approved by
the City of Miami by covenants in 1995, and 1998, and in 2001 as part of
the Miramar Centre MUSP. Phase III of the MUSP approval was for an
institutional use project containing 100,000 square feet as well as the
adjacent Opera Tower, a 56 story condominium tower.
Hotel De L'Opera will provide additional hotel rooms for the vibrant Omni
area and adds additional hotel rooms for the downtown market as well as
the greater Miami area. The building is directly across the street from the
highly successful Marriott, Radisson and Double Tree hotels, and will
create a critical mass of hotel rooms that will serve the new Performing
Arts Center, convention and meeting business as well as the needs of
downtown Miami. There have been no new hotel rooms added to the
Omni area in 25 years.
•
•
•
It is important to note that the Performing Arts Center Economic Impact
findings indicate that more than 100,000 additional visitors from outside
Miami -Dade County are projected to visit the Center in 2008, which
spotlights the need for additional hotel rooms in this area.
The building design accentuates the curvature of the street along the
property lines and is situated so as retain the lines of sight of adjacent
buildings and lessen its impact.
The street level lobby and retail areas which will house shops and
boutiques, is designed as a colonnade to convey a comfortable and
compatible "curb -appeal" ambiance that will encourage pedestrians to
walk and enjoy the city scene of the neighborhood.
The 2 office levels are incorporated into the building pedestal and provide
"an eye on the street" to add life to the building on the lower levels.
Geometric designed openings that are illuminated with colors at night de-
emphasize the parking garage levels so as to reduce the impact of that
element of the structure.
The Hotel will include 350 rooms, recreation areas, two swimming pools,
exercise gym, meeting, function banquet rooms well as full "back of the
house" elements necessary for its operation. The building will also contain
309 parking spaces.
Drawings showing the architectural character and location of the intended
uses are included under Tab 6 of the Supporting Documents.
(c) General location map, showing relation of the site or activity for
which special permit is sought to major streets, schools, existing
utilities, shopping areas, important physical features in and
adjoining the project or activity and the like.
The following exhibits are included with the Major Use Special Permit
Application and are located in front of this book.
(1) Location Map: Map of the surrounding street system indicating
the project location.
(2) Area Context Map: Map of the project area indicating buildings and
their functions that surround the site.
(3)
Aerial: Aerial photograph of the surrounding area indicating the
project site.
3
•
•
(d) A site plan containing the title of the project and the names of the
project planner and developer, date, and north arrow and, based on
an exact survey of the property drawn to a scale of sufficient size to
show:
(1)
The Site plan is included as Sheet A-100 under Tab 6 of the Supporting
Documents.
Boundaries of the project, any existing streets, building,
watercourses, easements and section lines;
The boundaries of the project and the location of existing streets and
easements are shown on the survey located under Tab 5 of the
Supporting Documents.
(2) Exact location of all buildings and structures;
(3)
The exact location of all existing buildings located on the Property is
shown on the survey located under Tab 5 of the Supporting Documents.
The location of the building to be constructed is shown on the Site Plan,
under Tab 6 of the Supporting Documents.
Access and traffic flow and how vehicular traffic will be
separated from pedestrian and other types of traffic;
A detailed analysis of the site access and traffic flow for the development
is provided in the Traffic Impact Analysis located under Tab 2 of the
Supporting Documents.
Vehicular access for hotel guests, and office tenants, will occur on NE
4thth Avenue. Valet parking for visitors will be available. Ingress and
egress ramps, accessed through a security gate with card key access to
the upper level parking areas will occur off the driveway.
Service vehicles will access the fully Loading Docks from the adjacent
alleyway. A total of two full size (2) Loading Docks and six (6) smaller
docks service the project. Loading and deliveries will be monitored by a
full time Dock Master.
(4) Off-street parking and off-street loading area;
Off-street parking for the building is provided within the 6 level pedestal -
parking garage. The off-street parking spaces are accessed by the ramp
•
•
located off NE 4th Avenue.
The building contains 309 parking spaces, including (6) handicap
accessible spaces.
Service vehicles will access the Loading Docks off the alleyway entry from
NE 17th Terrace.
(5) Recreational facilities locations;
Recreational facilities are located on the main recreational deck, which is
on the top level of the Tower's pedestal. An additional swimming pool and
sun deck is located on the first Penthouse level. The facilities are shown
under Tab 6 of the Supporting Documents.
(6) Screens and buffers;
Landscaping and buffer areas are indicated on the Landscape Plan,
under Tab 6 of the Supporting Documents.
(7) Refuse collections areas;
Waste removal and recycling will be provided by a private company. The
facility is shown on the Ground Floor Plans under Tab 6 of the Supporting
Documents.
(8) Access to utilities and points of utility hookups.
Access and connections to site utilities are discussed in the Site Utility
Study located under Tab 3 of the Supporting Documents
(e) Tabulations of total gross acreage in the project and the percentages
thereof proposed to be devoted to the permitted uses
and ground coverage.
(1) The various permitted uses.
FLOOR AREA CALCULATIONS
The FAR and Floor Area Calculations are identified in the Data
sheets under Tab 6 of the supporting documents.
(2) Ground coverage by structures.
BUILDING FOOTPRINT
•
The total Building Footprint and Ground Coverage are identified in
the Data sheets under Tab 6 of the Supporting Documents.
(f) Tabulation showing:
(I) The derivation of numbers of off street parking and off street
loading spaces shown in (d) above:
The off street parking and loading spaces are identified in the Data
Sheets under Tab 6 of the supporting documents.
(g)
(2) Total project density in dwelling units per acre.
The project does not contain dwelling units
If common facilities (such as recreation areas of structures,
private streets, common open space, etc.) are to be provided for the
development, statements as to how such common facilities are to be
provided and permanently maintained.
All common facilities will be maintained by either the property owner or the
hotel management company.
(h) Storm drainage and sanitary sewerage plans.
Storm drainage, water distribution, wastewater and solid waste generation
provisions are discussed in the Site Utility Study located under Tab 3 of
the Supporting Documents.
(i) Architectural definitions for buildings in the development; exact
number of dwelling units, size, and types, together with typical floor
plans of each type.
The project does not contain dwelling units. Details pertaining to the
building are included under Tab 6 of the Supporting Documents. The
Retail Area is also shown under Tab 6 of the Supporting Documents.
(j) Plans for signs, if any.
Retail identification signs will be located on the storefronts. The signs will
be sized and styled in compliance with the required regulations. A
6
•
•
Retail/Commercial Tenant Design Booklet is planned.
(k) Landscaping plan, including types, sizes and locations of vegetation
and decorative shrubbery, and showing provisions for irrigation and
future maintenance.
(I)
The Landscaping Plan located on Sheet LA-1.0 through LA-1.1
under Tab 6 of the Supporting Documents, specify the plant types, sizes
and locations, as well as indications that all planted
areas will be fully irrigated and maintained by the property owner and
hotel management company.
Plans for recreation facilities, if any, including location and general
description of buildings for such use.
The property has two recreational decks where the recreational facilities
are provided. The main deck will have a swimming pool, whirlpool spa, a
fitness center with exercise room, lockers and sanitary facilities. An
outdoor recreation deck area for lounging and sunning, a multi -purpose
meeting/ and hotel function rooms, and a refreshment Bar is also located
on the recreation deck.
In addition, a swimming pool and sundeck will be located on the lower
Penthouse level
(m) Such additional data, maps, plans, or statements as may be
required for the particular use or activity involved.
The Drawings submitted with this Application are located under
Tab 6 of the Supporting Documents.
(n) Such additional data as the applicant may believe is pertinent to the
proper consideration of the site and development plan.
Elevations and sections depicting the architectural character of the Tower
are included under Tab 6 of the Supporting Documents. Computer
generated renderings of the project are also included under Tab 6.
2. Section 1702,2.1 General Report.
(1)
Property ownership or ownership's and beneficial interest within the
boundaries of the area proposed for Major Use Special
Permit.
Statement of Ownership and beneficial interest within the boundaries of
7
•
the area proposed for Major Use Special Permit are provided in Article 1.B
& C.
(2) The nature of the unified interest or control.
The nature of unified interest or control is indicated in Article 1.
(3) Survey of the proposed area showing property tines and
ownership.
A copy of the survey of the Property is included under Tab 5 of the
Supporting Documents.
(4) Map of existing features, including streets, alleys, easements,
utilities lines, existing land use, general topography, and physical
features.
The existing site features and utility lines are shown on the survey of
Property located under Tab 5 and the Site Utility Study located under Tab
3 of the Supporting Documents. The following exhibits are also
included with the Major Use Special Permit Application:
(a) Location Map: Map of the surrounding street system indicating the
project location.
(b) Aerial: Aerial photograph of the surrounding area indicating the
project site.
(5) Materials to demonstrate the relationship of the elements listed in (4)
proceeding to surrounding area characteristics.
The Drawings Submitted with this Application are located under Tab 6 of
the Supporting Documents.
(6) Existing zoning and adopted comprehensive plan designations for
the area on and around the lands proposed for Major Use Special
Permit.
The existing zoning designation for the Property pursuant to City of Miami
Ordinance No. 11000, as Amended is SD-6. The Zoning Atlas Map on
plate 23 indicates the existing and surrounding zoning. The surrounding
zoning is primarily SD-6 and R-4. The comprehensive plan future land
use designation for the Property is "High Density Multi -family." The
zoning and the comprehensive plan designation are consistent with one
another.
•
•
•
3. Section 1702.2.2 Major Use Special Permit Concept Plan.
a. Relationships of the concept plan to surrounding existing and
proposed future uses. Activities, systems and facilities
(transportation, recreation, view corridors, pedestrian systems,
services systems and similar uses).
Article II contains a written narrative of the Project outlining proposed
uses, activities and architectural character. This narrative also contains
descriptions of the Project's relationship to traffic, pedestrian movements,
and transportation access. Maps are provided to indicate the Project's
relationship to surrounding streets, land uses and functions. Building
elevations, sections and perspectives showing the proposed materials,
vertical profile and height, and orientation to streets is included in the
Drawings Submitted with this Application. The list of Drawings Submitted
is found under Tab 6 of the Supporting Documents.
b. Existing zoning and adopted comprehensive plan principles and
designations.
The Project conforms to the SD-6 zoning for this Property. The
comprehensive plan future land use designation conforms with the
land use designation currently in effect for this Property.
4. Section 1702.2.3 Developmental Impact Study.
a. A traffic analysis shall be submitted for an area within approximately
1/4 mile of the site, or an area including the major intersections to be
impacted by the site, whichever is larger.
The Traffic Impact Analysis is included under Tab 2 of the Supporting
Documents.
b. Economic impact data shall be provided, including estimates for
construction costs, construction employment, and permanent
employment.
The Economic Impact Study is included under Tab 4 of the Supporting
Documents.
c. A housing impact assessment.
The Project does not include residential units. It will contain a 350 room
9
•
•
•
hotel in the tower and approximately 40,000 square feet of office located
in the pedestal.
d. A description of proposed energy conservation measures shall be
provided, including only those measures that are proposed in
addition to the minimum requirements in State Energy Code.
Architecturally, the building envelope will be comprised of insulated walls
and roof. Heat resistant, tinted glass will be used throughout the building.
Extensive use of wall shading by means of balconies will be implemented.
Electrically, all exterior and landscape lighting will be controlled by means
of time clocks and photocell switches. Energy saving lamps, ballast's and
fixtures are being considered in all common areas.
Energy Star Appliances will be installed where appropriate.
e. Historic buildings.
The site is vacant and current utilized as a staging area for nearby
construction and as a lot. There are no historic structures located on the
Property.
Environmental zone.
The Property is not located within an environmental preservation district.
A Certificate of Appropriateness has been previously granted as part of
the previously approved MUSP for Miramar Centre Phase II and III.
10